LINEST Function Calculation Using Only VBA

May 7, 2005

I can do least squares fitting utilizing LINEST and a worksheet. (See attachment.)

I would like to do the same calculations entirely within VBA.

I can specify the values as arrays within VBA :

Sub linest2VBA()
'
' linest2VBA Macro
'
' Keyboard Shortcut: Ctrl+Shift+A
'
Dim dXvalSqd(4), dXval(4), dYval(4), dFirstRegStat As Double
Dim i As Integer
Second Question:

Is there a way to get the remaining regression statistics within VBA by referencing only the three arrays: dXvalSqd, dXval, and dYval?

View 3 Replies


ADVERTISEMENT

Linest Calculation

Feb 12, 2010

I'm trying to implement the linest formula in a programming language for my coursework.
I've looked on excel help but it only explains on how the function selects data.

how to the values are calculated and the steps?

View 14 Replies View Related

Formula To Skip Over That Data Point In The LINEST Calculation

Sep 4, 2009

I have instances where my Y variables sometimes contain a zero in the data and i need a formula to skip over that data point in the LINEST calculation.

Y variables are in Row 1, Columns A:E
X variables are in Row 2, Columns A:E

The following formula is returning a #VALUE! error: .....

View 9 Replies View Related

Referring To An Array Column Or Row Of LinEst Function

Jan 13, 2010

I am trying to use the LinEst function in a program. There are some good examples on the web but they all refer to a range in the format “A1:A45”. Is there a way to refer to a column in an existing array instead?

For example (thanks to Shg for this code): ....

View 7 Replies View Related

Autoselect Range/Row Reference For Linest Array Function

Dec 31, 2007

I have set up regression in excel using the linest array function which automaticly updates whenever the data it is references changes. Currently the formula in K3 =
=LINEST(K8:K50,M8:N50,TRUE,TRUE) .

Only the Y range in column K changes and then the formula automaticly recalculates the regression parameters. However sometimes the range of valid data changes with each new update so currently K8 to K50 contains valid values and so the formula works. But if the range of valid data now ends at say K45, and the remaining rows (K46- K450) contains #DIV/0!. In this case the formula does not work and I need to go in manualy into K3 and reselect the range to get it to work (in the baove case to =LINEST(K8:K45,M8:N45,TRUE,TRUE)

Is there anyway I can get the formula to update the range (the number of rows to use) in the calculation automaticly so I don't have to go into the formula in K3 and change the range manually everytime the data changes? Basicly I like to use all rows in column K (from K8 to K50) where there is a values and ignore cells with #DIV/0!

I'm guessing the easiest way to do this would be to set up a dynamic range of some sort that feeds into the linest array function so that the end row reference for columns K and M & N changes depending on where the first #DIV/0! occurs in column K.

View 9 Replies View Related

Passing Cell References From A Cell's Text To LINEST Function And A Graph

Mar 2, 2009

I'm using Excel 2003 and I'm trying to make my LINEST function and the source cells for a scatter graph use the cell range specified in another cell in the document. I figured out that it was simple to do the following:

I250 contains: 10, shows: 10
I251 contains: ="I"&I250, shows I10

But I can't figure out how to do this in a larger function. I've tried a few things but none of them work. Here is an example where I want it to do a LINEST with y values in cells Ja - Jb and x values in cells Ia - Ib (where a and b are integers specified in cells I250 and J250 respectively):

View 9 Replies View Related

Using A Cell With A Function In It To Do A Calculation

Feb 15, 2008

I have this formula: =IF(ROWS(H$12:H12)

View 9 Replies View Related

Formula / Function For Commission Calculation?

Jul 26, 2006

if i could get a hand creating a commission calculation.. here is what i'm looking for and my brain hurts trying to make it... I put in excel an employees gross fees for a month,, their commission calculation is based on the following scheudule, for which i'd love an easy calculation, function, code etc. for..

$0 - $10,000 - 60% commission
$10,001 - $15,000 - 65% commission
$15,001+ - 70% commission..

i'm sure this seems simple, but i just can't get it because if for instance their first gross fee is $12,000, i don't know how to have it calculate the first $10,000 at 60% and the last $2,000 at 65%.

ps.. my excel sheet is set up as follows:
Rows a-g (stuff that is irrelivant)
row h, gross fees
row i, commission (in dollars)

View 9 Replies View Related

Function For Calculation Mode & Status

Mar 10, 2009

I am looking for assistance for 2 vbcode functions that will provide current:

1) Calculation Mode - whether automatic, manual or semi automatic; and

2) Calculation Status - whether a recalc is required or not.

These functions need to work regardless of the calculation mode and always need to show the current status.I have tried creating volatile functions, but the problem I face is that if the calculation mode is manual, the function's return value is not updated unless I force a recalc which renders the purpose of the exercise useless.

View 3 Replies View Related

Date Calculation - Datedif Function

May 11, 2006

I am trying to subtract two dates to find out whether an invoice is 6 months past due (regardless of number of days). I use DATEDIF in my formula and it works fine until now. It seems the function takes number of days into account and won't return the desire result when there are 31 days. I want to find out whether the number of months between two date are greater than or equal to 6 months without considering the number of days. I am attaching a sample worksheet for better explanation. As you can see, October is not working right.

View 5 Replies View Related

Formula/Function For Commission Calculation

Jul 26, 2006

I put in excel an employees gross fees for a month,, their commission calculation is based on the following scheudule, for which i'd love an easy calculation, function, code etc. for..

$0 - $10,000 - 60% commission
$10,001 - $15,000 - 65% commission
$15,001+ - 70% commission..

i'm sure this seems simple, but i just can't get it because if for instance their first gross fee is $12,000, i don't know how to have it calculate the first $10,000 at 60% and the last $2,000 at 65%. any help is greatly appreciated..

ps.. my excel sheet is set up as follows:
Rows a-g (stuff that is irrelivant)
row h, gross fees
row i, commission (in dollars)

View 9 Replies View Related

LINEST

Jun 19, 2008

I have a table something like this (much bigger in reality)

1 5
2 10
5 15
7 #N/A
9 20
12 25

I need to interpret the above data with the linest function, but for a variety of reasons i cant delete the error square. How can i get the LINEST to ignore the #N/A and the 7? otherwise it returns an error.

View 14 Replies View Related

Sum / IF Function Resulting To Calculation Of Block Of Cells

Jun 3, 2014

I have quarters of the year. I'm wanting to find a function wherein when I punch in for example year 2012, the cell would give me the sum of the 4Qs. If if change it to 2013, then it would give me the sum of 4Qs for 2013.

See attached sheet : sum from blocks of cells.xlsx

View 3 Replies View Related

Custom Worksheet Function And Calculation Dependency

Jan 29, 2010

I have written a custom function to be called from worksheet cells. The function is basically a wrapper function for VLOOKUP on a single table. It makes cell formulas shorter, easier to read and self-documenting. Here's a much simplified version of the function:

View 3 Replies View Related

SUMPRODUCT Function With Date Calculation Criteria

Jun 11, 2009

I have a worksheet that contains investment security purchases, including purchase date, purchase amount and maturity date, each in its own row. I need to develop a formula that will sum the purchase amount based upon the term in days (maturity date - purchase date) of the investment. The respective rows do not contain the term in days so the formula will need to calculate the days to determine the aggregating criteria described below.

One cell should contain the aggregate security purchase amount whose term is 1-90 days and another cell should contain the aggregate security purchase amount whose term is over 90 days. It seems that SUMPRODUCT with a condition is the best way to handle this; however, I cannot get the correct syntax of this formula.

View 8 Replies View Related

Data Sorting, Min/Max, Selective Calculation Function

Jul 30, 2007

I'm using Excel 2003 with WinXP SP2.

I'm trying to make a spreadsheet to calculate my GPA for my studies. I can get everything to work fine except I want to be able to calculate an adjusted GPA based on a certain value of classes to drop.

The way it would work ideally is that I would be able to search/sort a data set and if it contained "X" number of entries then the "Y" number of lowest marks would be omitted from the AGPA calculation.

I'm having trouble designing a function/formula or scheme to sort the data range, and identify the lowest "Y" number of entries and recalculate the GPA without using them.

View 9 Replies View Related

Using Function To Perform A Calculation If Certain Values Are Met, Otherwise Return 0

Jun 10, 2006

As an example, cell values as follows.

A1 = 1, 2 or 3, B1 = 2.5

Is it possible to say, if A1= 1 then make C1 equal to B1+4, otherwise return the value of 0?

View 6 Replies View Related

Linest Different From Trendline

Jan 22, 2009

I am using Excel 2007. I have two sets of data. y-series is 58.61, 58.66, 58.71 and 58.76. x-series is 0.8313, 0.8309, 0.8305 and 0.8301.

I am trying to fit a quadratic function to this data. When I plot a curve and fit a trendline I get the coefficients for the equation ax^2+bx+c
a=1.3939e-11
b=-125
c=162.5225
The plotted line seems to fit the data fairly well.

However, I want to use the linest function and I am using the formula:
=INDEX(LINEST(B2:B5,A2:A5^{1,2}),1,1)
I change the index column number as appropriate to get the coefficients:
a=-75.23775
b=0
c=110.603763

The coefficients from linest seem to be way out. how I can get the output from linest to be the same as the trendline?

View 4 Replies View Related

Polynomials (LINEST)

Oct 23, 2008

My "calculated" polynomial is not the same as the Trend line on the graph. The one on the graph seems to be correct.

Basically, I am using the LINEST function to create a polynomial equation inorder to extrapolate data. And also with a given equation, and a given y, find x.

View 8 Replies View Related

LinEst In Vba - Not Using Ranges

Nov 12, 2008

I am calculating variables in Vba and want to find their co=effiicients in the for y=a +bx +cx^2. This works great if I output my variables to excel and then pick up this range however as I am generating the variables in vba and have an array of variables I would rather not have to keep spitting them out to excel then picking them up again. The three important lines in my code are:

c(nFix - j) = WorksheetFunction.Index(WorksheetFunction.LinEst(inpv, Application.Power(inps, Array(1, 2))), 1)

b(nFix - j) = WorksheetFunction.Index(WorksheetFunction.LinEst(Range(Vc), Application.Power(Range(SPd), Array(1, 2))), 1, 2)

a(nFix - j) = WorksheetFunction.Index(WorksheetFunction.LinEst(Range(Vc), Application.Power(Range(SPd), Array(1, 2))), 1, 3)

As you can see for c I am referring to inpv and inps these are arrays. I have tried using inpv(), etc but no luck

b and a work great, here I am reffering to ranges Vc and SPd. As I am going through this a lot of times it seems rather inelegant not to be able to do the whole thing in vba - i would rather not use the dump to spreadsheet then pick up again approach!

View 9 Replies View Related

Combining Two Equations With MOD Function For UPC Check Digit Calculation.

Mar 26, 2009

Combining two equations with MOD function for UPC check digit calculation.
I wanted to combine these if possible,

View 4 Replies View Related

Use LINEST In A Way In Which X Values Unknown?

Jun 23, 2014

is there a way to use LINEST in a way in which the x values are unknown and the y values are known? The opposite of how the function usually runs...?

View 2 Replies View Related

How Can I Use An IF Statement To Loop LINEST

Sep 2, 2008

how to get my LINEST function to work properly. Now, what I'd like to do is have it reduce or increase the order of the polynomial until R^2 equals 1.0, or the polynomial reaches 6th order, whichever comes first.

Can I do this with a bunch of nested IF ELSEIF statements, or is there a cleaner way to do this?

View 12 Replies View Related

Coeffs Obtained By LINEST

Dec 21, 2006

I am trying to obtain the 3 coeffs from a polynomial trendline equation.
The equation produced on the chart is
y = 3.1123x2 + 135.34x + 124.9 from the below info

X Y
1.0 250
2.5 500
5.0 890
7.5 1290
10.0 1800

But when I enter this array formula

{=LINEST(B2:B6,A2:A6^{1,2})}
I get different results.
-48.98,375.89,214.98

View 9 Replies View Related

LINEST - How To Add No-adjacent Columns For The Known_x's?

Apr 27, 2009

I need to know how to selec no-adjacent columns for the known_x's in the linest function:

Example:

'- A B C D E

1) 80 63 9 3 26
2) 80 63 9 3 21
3) 74 65 7 2 30
4) 74 65 7 2 20
5) 63 65 9 3 16

=LINEST(A1:A5,KNOW_X'S,TRUE,TRUE)
Is there any way to select for instance: column B and E as known_x's?

I heard about something where we can select total area and then choose which columns should be considered via "{column1, colum2}"..
That is all is missing for me to finish my project!!! Pls your help!!!

View 6 Replies View Related

LINEST Type Mismatch Error

Mar 1, 2012

I have built a user defined function called: portAlpha.

Code:
Function portAlpha(assetCode As String, indexCode As String) As Double

Dim assetCol As Long
Dim indexCol As Long
Dim assetData As Range
Dim indexData As Range

With Sheets("Data")

[Code] ......

I am struggling to get this to work though. Everytime I step over this piece of code:

Code:
portAlpha = Application.WorksheetFunction.LinEst(Range("M4:M63"), Range("N4:N63"), 1, 1)

I get a "Type Mismatch Error". All the values in the range are numbers, and LINEST should return a double, so I am puzzled as to why there is a mismatch...

I have hardcoded the range into the formula just to try and get it to work. Eventually this will be two variables and will look like this:

Code:
portAlpha = Application.WorksheetFunction.Index(Application.WorksheetFunction.LinEst(assetData, indexData, 1, 1),1, 1)

View 1 Replies View Related

Make A Calculation(addition) And Use The Answer To Multiply Against Another Addition Calculation

Nov 19, 2008

make a calculation(addition) and use the answer to multiply against another addition calculation....

The sum of (Monday!A1:A4) multiplied by the sum of (Monday!B1:B4) plus (Tuesday!A1:A4) multiplied by the sum of (Tuesday!B1:B4) and so on.

View 2 Replies View Related

Calculation Up To A Set Value

Oct 12, 2007

I have a series of monthly revenues and want to calculate each month a commission % - but only want this commission calculated up to a defined limit from the previous months and current month and then to stop when the limit is reached.

View 13 Replies View Related

SLA And KPI Calculation?

Jan 30, 2014

A
B
C
D
F
1
Received
Overdue
Completed
Untouched

[code]....

Overdue is received in previous slot and still under dependency.

Formula used for untouched - B2+C2-D2

SLA Target Min - 98% and Max 99%

Algorithm - (Total Number of Allocations completed within 5 business days Plus Type A Exclusions) / Total Number of Allocations received minus Type B Exclusions) * 100

I need a individual SLA achieved % which includes untouched too.

View 1 Replies View Related

IF Calculation

Nov 10, 2008

Hoping someone might be able to kindly help me out with this one. It's for a spreadsheet of call charges (credit crunch thing).

On the sheet, I have the call charge up to an hour ($H$5). Over an hour, it's charged per minute at the rate in $H$6.

In cell E27 I can enter the number of minutes for the call.

So basically, if E27 is up to a value of 60 then the cost is just H5, if the value in E27 is 61 or more then it's H5 + (E27-60)*H6.

I'm thinking it's an 'IF' but keep making a mess of it...

View 9 Replies View Related