List Working Days Of The Month
Jul 1, 2010
I receive an extract from our Financial System monthly which list all the balances for each date of the month (both workings day and week-end(Sat. and Sun.)).
I would like to create a macro which will extract only working date (Mon.- Fri) and the balances in the columns.
View 6 Replies
ADVERTISEMENT
Jul 14, 2008
I have an excel sheet where I need to insert the working days of the current month in a row. The working days are from Sunday through Thursday, that is, 5 days a week.
For example, for the month of July, 01 is Tuesday and the week ends on 3rd. So the row should look like this:
1-3 | 6-10 | 13-17 | 20-24 | 27-31
View 9 Replies
View Related
Aug 28, 2013
I have the following sheet layout.
COLUMN B
COLUMN C
COLUMN D
COLUMN E
COLUMN F
COLUMN G
[Code] .....
What I'm trying to do, is add a formula via VBA in the "FTE" column (Column Q), which is as follows:
Search row 5 in columns C:N and find the month which matches the current date.When a match is found, take the corresponding value from row 4 and multiply this value by the value in column P.So using the above as an example, the formula in column Q on row 5, would be 22 multiplied by 32.05 giving a total of 705.10.
VB:
Sub Extract()
Dim ws As Worksheet, LastRow As Long
Const StartRow As Long = 5
For Each ws In Worksheets(Array("Direct Activities", "Enhancements", "Indirect Activities", "Overheads", "Projects"))
LastRow = ws.Cells(Rows.Count, "B").End(xlUp).Row
[Code] ....
View 1 Replies
View Related
Mar 5, 2014
I have a access table with two fields named as "Month" and "Bank Holidays". I have put names of the month in this table for 2014 and the corresponding bank holidays of each month. Now I want to write down the piece of code that will execute when a button on the userform is pressed and it should check the current month of the year and then display the total working days ( After subtracting bank holidays of that month and weekends of that month from the total working days of that month).
View 3 Replies
View Related
Aug 19, 2007
Is there a formula to calculate the working days left in the current month? I work in the financial services industry and am putting together a spreadsheet to automatically calculate sales production needs per "working day", based on my businesses schedule.
We are open M-F and Saturday, not including holidays. Now, I can look at a calendar, count the days left and put them in to the spreadsheet, but I'd prefer to have it calculate automatically.
On my spreadsheet, I have used the =TODAY() formula. In the cell below, I would like to have it calculate the actual working days remaining in the current month.
Since today is Sunday August 19th, I know that there are 11 working days left (starting Monday 08-20-2007). Is there a way to get Excel to do that?
View 9 Replies
View Related
Feb 22, 2012
I need to list the days of each month on separate spreadsheets...and need to to do this each year...
I was wondering if in cell A1 I type the first day of the month then is there a formula I can use to put the rest in without having to manually put them all in?
View 6 Replies
View Related
Oct 4, 2006
Is there a formula or code that returns the dates in the month in the current month before today? For example, today is 4th october 2006. so I would like it to return a column of values that include 1/10/2006, 2/10/2006, 3/10/2006, 4/10/2006.
View 2 Replies
View Related
Oct 28, 2009
From another thread I got this formula placed on B5:
=NETWORKDAYS(EOMONTH(B4,-1)+1,EOMONTH(B4,0),Holidays)
his generates the number of working days for that month (regardless of the date on B4) that exclude Holidays listed under the range "Holidays".
I also got this code (Credits to XXXX)
View 4 Replies
View Related
Jan 29, 2013
My problem is , I have a date range 21-Feb-2013 till 07-Mar-2013 (Col C2, Col D2 respectively) which is holiday list for a person.
I am trying to pull out the number of working days for that person in the month of Feb which should exclude weekends.
To get the total no. of working days for the month of Feb, I have used the below formula.
=NETWORKDAYS(DATE(YEAR(C2),MONTH(C2),1),EOMONTH(C2,0))
This gives me a value of 20 which is correct.
Now I need to find no. of days which fall under the month of FEB from the date range 21-Feb-2013 till 07-Mar-2013 (Col C2, Col D2) which are working days. so that I can subtract that from no. of working days for that month (FEB) to get the no. of working days which the person has actually worked.
View 3 Replies
View Related
Oct 30, 2013
I'm currently trying to set up a sheet ...
When setting up a Direct Debit There are 3 options, the 7th, 17th and 27th. I've put these into a drop down list. I need this list to be slightly dynamic. I must allow 10 working days from the date of the arrangment before I can apply the DD.
To explain further. If someone were to want to set up a DD and spoke to me today. If they then requested the DD be taken on the 7th, I wouldn't be able to set it up until the 7th of December as 10 working days are required. I'd like the list to reflect this. I can do it in OO with a simple if / switch but excel is a strange creature and I'm not sure how to approach the problem.
From that I think I also need to calculate the number of weeks remaining in the current financial year. I think I should be able to do this by using the Today() function and some maths.
View 1 Replies
View Related
Jul 31, 2014
I've got the below so far, but where it says V2>=(Q2+5) , I would like it to add 5 working days instead, is this possible?
Code:
=IF(AND(T2="Awaiting",V2>=(Q2+5)),"Overdue","Raised within 5 Days")
It would also be great if there is a way to say that if T2="Not Required, then put "Not Required" in W2 (where the IF statement is)
View 4 Replies
View Related
May 1, 2006
I would like to create a monthly inventory, based on workdays (Monday - Friday)Myrna Larson has a formula that I would like to use with the workday function, but I don't know how to combine them.
=IF(A1="",A1,IF(MONTH(A1+1)=MONTH(A1),A1+1,""))+ = workday
to fit on the page, I need the dates to be from the 1st to the 15th, and 16th to the 31st. I am not sure how to write this either.
View 11 Replies
View Related
Oct 2, 2005
function in a spreadsheet that will list all of the days in
a given month automaticaly with the entry of the 1st of the month only.
Ex;
10/01/05 entered dated
10/02/05 auto fill
10/03/05 "
. "
. "
10/31/05 end of auto fill
I would like the function to stop filling dates at end of the month even for shorted months such as Feb.
View 10 Replies
View Related
Feb 13, 2013
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
Input Data
Result
Start Date
[Code]....
View 3 Replies
View Related
Jun 6, 2014
In A column the date something is received will be entered.
In B column there is a drop down list that has "insured" "Fee" "Aged Debt" "Other".
In C column I am trying to get another date to populate dependant on what is picked from column B, so if Insured is picked then 1 working day needs to be added to the date in column A and populate in column C. If any of the other 3 options are selected 5 working days needs to be added to the date in column A and populated in column C.
I have been using this formula: =IF(B2="","",IF(B2="Insured",A2+1,A2+5)) however this is not working days and I am stuck how to get to add working days
View 4 Replies
View Related
Jan 28, 2009
I have a table with 2 date columns, and I need to subtract one date from another to give me the number of days the job has taken, but this also needs to exclude the weekends. There is no hours involved.
I.e.
Start Date Finish Date Days Taken
22/Jan/2009 27/Jan/2009 4
Is there a formula that i can use to work out the days taken.
there is multiple rows of information, the above is an example.
View 7 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Oct 10, 2007
I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.
So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.
Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.
What formula should I use or if someone could create an example that would be really usefull :D
View 12 Replies
View Related
Nov 26, 2013
Create a formula to count number of days an employee work (in 25 working days and 5 Friday as rest day month):
Example:
If employee works 25 days during weekdays he will get counted as = 30 days
If employee works only 22 days during weekdays with 3 absences during weekdays he will get counted as = 27 days.
If employee works from 1st to 24th and 25th to 30th absence he will get counted as = 24 days.
Other examples and output desired I attached here: Sample.xlsx
View 4 Replies
View Related
Dec 17, 2008
I have a worksheet where in column B I have a vendor name, column E I have a date value and in column AF I need to calculate a due date based on 7 working days for vendor A and 14 days (not working days) for vendor B. I've tried to write an IF statement but can't do it. Can anyone suggest the right combination of IF/AND statements that would do this? I attach the workbook should my useless attempt at explaining my problem be unclear...
View 3 Replies
View Related
Aug 15, 2010
how can i calcaulate working hours between two days.
Working Hours 07:30 - 14:30
e.g. mm/dd/yyyy
start time 01/04/2010 17:34:58
stop time 01/05/2010 08:23:35
View 9 Replies
View Related
Feb 16, 2014
How to find five consecutive working days for the staffs who worked only in night shift basis and if this comes true then to find other night shift for particular staff based on Bank ID and putting those data's in new excel sheet believe this can done through a macro.
Its new assignment to me to find the staffs to make the inconvenience allowance for the staffs who worked in night shift for five consecutive days and if they worked for five consecutive days then they eligible for other night shift days they have worked.
Given the data how it looks in our attendance. In the below data night shift criteria true stands for staffs who worked in night shift and false stands for staffs who worked in day shift.
Serial No
Bank ID
Name
Date
Attendance Type
Start Time
End Time
NIGHT SHIFT
1
1374058
A
17-Jan-14
Login
10:00 AM
7:30 AM
FALSE
[Code] ........
View 1 Replies
View Related
Aug 28, 2008
I have just built a spreadsheet to calculate training hours amongst other things. I have used the function NETWORKDAYS which calculates the number of working days between two dates. This works fine on my laptop which has the analysis tools pack installed. Unfortunately my work place IS policy wont allow the analysis pack to be installed so need to find away around this. Does anyone know a formula that will perform the same function as the NETWORKDAYS. THis is crucial to the accurate calculation of training hours.
View 9 Replies
View Related
Dec 27, 2008
to calculate no.s of workdays between two given dates,
1.We work 06 days a week (so only Sunday is OFF)
2.What if I have some holiday between the given dates + Sunday OFF
View 9 Replies
View Related
Apr 18, 2007
I need to work out the number of working days between 2 dates, where the working week is Monday to Thursday, ignoring all bank holidays etc.
View 2 Replies
View Related
Mar 16, 2014
I want to convert Months into days
E.g. - in my Data F2 = Oct.13 and I want 31 days in F3.
View 3 Replies
View Related
Oct 2, 2008
I need to calculate the number of days chargeable in a given month for a tenancy as follows:
eg Current Month 30 Sep 2008
Begin End No of Days in Month
Tenancy 1 01 Jul 2008 31 Jul 08
Tenancy 2 01 Jul 2008 24 Sep 08
Tenancy 1 01 Jul 2008 31 Oct 08
Tenancy 1 01 Sep 2008 30 Sep 08
Tenancy 1 01 Sep 2008 31 Oct 08
Tenancy 1 01 Oct 2008 31 Dec 08
View 11 Replies
View Related
Aug 13, 2009
Need a way to get/calculate ALL of the days of the months from a date range entered into an inputbox in which a user may enter any day of a month? In other words, the user enters 9/14/2009 in the first inputbox then 10/8/2012 in the second and code would calculate the number of days as 9/1/2009 - 10/31/2012.
Here is the current code I'm using that calculates only the exact days:
View 3 Replies
View Related
Mar 3, 2009
I have is a start rent date and an end rent date. They want to break down how many days in each month the item was on rent so they have a column for each month. For example say an item was rented on 12/14/08 and returned on 1/12/09. It was rented for a total of 30days 18 days in December and 12 days in January. So I would need a function in each column that would return a 14 in the December Column and a 12 in the January Column. there are over 350 rows and they are doing the process manually right now and taking several days.
Also I just noticed that the date range is currently entered as a text in the format 2008-12-14 so YYYY-MM-DD. Don't know if the text will be a problem.
Just attached an expample. In it I am trying to find a function to fill in the green cells.
View 5 Replies
View Related
Apr 21, 2009
I have 5 columns: Employee Name, Start Date, Probation Time, Probation Ends, Benefits Start.
I want the Benefits Start column to populate the name of the month that follows the Probation Ends date.
For example Employee A starts on March 16. Probation time is 90 days. Probation Ends is 6/14/09. The Benefits start date is 7/1/09, however I want this column to just say July.
View 12 Replies
View Related