Calculate Overlap

Oct 7, 2009

Here is my data

Range A1:L8

1234567891011Overlap111122275%22275%22250%22225%2220%2220%

I am trying to figure out a formula in L3 which is the calculation of overlap of region1 and region2. The top row is the number of days. What formula can I use to calculate the percent overlap? The numbers in column L show the expected result.

(Using XL 07)

View 9 Replies


ADVERTISEMENT

Calculate Total Hours If Time Ranges Overlap

Aug 4, 2013

I am trying to determine the total hours of downtime accumulated when there are 2 or more machines down during the same time period. To do this, I need to be able to determine if at any point there are 2 or more pieces of equipment down at the same time, and if this is true, how many hours were overlapped. The attached spreadsheet shows how the data is presented.

View 7 Replies View Related

Overlap Between 2 Columns?

Oct 17, 2012

I have two columns.

Column A is a list of Sales Reps over 100 of them with different names.
Column B is a list of Products attached to the Sales Rep. For each Sales Rep, it can vary from 5 - 10 different products

I want to find out whether any products are assigned to the same Sales Rep. How do I do so?

View 2 Replies View Related

Overlap In Charts In Excel?

Dec 5, 2013

I would like to know is it possible to overlap the data & view it as Chart format.

View 1 Replies View Related

Data Label Overlap

Nov 21, 2006

trying to update pie charts via vba. This is working fine, but I have a problem with the data labels. The number of categories can change each time the macro / data is run. This is as it will be for different customers that takle different products.

When the data labels are remapped, those with a small percentage end up placed untop of one another. I have already played with grouping these small percentage together into an 'Other' Category which works fine, but I know I will be asked to split this out.

Is it possible to add a condition that states 'DATA LABELS MUST NOT OVERLAP' - or is there some way of working around this to the same effect...

View 4 Replies View Related

2 Y-Axis Barchart Without Overlap

Aug 23, 2007

im trying to plot two series of data on the same chart, as a bar chart, say for e.g:
how many people eat oranges on any given day in a month on the primary y axis and how oranges 1 person eats in day on the secondary y axis..... thats all fine but when i add the series as a bar chart is overlaps the bars.... each series is on the correct axis i just dont want them one behind the other, is there a way i can have them next to each other. edit*based upon the comment below i have attached the image*edit

View 8 Replies View Related

Highlight 2 Cells With Times Of Day That Overlap?

Jun 19, 2014

I want 2 cells that are not next to each other and that contain times of day to highlight only if the times overlap, I cant figure out how to make the conditional formatting do this...

View 2 Replies View Related

Align Shapes No Overlap Or Gaps

Nov 20, 2006

I am trying to get two shapes to butt up to each other. Unfortunately the shapes either leave a small gap or a slight overlay. I have tried using Ctrl + arrow key to move in small increments, but that didn't work. I have also tried adjusting the width of the rows, but the rows jump backwards or forwards to a number instead of staying with the number I entered. I want to create a seamless shape out of many different shapes.

View 6 Replies View Related

Negative Chart Values Causes Overlap With Data Labels

Sep 2, 2007

I have a Column Graph that will be changing automatically as the data is changed. My problem is that for one set of data the chart looks fine....but if a number becomes negative the bar will overlap with the data labels at the bottom and cause it to be unreadable. I am not able to resize the x axis area or move the labels down any. Is there anyway to make the labels adjust automatically?

View 3 Replies View Related

Calculate The Value In The NPV

Aug 29, 2008

I have two columns in a payment schedule (which adjusts according to certain user inputs) that I need to use in my NPV calculation.

The first column is the Total Payment and the second is Inducements.

Therefore each value in the NPV calc. needs to be the sum of a given period's payment and inducement (but i don't want/have a separate column which calculates the sums). The number of periods adjusts with the users input of Term. There also may be periods where there is a payment but no inducement.

View 14 Replies View Related

Calculate Down To Last Row

Dec 22, 2011

The formula below calculates between rows 2 and 109. How can I change it to calculate between row 2 and the last used row in the sheet.

Code:
Range("D2").Select
ActiveCell.FormulaR1C1 = _
"=(RC[-1]-MIN(R1C[-1]:R109C[-1]))/(MAX(R1C[-1]:R109C[-1])-MIN(R1C[-1]:R109C[-1]))"

View 2 Replies View Related

Calculate IRR & NPV

Jan 10, 2007

i got a problem to calculate IRR and NPV for my company cash flow. i so confuse how to calculate cos the initial investment (expense) is pay in installment by yearly basis. i hope anyone can help me to solve this problem.

I m not sure whether what i'm doing is correct or not. thanx

http://spreadsheets.google.com/ccc?k...Hd2JSrIj7H-Pew

View 9 Replies View Related

Calculate How Many Of The Same Value In A Row?

Feb 17, 2007

If I have this serie of values in the A column:

34
33
33
33
30
29
26
26
20
19
17
17

And want this results in the B column:

1
3
3
3
1
1
2
2
1
1
2
2

Those numbers will indicate how many of the same are in a row.

What's the easiest way to accomplish this?

View 7 Replies View Related

How To Calculate Age

May 13, 2009

to calculate the age from the format date of birth shown below.

SQL Data  S1Date of Birth2Jun  9 1947 12:00AM3Jan  1 1957 12:00AM4Jan  1 1958 12:00AM5Jan  1 1956 12:00AM6Jun  4 1951 12:00AM7Dec 10 1963 12:00AM8Jun 17 1958 12:00AM Excel tables to the web >> Excel Jeanie HTML 4

View 9 Replies View Related

Sub Calculate

Feb 24, 2010

I am trying to call a sub calculate but I keep getting errors, is calculate a reserved sub name?

View 9 Replies View Related

Calculate Net Pay After Tax

Feb 18, 2008

building a spreadsheet. I have the total price in cell f6. In cell C6 I need price with no taxes. D6 should be the pst of 8% and E6 should be the gst of 5%.

View 3 Replies View Related

Formula To Calculate GST

May 6, 2013

Formula to calculate GST? I have a Non-capital and a Capital column, then a Claimable GST column.

I currently have '=SUM(E5/11)' in the Claimable GST column (G5).

If E5 is a zero value I need the sum of F5/11 in G5.

View 2 Replies View Related

If Blank Do Not Calculate

May 16, 2014

I have the following scenario on the attached worksheet: I need b45 to say 0% if b42 and b43 are left blank.

View 3 Replies View Related

Calculate Percentage Of Value

Jun 21, 2014

I have a simple issue i cannot figure out how to write a formula for.

In A2 i have the number of operations.

In A4 i have the percentage of CPU usage it requires to complete those operations.

I need an output somewhere that will tell me how may operations I can get per 0.1% of CPU usage.

View 5 Replies View Related

Calculate Until Difference Is Zero

Jul 24, 2014

I'm trying to automate the attached schedule so that the formulas in H stop increasing once the amount in column J equals zero. So far everything I've tried either gives me a circular reference error or ends up giving me the same result as if I depreciated the asset an additional month.

View 3 Replies View Related

Formula To Calculate TAT?

Feb 22, 2014

I need to calculate a TAT formula for the below case

P1 -- 1 Hour
P2 -- 2 Hour
P3 -- 4 Hour
P4 -- 8 Hour

Shift Start time : 6:30pm
Shift End Time : 3:30am

Suppose a request comes at 9:30pm and it is Priority 1 (P1) then it should be completed at 9:30pm + 1 hour = 10:30pm. I have given the below formula to execute this

=IF(A2="P1",1,IF(A2="P2",2,IF(A2="P3",4,IF(A2="P4",8,0))))

=B2+(TIME(D2,0,0))

The problem here is if the request is P4 then its 8 hr TAT and the formula will calculate the time as 5:30am. Since the shift time end at 3:30am itself the actual TAT should be the next day 8:30pm.

formula to calculate the TAT which includes the start time and end time and also excludes the weekends and holidays.

View 14 Replies View Related

How To Calculate Overtime

Sep 5, 2008

I am trying to formulate a formula that will calculate overtime hours worked.
Now standard hours are 17:30pm - 20:45pm. Anything outside these hours are overtime. If the start time is 18:00pm then the person is still paid from 17:30pm @ standard rate regardless.

Now I am trying to work out a formula that will cover hrs outside of the standard hrs AND hrs unworked but paid for.

see attached! September tab {blue highlighted cells}

View 9 Replies View Related

Calculate The Date..

Feb 23, 2009

Is there a formula for calculating date for every 2nd thursday of the month excluding holidays?

View 4 Replies View Related

Calculate Variances

May 14, 2009

Just wanted to find out if the formulas in the attached apreadsheet are correct. Formulas from E6 to E10.

Also, if you multiply the "new daily target" with "working days" should'nt this give you the "remaining" figure? Currently it's not doing this

View 11 Replies View Related

Calculate The Hours

Jun 16, 2009

How to calculate the Hours
Check the attached file

View 5 Replies View Related

Calculate Retrospectively

Jul 14, 2009

I need to create a formula to work backwards from a closing balance to establish an inventory value on First In, First Out principles. The attached spreadsheet probably explains it better.

View 2 Replies View Related

Calculate Total

Aug 13, 2009

I need a formula that will calculate the total of the items in column "W" when the row directly below it contains a "1" in column "V". It will need to calculate the totals from that row all the way up to the next row that contains a "1" in column V.

Example:

In X14 (where I will put the formula) it would total W9 through W14. However the formula still needs to be able to calculate the total if there are more or less cells to sum. So that the same formula could calculate that in X8 it will total W5 through W8.

View 14 Replies View Related

Calculate A Certain Weekday

Oct 28, 2009

I need to set up something that "calculates" an orders next delivery date. We deliver on Tuesdays, Wednesdays, and Thursdays for different stores. IE.

Store 1 - Today's Date-Wednesday 10/28/09 = Next delivery date is Tuesday 11/3/09.
Store 2 - Today's Date-Wednesday 10/28/09 = Next delivery date is Wednesday 11/4/09.
Store 3 - Today's Date-Wednesday 10/28/09 = Next delivery date is Thursday 10/29/09.

View 3 Replies View Related

Formula To Calculate A %

Nov 2, 2009

I use this formula to calculate a %, but naturally when there is a 0 excel returns the #DIV/0! error. Can someone fix my formula so the error gets replaced with a 0
in the formula the 0 would be in cell W2 =IF(N2="yes",BN2/W2,0.5).

View 3 Replies View Related

Look For Text And Calculate

May 20, 2014

I have 2 columns (A and B) of text, A and B that needs to be turned into numbers in column C. The text in column A can also occur in column B and vice verse. There can also be 2 or 3 values in column B, there is no "," to separate the values only spaces. Every text name has a value (they are explained in the file but not included in original files). If there is text in both columns it has to add the value for each text. I need to get column C calculated by using VBA. Column C is empty from the start and the rows can be +500.

In the file the result is applied manually.

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved