I need to know how to count how many rows have missed a deadline. So I have 800 rows. Each row contains a Due Date(Column F) and a Date Sent (Column AH). I need to know the count of how many of those rows have missed a deadline. Is this even possible to do without having to create some type of separate column?
I am looking for a formula to show me how many words I have left to write by my deadline for my novel. Currently this is the formula I have been using. =P5/(F5-TODAY()) P5 is the number of total words I have left F5 is the deadline date.
The problem with this one is that it tells me how many words I have left not counting today. I want the words I need to reach today not tomorrow.
I have a template to sheet here if you want to look at it. [URL]....
I have series of companies and output ,some values of output are missed how can be replaced by the average of nearst two years values of output or replaced by the following or previous value of output,sample of my data is attached.
I hope this can be done through conditional formatting because I am not familiar with macros.
Column A - order # Column B - shipping method (this will only be air, sea, or blank; I get this through VLookup) Column C - order ETA
I want to highlight Column C..... if Column B=Air highlight if ETA is in 2 weeks or less; if Column B=Sea or is blank highlight if ETA is in 5 weeks or less.
we have a date in a cell let's say : 20/07/2014 (present day 16/05/14)
I need to add a conditional formating rule so when the present/real date will reach 15days before the 20/07/14 and until the speaking date the cell will be colored as notification to upcoming deadline (20/07/14)....
Meaning that the cell will be colored on 05/07/14 and 06/07/14....etc. until 20/07/14.
I have a worksheet which records whether a form was filled out in a specific time period . Now I'm down to the last fews bits.... See on the example attached (Sheet is TOP Report) - I have now managed to put formulas in to work out if the TOP was done in a particular time window, however I now need to figure out for each client which windows were missed, e.g on row 7 I can see by looking that the client missed windows 1 and 4, but is there a way to get excel to tell me this without me having to read each line??
Trying to get a result if I missed 0 hours, I will get a score of 5, if I missed 1 -4 hours, I get a score of 4, if I missed 5 hours, I get a score of 3, etc.
I attached a workbook and it shows data in row 2 - 960. and in cells BA1574 -BM1604 are the summary by using 'sum if' function. As you can see, row 160 countercheck the results and it shows differences.
So my questions are
1) any formula that i can use to ensure all cost centres are taken up in Col AZ1574 - AZ1604? I am sure that i have missed something out.
2) My goal is to summarise the total of each cost centre. Is there other options to reach this goal apart from using 'sum if' function? I would like to learn something new.
I just cannot think through this conditional formatting statement.
The conditions: -- If the current (todays) date is 8 working days after the created date, then highlight in orange -- If the current (todays) date is 10 working days after the created date, then highlight in red
On other words... -- The dates that will get highlighted in red are overdue for processing -- The dates that become orange are approaching the overdue time -- Any dates that are less than 8 working days are NOT highlighted at all
I have an excel sheet with one column containing deadline dates. I want the excel sheet to take each day's date and subtract it from the deadline date. If number of days left is less than 60. Send a mail via outlook to the email against that column.
im running a new bar in Leeds and im trying to create a spreadsheet which will tell me how much to charge per drink to gain a 80% GP on products, ive got as far as listing the products and prices and calculating how much every measure (25ml) will cost. In the past ive used formulas where I can input the price i charge and it will calculate the GP (=SUM(D10/E10)*100-100) for example but id like to be able to type in the GP I want and for it to tell me the price i need, im not sure if tis possible but it will be a massive time saver.
I'm trying to make a worksheet where I can calculate the cost of a mobile postpaid subscription. It is charged per minute and the cost differs depending on which of the 2 available networks the customer is calling to. The first 20 minutes are free, not depending on network.
Edit: Charges to network A is 1,79,- per minute after the first 20 minutes are spent. Charges to network B is 2,29,- per minute after the first 20 minutes are spent.
To sum up: 1. The customer makes a call. 2. If there there are available free minutes, these should be spent first. 3. The customer is charged per minute, depending on network called.
I am on an auto show board and want to come up with a way of calculating the ballots that come in, using excel. Ballot points are accrued as follows: 5 points for 1st place, 3 points for 2nd place, 1 point for 3rd place. With about 25 different categories (classes) and I am estimating participants at around 100.where I can in the automotive field knowing there is nothing besides personal gain.
I am having a problem with some of the cells in a spreadsheet not calculating.
For example, in column A, all the cells have formulas that pull data from another sheet. When I enter the formula, only the formula shows (not the result). I can't figure out what is wrong as the formulas in column B work fine (the results are showing, but not using the same data that column A is).
I am thinking it may have something to do with the data being used to calculate the formulas but not sure. How can I resolve this?
For my Intro to Engineering class, I collected data of two filter media in the laboratory. The data included the % of the media which passed through a sieve and the sieve openings. For use in a certain equation, I need the opening size at the 10th, 30th, 50th, 70th and 90th percentiles. I've tried searching on the Microsoft website but I don't think the PERCENTILE function will work correctly with the given data. I also tried using the slope between points to find the opening sizes at the percentiles mentioned, but doing so yielded different results from my professor's. Attached is the data I collected organized in tables and graphs of the data. I have also attached a pdf file of an example which my professor has given us.
1 - 8 hrs = $55 9 - 24 hrs = $55 + $65 or $120 Anything over 24 hrs - $65 for each additional (24 hrs) ($185)
So if you were locked up for 6 hrs it is $55. If you were locked up for 18 hrs it is $120. If you were locked up for 28 hrs it is $185. And if you were locked up for 49 hrs it is $250. Cell F5 contains number of hours locked up - I would like cell I5 to calculate the cost of the stay. I am proud of myself for figuring out the date and time subtraction - but this part has me stumped.
In order to compute and forecast an estimate of the triennial rent adjustment, i need to compute the rise in the cpi (table) from the lease date (cell c3) and the present date (cell a2) or the closest publishe date existing in the table. The % rise is easy to calculate present index / opening index -1 = % rise in cpi. I update the index monthly when onthe bls publish it.
I input a month as a start date, and then want the next x number of cells to increment by one month based on the start date. I thought this would be easy using the preset DATE function but I can't get the thing to do what I want.
Firstly, i'd like cell G5 to show the amount of time worked i.e diff between E6 & F6. Secondly I'd like help with the formula for cells AF6 & AG6 which would require AB6-AC6 divided by the frames, every time I try it I get a messed up answer.
I had an excellent response last time I posted here, this time I’m stuck again with a new formula. I’m trying to calculated amounts between different times, but keep tying my self in knots with complicated IF formulas.
Is there an easier way to work out hours worked between 2 times, but too complicated things further I need three separate amounts so I’m guessing I’ll need three separate formulas
Hours between 00:00 – 06:00 Hours between 06:00 – 19:00 & hours between 19:00 – 00:00
An example could be, 05:00 – 20:00 should be 1,13,1
I have run into a problem I have not found a solution for surprisingly. I need to calculate several fields on the form prior to saving it and thus exporting the data to the worksheet. All I can find is how to calculate the field in a worksheet and then reference it with VB code on the form. Is what I want to do possible?
If I run into many more problems I may want to shop this project out as my schedule barely allows for the work I have let alone attempting to learn VBA on the fly.
If anyone is interested I can post the project so far along with the detail of what I want it do in the end.
I have the workbook set to Auto Calc the Cells, which seems to be a bad idea, because with the amount of formula in the workbook, it slows the whole thing down and makes it impossible to do anything within it.
Is there a way that I can speed this process up, using some code when I run certain sections?
There is a copy of what I am doing, so you can see the amount of formula.
I have a list of hotel IDs in one column of my spreadsheet. In the next few columns, I have ratings that customers gave the hotel for cleanliness, location, room, etc.
What I need to do is calculate the median of all the ratings for each specific hotel, in a separate column.
I'm sure this will be an easy calculation for most of you...........
If I have two numbers, ie. 390 and 217, how can I calculate the difference between the two figures as a percentage? (These two figures represent sales in two months and I need to know the difference in percentage terms).
I'm looking to calculate OT wages when they happen vs only at the End of Week totals. ie... if the employee hits 40 hours midshift on a Wed, I want to calculate what the total dollars would be for Wed.... a few hours at regular time plus what ever hours above 40 at time and a half.
I've made a spreadsheet that allows the user too enter their clock in and out times in a day for a week, it allows you too fill in two weeks worth (because we get paid fortnightly). It automatically calculates each week's pay once it has been filled in, all I need is a formula too calculate how much they would be paid after tax. I can work how much they will be paid for the 2 weeks befor tax, but I just need a formula too deduct tax from this.