Looking to calculate timecycle from open date to close date. Having trouble trying to figure out how to have the formula look at the close date cell and if it is blank go to the next cell in the row to find a close date and subtract the open date from the close date to get the total number of days in the timecycle. See attached example.
I'm trying to workout how to take a known initial date a repeating frequency and work out the next due date from today.
Example
Initial Date :- 1st of January 2014
Frequency :- every 5 weeks
Current Date :- 9th of March 2014
Next Due date should be :-12th of March 2014 (if I worked it out correctly from my paper calendar)
I want to use a cell formula to do this for different initial dates and varying frequency periods (the frequency will always be whole weeks i.e. 1,2,3,4,5,6,7,8,8,10)
I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
I have a table that looks like this (its basically a historical data of a stock exchange):
Date Index January 4, 2010
[Code]....
The List continues till the current Date.
I want to calculate Average Index Values of a Date of each month within a Date Range. Example: Calculate Average Index Values for 3rd of Each month from 1st Feb 2010 to 3rd Jan 2011. Formula should calculate Average of the Index Values for 3rd Feb 2010, 3rd March 2010, 3rd April 2010, 3rd May 2010, 3rd June 2010, 3rd July 2010, 3rd Aug 2010, 3rd Sept 2010, 3rd Oct 2010, 3rd Nov 2010, 3rd Dec 2010, 3rd Jan 2011.
Both the Date and the Date Range is variable. Also, the Index Value for selected Date of one or more month may not be available as that being a holiday. In that case, the formula needs to use the last available Index Value before that Date. e.g. If Index Value for 3rd Oct 2010 is not available, system will use the Index Value of 2nd Oct 2010.
i am trying to create a forumla in a column (D in my expamle below) to count the number of days between two dates. Knowing that col D will change everytime the @now date changes - but thats ok..
COL A COL B COL D ROW 1 Open Date Closed Date Count of days open ROW 2 4/1/07 BLANK CELL Formula result here ROW 3 4/1/07 9/5/07 Formula result here
if col b has a date then subrtract col a from b and display the # result, if col b is blank then subtract col a from location I store the @ now date - say Col ZZ Row 99? so no matter there is a count of number of days in every row in column D
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"
Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?
I have a start date for a contract in cell AM1. I need AN1 show a date six months from the start date in AM1. I am fine with that part.
However, I would like for AN1 to calculate not only a six-month date but also to auto-update to the next six month date from AM1 once the first six month date is about, let's say, one month past. What I am doing is calculating when a six-month inspection needs to be completed; these inspections are ongoing, so I need them to auto-update.
So let's say a contract was awarded today, 25 JAN 2010. That would be value in AM1.
I want AN1 to produce a date six months from 25 JAN 2010, which would be 25 JUL 2010 (yes, this way of calculating the six month date is fine). Then around, let's say, 25 AUG 2010, I want AN1 to auto-update to produce the next six month date, which would be 25 JAN 2011 (six months from 25 JUL). Obviously the function would need to relate to TODAY() in some way.
What is the formula to calculate a due date from a date in another cell? If the date is 06-12-06 and the due date is the end of the month six months later, 12-31-06, how do I do this?
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
I have a calendar form opened by a control button on an excel userform. Is there a way of closing the calendar form as soon as a date is selected, leaving the initial form open?
I have a sheet that users fill out and there is a macro on that sheet to copy the info to another workbook, save and close.
for some reason, the date, which originates from a cell with the value "=Today()", and when pasted in to the new book, it is pasted values.
the issue is, every so often, the date will say 09/26/10 and continue to do so for quite a few entries.
i have tried almost everything. I checked the dates on the computers, and all are fine. i even went through it step by step, and when the data pasted it, it was 09/26/10.
I have a table of data (total 142 rows). Column contains dates, in the format dd-mmm-yyyy.
I tried to filter using DATE FILTERS->EQUALS and in the custom filter window, I chose EQUALS then picked a date from the date picker icon. The date I picked was 5/4/2009 (this is May 4, 2009, formatted automaticall by excel as m/d/yyyy).
When I clicked OK, nothing showed up despite the fact that there are 6 occurences of May 4, 2009 (formatted as dd-mmm-yyyy in the data table)
So my questions are:
1. Is this due to the formatting?
2. Is there a way to change the date format supplied by the date picker?
I am now trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.
I need to create formulas that reference a single date and output date ranges. The objective is to have a person input a Monday date in any given month and receive a four weeks out worth of dates and ranges. For example: In a lone cell, the person inputs 10/13/08. Automatically, the sheet produces the next full week range: October 19 – October 25 in a single cell and also produces a cell for each date. Example: Sunday 19, Monday 20, Tuesday 21, etc…. It should look like:
and then repeat for three more weeks. I thought I had it figured out until the month changed. The dates continued in October instead of adding a month. This report will be ran weekly, so simply adding a +1MONTH to some cells will not benefit me as I’ll have to change the formula every week. I want the formula to compute the data without any manipulation over the next several years. The only change will be the Monday date.
I have data going in to a small table which has some empty rows as that data is not yet available... My problem is, I need to sort this table in date order but with the date nearest to today's date at the top...
The sort function puts oldest at the top or oldest at the bottom which is no good for what I need...
how to calculate the date for one year. If i have 24-Jun-08 (A1) i need to calculate 24-Jun-09. If i do =A1+365 it gives me an error (the little green thing in the corner of the box) is there a way to do this without the error showing up.
I am trying to write a macro to complete a report for me. I have everything working and tested but I have 1 issue. The report needs to take some data from yesterdays report.
Therefore I need a code which is able to open the file, I know how to do this with a constant file name but the issue arises because the file from yesterday is saved with the date.
Probably not possible but can you write a macro to load a file which has a file name which always starts with Act2July followed by the date
i.e. Act2July191104.xls
but next friday it will be called Act2July261104.xls
This file is created by the network.
So can the macro pick up the Act2July part of the file name and then select the file dependent on when it was saved, so that the latest update is always loaded.
I have a folder with several downloaded payroll files. I want to write a macro in my "excel payroll converter" file which will selects and opens the last file downloaded. (So I can copy and paste it into my payroll converter.)
I'm looking for a formula that will subtract a specific # of days from a future date, and then if the answer is a weekend, go to the next business day.
For example, I want to subtract 84 days from a deadline. Let's say the deadline is in cell A4, and is 1/3/15. I want to subtract 84 days from A4. This brings me to 10/11/14 which is a Saturday. I need the date produced to be the following Monday, 10/13/14.
Attached is the sheet I want to find the start date which shall be the end date (predecessor task end date) + 1 day in column c when I define predecessor in Column E which is the task number from Column A