Can't Display Clip Art On Calculation

Dec 29, 2006

I am getting the error message "can't display clip art" when pressing F9 on a workbook.

I already tried to install something with Run that did not work

View 5 Replies


ADVERTISEMENT

If XX Then Insert Clip Art

Sep 14, 2008

Is there a way to use VBA for a condition of the type:

if C1-B1 < 15 then insert a Cloud from clip art?

If it is possible, how do I adjust it, roughly, to the area where I need it to be?

I would need it to be on top of E4:C6.

View 19 Replies View Related

Inserting Clip Art Into A Cell

Dec 6, 2006

Is it possible to insert clip art into a single cell...or is it possible to create a custom symbol?

View 9 Replies View Related

Display Results Of Calculation In Red Or Green?

Oct 10, 2011

If the results are < or = to 60, then I want result to be green. If the result is > 60, then I want to result to be red

View 2 Replies View Related

Visual Display When Manual Calculation Required

Jun 30, 2009

In as much as I would like to heed the advice of this site to avoid setting excel calculation to MANUAL, I think I have no choice this time. I have a file that uses a lot of SUMPRODUCT(--) and array formulas. DSUM would have been faster but this file I am working on will be sent to users who barely knows excel. When they need to insert rows, the DSUM criteria will have to be reestablished and I do not think they are capable of that. Anyway...when calculcation is set to manual, all excel does to warn users is the little test "Calculate" in the status bar. What I would have liked is that a red button with text "CLICK TO REFRESH" to appear when calculcation is needed i.e. status bars is showing "Calculate".

View 2 Replies View Related

Make A Calculation(addition) And Use The Answer To Multiply Against Another Addition Calculation

Nov 19, 2008

make a calculation(addition) and use the answer to multiply against another addition calculation....

The sum of (Monday!A1:A4) multiplied by the sum of (Monday!B1:B4) plus (Tuesday!A1:A4) multiplied by the sum of (Tuesday!B1:B4) and so on.

View 2 Replies View Related

Cell B1 To Display True If Any Of The Values In Column C Match Otherwise I Want To Display FalseOR Function Confusion

Dec 16, 2008

Example:....

i m wanting Cell B1 to display true if any of the values in column C match otherwise I want to display false.

A 1
B 0
C 0
D 0

But I can't determine how to get this done.

View 5 Replies View Related

Formatting / Display - Field Not Display 0 If It Is Empty On WHITE Sheet

Mar 14, 2013

I have attached the spreadsheet for reference. All other sheets pull information from the WHITE sheet.

I want the columns for unit price, discount and total to be set to two decimal places but I also don't want it to show anything if the field has a 0 value (so if i only have a few items I don't get lots of o's).

To get the field to not display a 0 if it is empty on the WHITE sheet I have been using "0;-0;;@" which I found on the net. If I use this then it negates the two decimal places.

This also includes the WHITE sheet.

View 3 Replies View Related

Using VLOOKUP To Display Date If Present, If Not Display Today's Date

Feb 26, 2009

I'm currently using an IFERROR, VLOOKUP formula to display an availability date for a product.

Atm, it reads some like this

View 3 Replies View Related

Time Display / Non Display.

Jun 1, 2009

I have 2 columns E and F that I am using, in Column E, I enter a time say 22:43:00, column F currently ads 15 minutes to what ever is in there with '=E3+TIME(0,15,0)' which is fine except if column E has no time in it when it automatically puts in 00:15:00, hov can I get the cell not to display anything in there is no value in column E.

View 2 Replies View Related

If Number Is Positive Display In D20 - If Number Is Negative Display In D19?

May 12, 2014

I'm trying to create a completion statement on where I will add up the money my client has sent to me and also add up the money I need to pay out in order for them to complete their transaction. The end result I want is I would like to display whether my client has given me to much money and I need to repay them. Or if they haven't given me enough then I need to invoice them. I need excel to display for me after all the figures have been added and subtracted if the end figure is negative then display in D19 (balanced owed to you). If the end figure is positive (Balance required from you) display in D20.

View 12 Replies View Related

Calculation Up To A Set Value

Oct 12, 2007

I have a series of monthly revenues and want to calculate each month a commission % - but only want this commission calculated up to a defined limit from the previous months and current month and then to stop when the limit is reached.

View 13 Replies View Related

SLA And KPI Calculation?

Jan 30, 2014

A
B
C
D
F
1
Received
Overdue
Completed
Untouched

[code]....

Overdue is received in previous slot and still under dependency.

Formula used for untouched - B2+C2-D2

SLA Target Min - 98% and Max 99%

Algorithm - (Total Number of Allocations completed within 5 business days Plus Type A Exclusions) / Total Number of Allocations received minus Type B Exclusions) * 100

I need a individual SLA achieved % which includes untouched too.

View 1 Replies View Related

IF Calculation

Nov 10, 2008

Hoping someone might be able to kindly help me out with this one. It's for a spreadsheet of call charges (credit crunch thing).

On the sheet, I have the call charge up to an hour ($H$5). Over an hour, it's charged per minute at the rate in $H$6.

In cell E27 I can enter the number of minutes for the call.

So basically, if E27 is up to a value of 60 then the cost is just H5, if the value in E27 is 61 or more then it's H5 + (E27-60)*H6.

I'm thinking it's an 'IF' but keep making a mess of it...

View 9 Replies View Related

YTD Calculation

Jan 15, 2009

How do I calculate YTD from 1 MTD cell? The YTD cell needs to keep a running total of the MTD cell. If the current YTD cell has the number 11 in it and I typed 2 in the MTD cell the YTD cell needs to increase by 2.

View 9 Replies View Related

Calculation Within A Pivot

Dec 11, 2013

What I need is to add a field that gives a gross margin percentage for a project.

To begin, I simplified the following data that the Pivot Table is using. Project (10 different projects), Account Number, Account Category (Revenue, and Cost), Debit Amount, Credit Amount, and a manually inserted column named Total (CR Amount - DR Amount). See 1st image. Pivot1.jpg

I have designed the Pivot table so it lays out like this. Pivot2.png Pivot3 (2).png

I have been trying to enter a calculated field that would automatically provide the Gross Margin Percentage. In the 2nd image, the Grand Total is the gross margin, but I am unable to use that as a selection when creating a calculated field.

View 3 Replies View Related

Automate The Calculation?

May 21, 2014

I am trying to figure out the calculation steps that Goal Seek is doing behind the scenes so I can create the formula rather than clicking on goal seek whenever I need to make a change. I need to maintain certain weeks of supply every week depending on the sales. Let's say i want to maintain 5 weeks of supply every week, I would like to insert a column for "Suggested To Order' column that would change if weeks of supply goes below 5. In this scenario I would do a Goal Seek, but I want to automate the calculation so I don't have to do this step every week.

View 2 Replies View Related

Hh:mm:ss Time Calculation

Nov 5, 2008

i need to total a range of cells, however, these contain time values; hh:mm:ss. it shows me the total when all cells are highlighted. but =sum() doesn't work.

View 2 Replies View Related

Activate The Calculation?

Mar 4, 2009

I have a spreadsheet with several formulas where I have to go into each one of them to activate the calculation. I use F2 and enter. Automatic calculation is on. Do any of you know how this can be done automatically. A VBA-code will fit the purpose.

View 3 Replies View Related

Calculation Direction....?

Aug 26, 2009

My understanding of Excel is that the calculations are performed in Column A first and then down through the rows in Column A. After all the calculations are finished in A, the calculation moves over to Column B and down the rows in B. Is this true?

I know that Excel is a little more complicated than that especially when it creates a queue for calculations, etc. However, assuming there's no calculation list/queue, would the above be correct?

View 4 Replies View Related

Use IF And ROUND In Same Calculation

Oct 23, 2009

I'm creating a spreadsheet to calculate materials with the following columns Cost/10% of Cost/Customer Cost/Qty/Total cost.

I understand that whilst showing rounded to 2 decimal places excel stores more than this in the cell. which then throws out the Total cost by a few pence.

My research leads me to believe I need to use the ROUND function but I'm unsure which cell to use it or how.

View 2 Replies View Related

Solve Day Calculation

Oct 26, 2009

I have spreadsheet that tracks the the rain total for several days. I would like to be able to break it down to the days of weeks that has rain and how much without manually imputing the data.

Days | #of times | total amount
Mon
Tue
Wed
Thu
Fri
Sat
Sun

View 5 Replies View Related

Calculation According To Date

Nov 9, 2009

I have a data in excel , sample sheet attached.

and i have another place for compile where all the data is summarized

What i want is

If the agent name is example 1 and his mistake is present in raw data and it matches the agent id , date and financial then i want excel to calculate how many " financial " error agent made on that particular date only so that i can assign to another agents too , to get exact data no matter in whichever series that data is inserted in excel.

if i use countif and if all the condition are met it shows me all financial mistakes count and if it shows false it turns to zero . if agent make " financial mistake " on 1st nov and he made another non financial mistake then as it should show only the count of that particular agent " financial mistake " on that date only from the given RANGE DATA

View 11 Replies View Related

Calculation Of Average In Vba?

Feb 12, 2014

I use VBA with the macro recorder. Now I'd like to programming a code to calculate the average of three cells.

I've done a lot of measurements about 180 but it can be also more. For one test object I've always done three measurements to get then an average.

My values are beginning in cell C2:CXXX, D2:Dxxx and E2:Exxx. For example I'd like to get the average from C2:C4, D2:D4 and E2:E4. The result of C2:C4 I'd like to have in cell H2, the result of D2:D4 in cell I2 and the result of E2:E4 in cell J2. Then the next calculation is C5:C7, D5:D7, E5:E7 and the results in H3, I3 and J3. And so on.

I've attached my excel file, maybe I didn't explained it well. The VBA-Code is for sheet Export.

CalculationE.xlsx

View 5 Replies View Related

Year Calculation...

Oct 25, 2009

Is there an in-built function within Excel that will help me ascertain what year is next year, and what year is the year before current? I am using =YEAR(TODAY()) to ascertain what year we are currently in, but cannot figure out how to go one backwards and 1 forwards?

View 2 Replies View Related

Slow Calculation

Dec 5, 2009

I got a work sheet with 672 columns of information that im trying to cross compare against. I wanna compare each column against every other column in that row. I have 200 rows of data. That means each i need excel to do 226,128 comparion calculations each row. So that means in the entire work sheet its gotta do 91 million comparisons. Im on a dual core 1.8ghz core 2 duo cpu and 2 gigs of ram on xp pro with excel 2007. I even bumped up my virtual memory by 3 times the size it was yet still its taking forever.

Its taking over 3 hours to do this whole page of calculations. So i opened up visual c++ and quickly programmed in the same code with some generic values and within 3 seconds it computed it all. My guess is that the bottle neck is when excel has retrieve data from the cells because other than that i cant figure out why its so slow. Heres a section of my

View 14 Replies View Related

Calculation Between Two Dates

Jan 26, 2006

I need to find out the amount of time between two dates for filling out
funeral benefits. The form asks how long the person has been alive in Years
Months and Days.

I would like to know if I put for instance 10/21/1955 in say A1 as the birth
date and 01/25/2006 in B1 as the date of death. So what is the formula, if
one, to calculate the time in years months and days that has passed between
the two dates?

View 11 Replies View Related

Month End Calculation

Mar 22, 2006

I am writing a formula to calculate the last and next month end e.g. if I
enter 28-02-06, the expected result will be liked 31-01-06 and 31-03-06.
28-02-06 will be stored in cell A1, and my expected result will be displayed
in A2 & A3.

My formular is liked " =A1-31 , = A1+31. But because of "31"
has to change each month, therefore if doesn't work to my calcaulation.
Also, from the above example, the calculation for March is correct "31-03-06"
but the January is worng, it comes date on 28-01-06. But I need both result
at the end of the month.

View 12 Replies View Related

Date Calculation

Sep 19, 2006

I have a start date, generated onto cell B4 from a user form datepicker control. I also have a course type in cell C4 that course has a constant number of days. I would like to add the number of days of the course to the start date to give me an end date in another column.

View 9 Replies View Related

IF/THEN Statement With Calculation

Nov 6, 2008

I would like to perform what seems like a simple calculation: =IF C1>0, THEN A1-C1, IF C1=0, THEN DO NOTHING. How would this look as a formula?

View 4 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved