Extrapolation Calculator - Increase Cylinder Filling Temperature
Jun 10, 2014
I have attached the table with the values and have a red font for problem area.
I need to increase the cylinder filling temperature from 40deg.Celsius to 50deg.Celsius if possible.
O2 Cylinder filling.xls
View 5 Replies
ADVERTISEMENT
Jan 22, 2007
I am using Excel to maintain a database for a computer game I'm playing. One of the things I'm using it for is to keep track of wages that I'm paying in the game. I do this by keeping the total potential wages in one column. As I only pay an employee when I use him, I then copy the wages over to the next column, where the total actual wages per event is calculated. However, when I copy the value from one column to the next (using the lack cross on the bottom right corner of the cell to drag it to the next) the value sometimes increases by one each time.
This isn't a major annoyance, but I'd like to find a way to prevent it happening at all. Does anyone know how to stop the increase?
*
A related issue that I experience is that sometimes when I copy or input a value in these columns, it brings up an error message saying "Number Entered As Text". Is there any way I can prevent this? Both these issues occur apparently regardless of formatting, and only on some of the cells, so I don't know quite why there's any problem at all.
View 2 Replies
View Related
Jan 13, 2007
iam trying to use vba to work out the volume of a cylinder.
If the cylinder's dimenstion are:
Diameter = 200mm
Height = 800mm
the Volume should = 0.00017 cubic meters.
Iam getting 0.502654824574367 as the answer using this code.
Private Sub CommandButton1_Click()
'http://www.readymix.com.au/toolbox/calculators/calcConcreteRoundColumn.asp#
Dim RadiusSqared As Double
RadiusSqared = (txtHoleDiameter / 2) * 2
txtCubicMeters.Value = 3.14159265358979 * RadiusSqared * txtHoleDepth.Value
End Sub
View 11 Replies
View Related
Aug 18, 2008
So I have a Sales Data Extrapolation question.
I have August sales data up until August 17th. I need to extrapolate the data to determine what my sales numbers will look like for the entire month.
Here are some of the specifics: 17 days of sales so far, sold 12,598 units. Total stores 1,500
View 9 Replies
View Related
Jan 12, 2010
How am I able to extrapolate data from vertical to columns?
I.e.
From:
ColumnA ColumnB
Field 1 Result 1
Field 2 Result 2
To:
Column A Column B Column C Column D
Row 1: Field 1 Result 1 Field 2 Result 2
This is different than Transpose.
View 10 Replies
View Related
Mar 26, 2014
I am looking to find out certain values from a current set of data using linear extrapolation in Excel 2010.
I have attached the data i am using below:
Data.png
I need to find out the specific power output and heart rate values, at a set blood lactate value (i.e. When the blood lactate value is exactly 2.0mmol.L-1, what is the given power output and heart rate).
I have tried plotting the data into a line graph with a secondary axis, however because i am unable to change the horizontal axis range for the power output values, i cannot interpret the data in this way.
View 14 Replies
View Related
Nov 2, 2006
I have a test due in the morning, and I really need this question answered ASAP, if anyone could. I need to create an IF formula for this situation: the standard Mhz is 500. Give 55.00 for that standard. But for every increase of of Mhz, give 25.00 per 100 increase.
View 2 Replies
View Related
Jul 30, 2014
I'm trying to graph my temperature readings.I put my readings in 1 page in order for me not to use many pages when Im printing.
Is there a way that if I graph my temperatures it will give me a continuous graph?
View 2 Replies
View Related
Jun 13, 2007
I'd like to try and use an array formula to return the minimum temperature between two dates. Say Column A holds a list of dates. Column B holds the temperatures for each of those dates in column A. Lets say that I want to return the minimum temperature between 10th Jan 2007 and 12th Jan 2007 with the daily temperatures being 9,10 and 11 respectively. I used the following array formula to return the maximum temperature between two dates and it succesfully returned 11: {=MAX( (A1:A10>=DATEVALUE("10/01/2007")) * (A1:A10<=DATEVALUE("12/01/2007")) * (B1:B10) )}
However when I try and use the MIN forumla the answer I get was 0 when it should have returned 9: {=MIN( (A1:A10>=DATEVALUE("10/01/2007")) * (A1:A10<=DATEVALUE("12/01/2007")) * (B1:B10) )}
View 3 Replies
View Related
Dec 11, 2009
I have an Excel document which receives data dump from a weather website cells B1:I20. I need the temperature and dew point from cells B3:I3, however the data is returned in a "Temperature / Dew Point" format. To use the data, I separate the Temp and DP into their own cells B22:I23 by:
View 2 Replies
View Related
Dec 2, 2008
I have a table with average temperatures(120,125,130...220) on the vertical axis and equipment sizes across the horizontal access (size 1,2,3...11). At the intersections is the amount of heat given off the equipment. This table is used as a reference for another sheet in the same workbook.
Basically what the sheet is for is to look up the average temperature of a piece of equipment (given the size and exact heat given off). In order to do this, I need to interpolate using the 2 closest energy values and their associated temperatures. There's a better explanation in the file and it makes for sense when you're looking at it. Attached is the table.
View 3 Replies
View Related
Nov 13, 2013
I had 4 initial temperature values and after some time i got new temperature values. Now for calculating 2nd iteration i need to use new calculated values and for third iteration values from 2nd iteration is to be used and so on.
How to calculate temperature values directly for 10th iteration without solving each iteration?
View 2 Replies
View Related
Jun 17, 2013
I have to excel files
1. Temperature & Humidity Reading
2. Summary
I tried to copy a date from Temperature & Humidity Reading file using the formula ='[Temperature & Humidity Reading.xlsx]Sensor 7'!$C$2 to Summary file
if the date format is like this 6/10/2013 12:00:00 AM the result is fine, but when i try to copy that formula for the succeeding dates the results is same from what i copied.
View 4 Replies
View Related
Jan 10, 2007
I've been trying but excel does not seem to recognise x and y
so here it is
2* X = Z
Where 2 is changable
X = Z-2
Now i just want to find what Z is.
Here's an Example
1.3x - z
1.3(x-.06) = z
1.3z - .078 = z
1.3z = z + .78
1.3z-z = .78
.3z = .78
z = .78/.3
z = 2.6
View 14 Replies
View Related
Jan 26, 2009
I am hopeless at remembering birthdays tbh - so rather than rely on family to remind me, I decided to make a spreadsheet that shows: D.O.B, current age (in years, months, days), and number of days remaining until next birthday.
Please see attached - I can't figure out why the current age calculation is a month out. e.g 'Sebastian' was born on 16 Nov 2008, which makes him 3 months and 11 days old - but '=TODAY()-C16' yields "00 Years 4 Month(s) 12 Days"
Also, 'Leah' has just her birthday - but now where it is supposed to give 'days until next birthday' it gives an error with the formula: '=DATEDIF(TODAY(),EDATE(C4,(YEAR(NOW())-YEAR(C4))*12),"d")'
View 6 Replies
View Related
Nov 16, 2009
I'm building a freight calculator and am considering some professional consulting options, but before I do that I wanted to see if I could overcome this one problem. If I can, I think I might be able to complete the calculator myself.
Here's my conundrum:
A potential customer enters "80802" for zip code and "Solomon" for store.
StoreLocation_________ City_______ State_____ Zip______ Distance
Solomon__________ Arapahoe _______CO ____ 80802_____ 270
Garden City_______ Arapahoe_______ CO _____80802_____ 143
The formula (or series of formulas) I'm looking for would then refer to the following hidden sheet and return Arapahoe, CO and a distance of 270 miles from Solomon.
View 14 Replies
View Related
Feb 11, 2008
i made a claculator in vb.net, and now i have to make one in vba, what i did was as follows, first ill post the code from last year, then my vba attempt;
View 14 Replies
View Related
Jun 19, 2006
I'm trying to come up with an efficient formulae or function to calculate tax
The problem I have is that the tax is progressive. As below
the first 20,000 is taxed at 5%
the next 20,000 is taxed at 6%
the next 20,000 is taxed at 7%
the next 20,000 is taxed at 8%
the next 20,000 is taxed at 9%
more than 100,000 is taxed at 10%
I'm trying to do a formula like below
Cell B3 is my taxable amount
Cell B5 =IF(B$3>20000,20000*0.05,B$3*0.05)
Cell B6 =IF(B$3>40000,40000*0.05,(B$3-20000)*0.05)
This gives me a problem in that for 35k say, I end up with a negative number for the second part in cell B6. My other issue is that each calculation will take up 6 rows on my
spreadsheet. I was hoping to set up a function that could do this in a cell, but even the simple stage defeats me at the moment.
View 12 Replies
View Related
Dec 18, 2008
See workbook attached.
I'm looking for help to detemine rates so it automates in the sheet.
Can you give me assistance and code perhaps ? I'm pretty basic at V-Lookup and If functions. Is this the best route to take ?
All is explained within the workbook.
View 10 Replies
View Related
Feb 20, 2014
Creating a calculator for employees and possibly customers to use to return values based on information inputted. Created a worksheet but thought there may be another way to enter and return the calculated information that may be more user friendly. New to user forms but thought that would work for the user to enter information. Can information be returned from the worksheet to the user form?
View 2 Replies
View Related
Nov 25, 2006
I downloaded the calculator toolbar, and for some reason it doesn't look right, it doesn't resemble a calculator layout at all.
The numbers are skewed, as though the layout is in landscape view instead of portrate. I've tried repeately to delete it from the toolbars menu option, with no success. It's become annoying.
View 9 Replies
View Related
Feb 20, 2007
Is there a way to build a 12 digit calculator in excel?
View 9 Replies
View Related
Jan 30, 2008
im trying to put together a system on worksheets that checks 'Absence' in a rolling 12 month period. The 12 month period is any 12 months and not a financial period (eg 25/12/06 -25/12/07).
I have 36 employees and want to have their names in each sheet, calander dates across the top, will mark either a 'S' for sick or 'L' for late ect against the dates if not at work.
Once an absence has been entered, on the sheet somewhere it will show how many days that person has been off (eg, 10th Oct, 16 Nov and 22 Dec would = 3 Days absence).
How do I set up the sheets to work out how many days each person has had off in a rolling 12 month period (so that it does not calculate beyond the 12 months).
I have looked on here to see if there are any programs, formulas which may work but some have lost me in my tracks.
View 9 Replies
View Related
Jun 7, 2008
I am trying to put together a spreadsheet that works out values based on a persons age or service length.
So in I have the following data in columns starting at B4 and ending at k4:
Date of birth; start date; text; text; text; text; Weekly Pay; Start age; Current Age; Years Service.
The formula I need to provide in l4, m4 and n4 comes from the following rules:
* 0.5 week's pay for each full year of service where age during year less than 22
* 1.0 week's pay for each full year of service where age during year is 22 or above, but less than 41
* 1.5 weeks' pay for each full year of service where age during year is 41+
So in l4 I have:
=IF(J4
View 9 Replies
View Related
Aug 12, 2008
I'm working on a 4-week billing calculator. I rent equipment on a day,week & month rate system. For example: Equipment 1 rents at $30 Day, $90 Week, & $270 a month. If you keep Equipment 1 for 4 days the calculator computes 4 days at a total of $120. The way a 4-week cycle works is the customer will receive the cheaper rate once the daily rate meets or exceeds the weekly rate.
So instead of $120 for 4 days, the calculator tells me to bill him for 1 week at $90 instead and the customer essentially will get the following 3 days at no extra charge until the cycle starts over. As the cycle continues, the same rules apply for the monthly rate in relation to the weekly rate & daily rate combined.
Once the weekly + daily rates add up to equal or more than the monthly, then the monthly rate is used and that's what the customer pays. What I'm trying to do is make a calculator that I input the rates and the rental period and the spread sheet will tell me (based on those rules) how many days, weeks and/or months the customer needs to pay and how much his total dollar amount will be.
View 9 Replies
View Related
Feb 6, 2009
Not sure if this is do-able but I figured I would try. For a golf league coming up later this year I want to figure out how many Birdies, Pars, Bogies, Dbl. Bogies and Others each (20) golfers have during the season. After each round I would input their scores and I am looking for a program that would look at the score of the hole and the par for the hole and figure out what they got 1 under par = birdie, even par = par, 1 over = bogie, 2 over = dbl bogie and 3 over = other.
I started by creating a simple if statement but it ran out too long and my other issue is adding up the number of birdies, pars..etc for each round. Meaning a golfer can have bogies on hole #1 and #2 and the if statement can take care of that but how would get a total saying the golfer had 2 bogies.
Something like this with the - meaning a column.
birdies Pars bogies dbl bogies others total holes
4 - 5 - 3 - 4 - 4 - 5 - 6 - 5 - 8 1 4 2 1 1 9
I would do this each week and total the number of each to keep a running total at the bottom of each column. We play on the same course each week so the pars for each hole can be hard coded.
View 9 Replies
View Related
Oct 22, 2009
I'm building a calculator of sorts for dates. I have a start date in A1. Next to the start date I have a list:
10 days from -start date- is:
15 days from -start date- is:
20 days from -start date- is:
and so on...
I need a formula to return a date that is however many days specified from the start date. If that date lands on a sat or sun I need it to return me the date for the monday after. For example, if my start date is 10/15/09 (thursday) and 10 days from that is 10/25/09 (sunday) I need it to return the date of 10/26/09 (monday). I also need it exclude a range of holidays i have listed.
View 9 Replies
View Related
May 4, 2007
I've been trying to create a Staffing calculator for a call center. Basically the calculator should be able to add up the number of agents for the next 18 intervals based on the login time that is entered by the user. I've just outlined the functioning below:
Suppose 10 agents login at 8 AM (thus logout at 5 PM), the intervals right from 8 AM till 5 PM should show up the 10 agents. Now suppose 10 more agents login at 9 AM, we would then have 20 agents logged in till 5 PM (since agents logged in at 8 will logout at 5) & the remaining 10 till 6 PM. Thus if we have 10 more agents logging in at 10:30, we will have 30 agents till 5 PM, 20 till 6 PM & 10 agents till 7:30 PM & so on. I have attached an excel file to explain the example & the way the calculator has to be built. It is preferrable that the cells containing the login time aren't fixed, but the user should be able to input any login time in any cell.
View 4 Replies
View Related
Jan 22, 2008
Attached is sample data. Target payout is the amount of the base salary a salesman can earn if all goals are reached. Commissions are payed quarterly. Listed on the left are 7 goals, each with a weight of importance toward the target payout amount. The percentage achieved can only be 100% or 0%, nowhere in the middle, although they are allowed to make up a goal later if they do not make it at first. This is where I get stumped. For example, if they don't make a goal in quarter one but make the goal in quarter two plus what they missed in one, they get two quarters worth of commission in quarter 2 for that goal. I am having trouble figuring out the easiest way to go about this.
View 2 Replies
View Related
Dec 4, 2009
I need to create a calculator that tells me how long a invoice will take to be paid using my current processes at work, working days only.
I need to imput the date the invoice is received and then for the rest to be worked out automaticly
I need it to do the follwoing ....
View 11 Replies
View Related