I need to calculate on a spreadsheet the number of days between a specific date and the date the spread sheet is opened. I need to know the number of days a merchandise has been stored.
View 5 Replies
ADVERTISEMENT
Feb 21, 2014
I'm trying to create a new column which calculates the number of days from the today's date to the due date of an invoice. Also a Column that an invoice is/was overdue.
Column A - Clerk inputs date that invoice was received
Column B - Clerk inputs the date that the bill was paid
Column C - Auto populates the due date of the invoice (20 days after the invoice is received)
Column D - I want a number of days to auto populate based on today's date that will show how many days we have to pay the bill. Example: today is 2/19/2014, bill is due 2/22/2014 (Column C), column D should read 3 (I would prefer is the number is black for "we have days left to pay", red for "we're behind")
*Extra bonus for Column D, if the column goes blank after a date is entered into Column B* - but not necessary
Column E - I would like if the date the bill was paid (Column B) is greater than the date the invoice is due (Column C) to show "Overdue" in the cell.
View 9 Replies
View Related
May 19, 2009
I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:
5/10/2009 to today is -9
5/22/2009 to today is 3
View 2 Replies
View Related
Apr 8, 2009
I am trying to get the results of the number of days between today and a future date. I am using ="cell containing futuredate"-today() and it gets me the correct number of days. The problem comes in when I have yet to populate the future dates. I am getting -39991 (numeric value between today and jan 01 01) and because I am also using conditional formatting this is even more of a problem. Is there a way get excel to display nothing if it is a negative number? or to give a specified resut if the number becomes negative such as Expired or something of that nature?
View 3 Replies
View Related
Nov 22, 2013
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
View 7 Replies
View Related
Apr 2, 2009
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
View 9 Replies
View Related
May 27, 2012
There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.
Countif Today()+90
View 5 Replies
View Related
Jul 7, 2013
How can i get the actual Payment due date from no. of days using macro. i. e.
Posting Date Dues Payment Date
------------ ------ ---------------
22.06.2013 21 days ???
View 9 Replies
View Related
Apr 1, 2014
Need to calculate the number of days in December between two dates 11/20/2013 and 1/20/2014, how many days are in december? a formula that can calculate this?
View 9 Replies
View Related
Feb 6, 2009
I need to have a cell with a date in it then the next cell needs a formula to caluclate how many days it has been since that date???? I'm a real novice with excel.
View 9 Replies
View Related
Sep 18, 2008
I have a worksheet that has a sent date and expected delivery date I need create a macro that will alert me if today's date is within 5 days of expected delivery date.
View 14 Replies
View Related
Mar 16, 2014
I am looking to have a dropdown list (1-30 days) to add the selected number of days to today's date. The number selected in cell B2 adds that number of days to today's date in C2.
View 3 Replies
View Related
Jul 8, 2014
If cell a1 equals todays date add cell b2s value to it and put the new date back into cell a1.
View 6 Replies
View Related
May 20, 2012
I need a function to work out what the date will be 45 WORKING days after today(), this function needs to exclude Saturdays, Sundays and any Public Holidays i.e. there could be either 10 or 12 weekend days added into the calculation depending on when today() is plus any additional Public Holidays.
I am using Excel 2003 although it will need to work in Excel 2010 shortly.
View 4 Replies
View Related
Jun 11, 2014
I have spent too many hours Googling and trial with mostly error in attempting this. I formatted the very first cell A1 for today's date =TODAY(); this is also dirrectly above the column with all the dates in it. I just want an entire row's contents to turn red if it is 15 days old or older. This =$A1<TODAY()-15 somewhat works, but it only turns the date cell red, not the whole row. It also makes blank cells turns red, which I would like to remain blank (another formula is needed I imagine).
View 3 Replies
View Related
Apr 25, 2014
I'm in Excel 2010, and the cell with the date I want to work from is H22.
I'm trying to get the difference of the (date+12 months)-TODAY() to appear in months and days.
Here's the latest thing I tried (that doesn't work):
=IF(DATEDIF(H22,TODAY(),"y")>=1,DATEDIF(H22,TODAY(),"y")&" yrs, "&DATEDIF(H22,TODAY(),"ym")&" mths,
"&DATEDIF(H22,TODAY(),"md")&" days",IF(DATEDIF(H22,TODAY(),"ym")>=1,DATEDIF(H22,TODAY(),"ym")&" mths, "&DATEDIF(H22,TODAY(),"md")&" days",DATEDIF(H22,TODAY(),"md")&" days"))
I should also probably note that the date in H22 is the result of another function.
=EDATE(G22,12)
View 5 Replies
View Related
Apr 19, 2009
The range B7:K7 contains columns of "dates" and "characters" like "A", "B" and "C" . Range D2 = Today's date. If Range C7 is blank then it should calculate Today's date minus Column B7 (i.e D2-B7) so on:
B7 = "01-Apr-2009", C7 = "02-Apr-2009", D=7 = Status as "(A)"
B7 = Submitted Date, C7 = Received Date, D7 = Status
Difference Between Today's Date and "B7" date is required if "C7" is Blank date. Otherwise it should search next group (E, F)
=IF(AND(ISBLANK(C7),NOT(ISBLANK(B7))),D2-B7,IF(AND(ISBLANK(F7),NOT(ISBLANK(E7))),D2-E7,IF(AND(ISBLANK(I7),NOT(ISBLANK(H7))),D2-H7,IF(AND(ISBLANK(L7),NOT(ISBLANK(K7))),D2-K7,"--")))))
-- Excel File is attached.
View 4 Replies
View Related
Jul 9, 2013
I have a spreadsheet and every row has an incident date. What I would like to do is calculate which relative month it is compared with today's date. I know how to show if it is in the current month, but what I want is something like the following:
Today's date is 9 July 13
Row 1 date = 9 June 13, hence calculation = -1
Row 2 date = 17 May 13, hence calculation = -2
Row 3 date = 29 Jan 13, hence calculation = -6
etc
Some sort of month to month comparison resulting in an integer.
View 2 Replies
View Related
Mar 14, 2014
I am making process TAT(Turn Around Time) which required following information. In Excel 2007.
1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays
2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays
Note : Any weekend (off days) dates listed in holidays should not effect the query.
View 9 Replies
View Related
Feb 2, 2014
I need cell (O4) to display days overdue or days remaining on an assigned task based on subtracting due date (M4) from todays date, but only perform days subtraction function if (M4) is not blank and only if task complete cell (N4) is less than 100.
Have the conditional blank cell figured out, but nesting another condition for the less than 100 complete cell. So in other words, I don't want cell (O4) to subtract days and display any error, irrelevant data if there is not any due date entered or the task is entered as complete...
View 3 Replies
View Related
Mar 22, 2014
How to create a spreadsheet with what I think will be a very simple formula?
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 7 or less days but more than 1, put a 2 in cell C2.
If date in B2 - date in A2 is 30 or less days but more than 7, put a 3 in cell C2.
If date in B2 - date in A2 is 90 or less days but more than 30, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
OR
Another, maybe simpler, way of saying it is:
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 2-7 days, put a 2 in cell C2.
If date in B2 - date in A2 is 8-30 days, put a 3 in cell C2.
If date in B2 - date in A2 is 31-90 days, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
View 9 Replies
View Related
May 13, 2008
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"
View 7 Replies
View Related
Jun 27, 2014
is it possible to display the week number of todays date (today()) from a physically entered start date (which would obviously be week one), the start date would be november 4th 2013.
View 3 Replies
View Related
Jul 29, 2014
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
View 2 Replies
View Related
Apr 28, 2013
Our company has been taken over by new mgt (Y co) on 1st Nov 2012 from old mgt (X co). Y co has the policy of providing employees with EOS benefits as mentioned below:
1st 5 yrs - 1 month salary per year
5-10 yrs - 1.5 month salary per year
+10 yrs - 2 months salary per year
But for deciding the slab, total period of service is considered. The below table provides the calculation of days as on 31st Dec 2012 based on different joining dates which I need to fix by way of formula.
Name
Hire date
Salary
Total service (days)
X co
Y Co
1st 5 yrs
5-10 yrs
+10 yrs
George
09-02-2005
1000
2883
2822
61
61
[Code] ........
View 4 Replies
View Related
Sep 4, 2008
I have 2 dates a Start Date and an End Date.
I need to calculate the number of days from Start to End over eight years with each of the eight years in its own column.
Start End Yr1 Yr2 Yr3
11/01/99 11/01/00 11/01/01
10/31/00 10/31/01 10/31/02
Col A Col B Col C Col D Col E
10/31/00 07/05/01 365 117 0
I thought a series of IF statements but I am open to an easy solution...
View 9 Replies
View Related
Jul 28, 2009
I have a start date formatted as dd/mm/yyyy in cell A5
I have an end date formatted as dd/mm/yyyy in cell E5
In cell F5 I would like the result of the number of days between E5-A5 (Excluding weekends)
In cell G5 I would like the total number of days in the range F5:F25
In cell H5 I would like the total number of working days from A5 to Today
I am using the following formula to get the result in F5 etc
=SUM(INT((WEEKDAY(A5-{2,3,4,5,6})+E5-A5)/7))
I have copied this down and in the blank cells I get #NUM!
In cell F? were there is no date entered in cell E? I get a minus number (which I can hide using conditional formatting), but the minus number obviously has an affect on the result in G5, as cell G5 gives me #NUM! instead of the result for the current numbers in row F
View 9 Replies
View Related
Dec 11, 2013
I'm looking for the formula to calculate the number of winter days between two dates.
Say, that I'm having:
- Winter season start date (say Dec 1st)
- Winter season end date (say, March 1st)
=> All the days which are between these two are considered winter days for any given year.
- Two different dates defining the beginning and the end of my PERIOD. The total length of the period may be more than one year.
HOW do I calculate total number of winter days for the PERIOD?
View 13 Replies
View Related
Mar 17, 2014
I have a list of months in column A and would like a formula in column B that calculates the number of calendar days for each month (i.e. Jan=31, Feb=28 etc.)
View 9 Replies
View Related
Jun 4, 2009
I'm new here. I've searched these forums in the past for help, but never had to post, i've always been able to find something by searching. However, this time I couldn't find anything that addressed my specific need so I figured it'd be worth a shot.
Alright, I have two sets of dates, and i'm trying to set up a formular that calculates the numbers of days from the first date range that overlap/fall within the second date range.
For example:
In A3 type "1/1/2006"
In B3 type "1/1/2007"
In C1 type "6/30/2005"
In C2 type "6/30/2006"
Now, in C3 i'd like to insert a forumla that tells me how many days in the date range of 1/1/2006-1/1/2007 fall in the date range of 6/30/2005-6/30/2006. Basically for this is should be half the year, however many days that is.
Is this possible with a formula?
View 10 Replies