Check 4 Digit Fiscal Year Is Entered In A Cell

May 6, 2009

This is my code. It is for checking that only a 4 digit fiscal year is entered in a cell. The code works fine except it only checks a max of three time. So if the user enters xxx it will prompt for a correct response three times, if xxx is entere a 4th time then that value appears in the cell. I was wondering why this is taking place.

Here is my

View 7 Replies


ADVERTISEMENT

If / Then In A Macro - Changing 2 Digit Year Into 4 Digit Year

Jul 3, 2014

I need a macro where I can highlight a column and change all of the 2 digit years to a 4 digit year (actually, some of the 2 digit years are only 1 digit, e.g. "9" instead of "09").

I have an if then statement that I can use in the column after it, but I'd rather change the actual numbers in the original column, rather than adding another column (and having to keep the original, too).

The statement I had was:
=if(A1>=50,1900+A1,2000+A1)

I just copy dragged down to get the cell numbers for the rest of the column... but using A1 was just for an example, here, it's not necessarily going to be in that column. It needs to be just whichever cells I select.

It seems like it should be pretty simple, but I don't know how to word it in a macro.

Starting Column Example:
12

13

14

99

11

[Code] ......

For some reason I can't get rid of the borders...

View 6 Replies View Related

Fiscal Year Calculation

Feb 3, 2006

I have an issue within Excel and I really hope you can assist me in cracking it. Let me try to describe my problem;

I have a given date, e.g. January 22, 2001
With this date I need to add 4 years, so I simply did cell * 1460 (as that is 4*365), so I end up with January 21, 2005. So far so good...

Now I want to know the Fiscal Year which this month is in.
Example, fiscal year 06 is from June 1, 2005 - May 31, 2006.

This means that I need some kind of calculation to see in which Fiscal Year this date is. In my above example (January 21, 2005) this is FY06, but June 1, 2006 would be FY07.

How can I do this? I experimented with using Year() and Month() and then do some logical check with IF, but I can't crack it... Who could help???

When possible the solution should not have hardcoded years, so even if I enter a date in August 2050 it should still say FY51.

View 12 Replies View Related

Fiscal Year Stats

May 2, 2007

I have a spreadsheet full to the gills of patient information. I have a separate sheet with information from the first spreadsheet like counts of a certain type of tests or diagnosis codes using a 'countif' function. This is based on all the info in that first sheet. I want to make a second sheet with the same basic setup, but only from the patients who visited during this fiscal year. Is there a code I can use to make this happen?

Let's say the date of the visit is in column A and the test type is in column N. The code I'm already using is =COUNTIF(Info!N:N,"*TestName*") How do I get this to return results only if the date of visit was within the fiscal year?

View 9 Replies View Related

Converting 2 Digit Year Into 4 Digit Year

Apr 15, 2008

I have 2 digit years (98, 99, 00, 01) that I need to convert to 4 digit years (1998, 1999, 2000, 2001). There is one year per cell. If it was simply a matter of adding 19 or 20 to the beginning of each, I could do that. But since there's a combination of both 19 and 20 that needs to be added and there all intermingled, I'm not sure how to do it.

Can a rule be written to add 19 to the beginning except if the current cell starts with a 0, then add 20? The highest year is 2008 (no 2010 to deal with).

Example:

98 --> 1998
99 --> 1999
00 --> 2000
01 --> 2001

View 9 Replies View Related

Calculating Business Fiscal Year

Sep 1, 2008

writing a formula that would result in my organizations' business fiscal year.

Assuming the fiscal year is 2008, the quarters are as follows:

1st QTR = 7/2007 - 9/2007
2nd QTR = 10/2007 - 12/2007
3rd QTR = 1/2008 - 3/2008
4th QTR = 4/2008 - 6/2008

When 7/1/2007 is entered, the result should be Q1-2008
10/20/2007, Q2-2008 and so forth.

View 13 Replies View Related

Group By Fiscal Year In Pivot Table

Nov 8, 2002

When I group information in a pivot table by date, and select quarters or years, it is of course based on a calendar year. Can this be done by fiscal years?? using an addin or something, where I set the start month of the custom fiscal year.

View 5 Replies View Related

Get Date From Week Number And Year ( Fiscal Calendar)

Jan 22, 2013

I'm having a data only pull week number and year. We are using Fiscal calendar starting in July. For example, A1 = Week number and A2= Year. How to set up a formula to retrieve a date for this? If A1 = 2 , A2 = 2013, the date will be 07/14/2012. I want the date pull of on Saturday every week.

View 6 Replies View Related

User Defined Function To Return Fiscal Year Of A Date

May 2, 2012

I am working with a fiscal year that starts in December and ends in November. I want to make a user defined function that will return the fiscal year of a date. I've created the below code, but it returns a zero.

Function FiscalYear(DateFY)

If Month(DateFY) = 12 Then
Year (DateFY) + 1
Else
Year (DateFY)
End If
End Function

View 3 Replies View Related

Formula To Output Upcoming Quarter End Date (for A Broken Fiscal Year)

Jan 20, 2014

I am looking to create a function that outputs the upcoming quarter end date based on a specified start date, for which the quarter end is based on a broken fiscal year ending december 15.

As an example, say that you sign up as a customer with an internet provider on 2014-01-01. The internet provider charges all their clients on a quarterly basis and have a broken fiscal year ending on december 15. Hence, as you signed up on 2014-01-01 you will be charged on 2014-03-15, which is the date of the company's first quarter end.

So what I would like to do is to set up a function that outputs the first date I will be charged based on the date that I sign up. If I sign up between december 2013-12-16 and 2014-03-15, the formula should output 2014-03-15. If I sign up between 2014-03-16 and 2014-06-15, the formula should output 2014-06-15 etc. etc.

View 1 Replies View Related

Check If Final Week Of Fiscal Period

Oct 8, 2008

I am attempting to check to see if the current week is the end of a period or not. If it is, I need to display some text, and if it is not, I need to display nothing.

Since I am Computer Science major, the best way I can describe this is through and if structure from a low-level programming lanuage (like C++ or Java):

View 2 Replies View Related

Check Digit For 8 Digit Number

Jun 13, 2014

How to calculate a check digit in excel. The details to calculate this are as follows:

All variables in the calculation are positive integers.

We take each integer of the pro number and multiply it by a value and sum them to get a total.

An Example: 8 Digit Pro Number: 66988757
Pro Number: 6 6 9 8 8 7 5 7
Position in the Pro Number: 1 2 3 4 5 6 7 8
Multiply each digit in the pro number by (10-position) in the number, to achieve a sum.

Using our example pro again:
6*(10-1) + 6*(10-2) + 9*(10-3) + 8*(10-4) + 8*(10-5) + 7*(10-6) + 5*(10-7) + 7*(10-8)
6*9 + 6*8 + 9*7 + 8*6 + 8*5 + 7*4 + 5*3 + 7*2
54+ 48+ 63+48+40+28+15+14 = 310
Take the Sum of the previous calculation and divide it by 11
310/11 = 28

(Actually, it's 28.181818, but since we're working with integers, we truncate everything behind the decimal).

Figure a remainder by multiplying the quotient by 11 and subtracting from the sum.
Remainder = 310 - (28*11) ---> Remainder = 310 - 308 ----> Remainder = 2
Check Digit = 11- Remainder
Check Digit = 11 - 2 ---> Check Digit = 9
Note: if the check digit is 10 or 11, need to subtract 10 from the Check Digit.

View 3 Replies View Related

Macro To Force Format And Check Barcode Check Digit

Nov 27, 2009

My company uses 4 types of barcodes 8, 12, 13, & 14 number barcodes for our products my problem is that I can't figure out how to force the barcode to format properly no matter how somebody enters it if they don't use spaces or put them in the wrong spots, I can't use custom formats because there is 4 different layouts

8 digit should be "#### ####"
12 digit should be "###### ######"
13 digit should be "# ###### ######"
14 digit should be "# ## ##### ######"

these barcodes are in columns L, M, & N also right now 'm using a formula in another cell to verify the barcodes by calculating the check digit and comparing it to the check digit typed the formula i'm using is

View 9 Replies View Related

How Can I Check In Cell C2 That Only Let A Value To Be Entered If G2 Is 10 And F2 Is 20

Sep 24, 2009

How can I check in cell C2 that only let a value to be entered if G2 is 10 and F2 is 20.

I can do the one but not both together

View 9 Replies View Related

Check If Time Has Been Or Is Entered In A Cell

Jul 21, 2007

Is there a simple function to check if a time has been or is entered in a cell, just like the IsDate function.

View 8 Replies View Related

Two Digit Year Changes On Import

May 31, 2006

I am importing data from a .csv file. The file contains dates like 02/15/40. The year is 2040, not 1940. Excel doesn't seem to use the Control Panel -> Regional Settings change when I open this file. I have my Regional Settings set to 2000 => 2099 to change to a two digit year. If I open a blank worksheet and type in 2/15/40 in a cell...Excel does the correct conversion to 2040. However, when I open a .csv file it considers it 1940.

View 2 Replies View Related

Extract 4 Digit Year From String?

Aug 5, 2013

So I want to extract the four digit year found in several strings, for example:

A1: Toyota Camry 1997 Replacement Engine ...

In b1 I'd like to return: 1997 ...

View 7 Replies View Related

Add Fiscal Quarter To Fiscal Macro?

May 13, 2014

I have a Fiscal Date macro that will looks at a date to give me the current fiscal month or week, but I would also like to add the functionality for it to give me the quarter.

In my business, the fiscal year starts in October. The quarters of course are as follows:

Oct-Dec = Q1
Jan-Mar = Q2
Apr-Jun = Q3
Jul-Sep = Q4

I would like for the quarter to be formatted with the year ex. FY14Q1

Here is the Code, but I have also attached an Excel file with the .bas file.

[Code] .....

Attached File : Fiscal.xlsm‎

View 3 Replies View Related

Calculate The Check Digit

Nov 1, 2009

who can provide me a full formula enabling me to calculate the check digit(MOD 10) of the a given number?

View 9 Replies View Related

How To Calculate Check Digit (MOD 10)

Aug 19, 2003

How do I create a formula that will calculate a check digit for a 9-digit number using MOD 10? The weighting is 212121212. The problem I am having is that if the sum of the product is in double digits, they must be treated as individual digits.

Example:

Number To Be Calculated: 0 0 4 4 5 5 5 2 5

Weighting: 2 1 2 1 2 1 2 1 2

Sum: 0+0+8+4+1+0+5+1+0+2+1+0

22/10 = 2 r2
10-2 = 8 (Check Digit)

Is it possible to create such a formula? I need to calculate several hundred and do not want to do this manually!

View 9 Replies View Related

Check Digit For Container Numbers

Oct 24, 2009

I wanna create a buildin check digit for container numbers

so it will exists out of 11 cells. ( GATU 021097-9 )

is it possible when u type any letter/number in the first cell on a row it automaticly jumps to the next cell, repeating this for the full container number ?

View 9 Replies View Related

Sequential Check Digit Validation

Nov 14, 2009

I have a spreadsheet that pulls in a log file after running a macro with 100000eight digit numbers which may or may not have a record in the system. These numbers are produced by using any seven digits and adding a check digit at the end for an eight digit number using the mod function specifically Mod7...=MOD(A1,7) , for example, if cell A1 has 1234567 the mod7 function will produce the check digit 5 then concatenating for the eight digit number 12345675. the next number will be produced by adding 1 to the end of the 7 digit number 1234567+1=1234568 then concatenating again the number with the check digit 6, 12345686. this would be sequential order.

my spreadsheet gets all the eight digit numbers with no record and sorts them in MOD7 sequential order in one column. since the spreadsheet ignores the eight digit numbers with records. my compiled list of numbers have non sequential numbers in the list.

i need a way in VB to loop through 100000 lines (column A) and find the first and last number of a MOD7 sequential range and place the first number in (column B) and the last in (column C).

I have figured a way to do this in a spreadsheet but it takes too many functions and calculations in 100000 lines so the spreadsheet takes too long to open and sometimes crashes!

View 9 Replies View Related

Combining Two Equations With MOD Function For UPC Check Digit Calculation.

Mar 26, 2009

Combining two equations with MOD function for UPC check digit calculation.
I wanted to combine these if possible,

View 4 Replies View Related

Get Sum Of Fields Values Of Database According Entered Year And Month

Jan 2, 2013

As in the attachment example, I use a database (sheet2, where data start from row 3, and headers are in rows 1,2). I've named it as "Data" with a dynamic range name (formula: FFSET(Sheet2!$A$3;0;0;COUNTA(Sheet2!$A:$A)-2;COUNTA(Sheet2!$2:$2)). When I enter a month and a year, in sheet1, I want to get for that year's month:

1) The working days
2) The sums of the fields Totals and each of the other (AA, BB, CC etc.).

View 2 Replies View Related

Number Store As Text & Text Date With 2 Digit Year

Dec 23, 2008

I have a macro which will import data to the worksheet, then perform some formatting on the data, then assign the month & job description based on the lookup table. The problem is that when I import in the data, the data in column B&C will be store as text instead of number and the date in column E will store a 2 digit year instead on 4 digit year which cause error to my macro. I have try to preset the column format to number, i even try to change the column format to number when i run the format macro data. But the problem is still there.

View 5 Replies View Related

Check All Cells Are Entered

Jul 13, 2009

I am using the followng code to check data is entered in a cell ...

View 6 Replies View Related

Check Data Has Been Entered Before Submitting

Jan 20, 2010

i currently have an email button setup, so when the person has filled in the sheet and clicks the button it sends the active worksheet to the specified email address in the code

i need an extra step in this code to check that data has been filled in, in certain cells before the email is sent

for example i have numberous cells but in cell i17 if something is entered then there must be something entered in cell i19. If there is nothing filled in cell i17 then the data validation can ignore this. Basically it needs to check that corresponding cell(s) are filled in "if" the first cell is filled in (make sense?)

i would also like it to check certain cells are filled in (mandatory cells)

here is the email button code, is there anything i can implement in that to produce the above results? or if this cannot be achieved maybe a warning box to pop up before it sends to say "Please make sure everything is filled in corrently before submitting" (something like that)

View 14 Replies View Related

Private Sub To Check When Specific Value Is Entered?

Feb 25, 2014

I want Excel to play a specific sound when a "-" is entered in any cell. How would I go about doing this?

View 3 Replies View Related

Check Which Is A Leap Year

May 28, 2008

I've typed in the following code in VBA to run see which year is a leap year etc. The code is not working form me is this the right function am using?

View 13 Replies View Related

VBA - Check If Data Entered Is Valid Date

Aug 19, 2012

Any way to check if data entered is a valid date using a VBA function/routine?

For example, cdate() and isdate() functions accept dates like 31-Feb-12 and 29-Feb-11 when they are not valid.

If the cell is formatted as date format, then Excel replaces hyphens with forward slashes for dates, except invalid ones like 31-Feb-12 and 29-Feb-11, so in these cases I can test for existence of forward slashes in the following way

Len(Mid(pCell, InStr(pCell, "/") + 1, Len(pCell) - InStr(pCell, "/"))) 7

However this approach fails for Input boxes. Obviously I can't convert the Input box response using cdate function as it will incorrectly accept 31-Feb-12 as a valid date.

Any routines that will work for both cell entered and Input box entered dates?

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved