Calculate End Date From Start Date & Number Of Weeks


Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?


View Complete Thread with Replies

Sponsored Links:

Related Forum Messages:
Calculate Date Difference In Weeks
On some Military computers the Add-ins were not installed, therefore the WEEKNUM function cannot be used.

The task is to calculate the time interval (in whole weeks) between two dates.
(Every start date is to be calculated as a whole week – same for the End date).

I tried but the most but came up with the incorrect formula in the attached workbook.

View Replies!   View Related
Add Cell Number To Date & Add Weeks
I want to add a numeric number eg: 4 to a date format eg: 15/08/2007 so that it calculates 4 WEEKS from 15/08/2007 and returns the CORRECT date in a date fomat itself. How do i do this through a VB code ?

View Replies!   View Related
WORKDAY Function To Calculate The Start Date
As everyone realizes that WORKDAY function can return a working date that exclude weekends and any dates identified as holidays. However, what if I want to return a working date excluding my designated holidays but including weekends?

For example,

Holidays are 1 Jun 2009, 2 Jun 2009 and 4 Jun 2009

Start Date: ???
Finish Date: 8 Jun 2009
Duration: 5 days

The Start Date should be 30 May 2009.

Seems like I am not able to use WORKDAY function to calculate the start date.

View Replies!   View Related
Calculate Number Of Days Between Two Date Within A Current Month Including End Date
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.

For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.


View Replies!   View Related
Calculate The Number Of Days From A Date Entered Into Cell A1 To Today's Date
I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:

5/10/2009 to today is -9

5/22/2009 to today is 3

View Replies!   View Related
Compute The FuTure Date When Start Date,Lead Date,Weekly Offs,Leaves And Holidays
First and foremost I would like to congragulate you on this wondeful piece of code in the below link...

The query was to get a future date excluding Fridays and Holidays...

http://www.excelforum.com/excel-work...rkingdays.html

I have a similar query and therefore I pasted this link...

I actually wanted to get a future date using a Dynamic two day off as my the offs keep on changing as well as incorporate Holidays and Leaves if any..

Now Holidays would be official Public Holidays and
Leaves would be taken by the employee..

The code needs to pick the Leaves + Holidays and different offs maybe even more than 2 offs...


View Replies!   View Related
Calculate What Months An Employee Worked By Start And End Date
I am working on a sheet that will allow a user to enter a start month (from a pre-defigned drop down list) and an end month (again from ddl). What I need to calculate is in what months the employee worked in so I can calculate their salary cost by quarter.

It can populate other cells in order to do the calculation if needed. So, for example if an employee started in May, and worked until December, I need to calculate that he worked 2 months in Q1, 3 months in Q2, 3 months in Q3, and 0 months in Q4. Our fiscal year is April to March.. ;-) I have thought of several options, but none of them have worked 100%.

View Replies!   View Related
Calculate Holidays Remaing Based On Start Date
I want to create a formula that will do the following Each worker is entitled to 21 days holiday per year this will run from 8 Jan 08 to 7 Jan 09. But if a worker starts say 15 Apr 08 he would be entitled to less than 21 days. I would just like to be able to put his start date in a cell and then automatically generate how many days holiday he would be entitled to from 15 Apr to 7 Jan.

View Replies!   View Related
How To Calculate Future Dates From Start Date On A Monthly Cycle
I'm trying to combine monthly calculations with "today" and with "workdays"

Example:

start date = 01/01/2009

today's date 09/16/2009

formula result = 10/01/2009 ; or if 10/01/2009 is a Sunday, result = 09/29/2009 (not 02/01/2009, 03/01/2009, etc)

=edate gives me a month but it doesn't skip weekends or calculate beyond today's date

View Replies!   View Related
Calculate Future Dates From Start Date With Varying Time Period/cycle
I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.

For example:

I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.

I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.

I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).

View Replies!   View Related
Is Date Past X Weeks From Current Date
How would I write an if statement that checks to see if the date entered is two weeks past?

View Replies!   View Related
Vbcodes To Select Start Date Then Begins Highlight Until End Date
i need VB to select the start date of booking and autohighlights the "blank booking slot cells" until the end date that is input in Excel. You can visualise this as a room booking system. The left most column is the dates and the first row represents the different rooms type. E.g. if one guest books the Twin Deluxe No. 123 room on 23 Oct 2006 until 25 Oct 2006. We wish the VB can essentially help us identify the start date then begins highlighting the three slots for 23, 24 and 25 Oct on the column for the Twin Deluxe Room 123.

View Replies!   View Related
Highlight-Select Start Date To End Date
We are doing a project on a booking system and wish to use VB codes to autohighlight the slots from the start date until the end date.

View Replies!   View Related
Find Start Date And End Date In Range
This is a sub that uses the Find method to find a series of dates and copy them to another worksheet. The following error comes up: Object variable or With block variable not set. I have tried using a set command etc. but other errors end up coming up.

Private Sub CommandButton7_Click()

On Error Goto errorHandler
Dim startDate As String
Dim stopDate As String
Dim startRow As Integer
Dim stopRow As Integer
startDate = InputBox("Enter the Start Date: (mm/dd/yy)")
If startDate = "" Then End
stopDate = InputBox("Enter the Stop Date: (mm/dd/yy)")
If stopDate = "" Then End
'startDate = Format(startDate, "mm/??/yy")
'stopDate = Format(stopDate, "mm/??/yy")
startRow = Me.Columns("A").Find(startDate, _
LookIn:=xlValues, lookat:=xlWhole).Row
stopRow = Me.Columns("A").Find(stopDate, _
LookIn:=xlValues, lookat:=xlWhole).Row
Me. Range("A" & startRow & ":A" & stopRow).Copy _
Destination:=Worksheets("Report").Range("A1")
End

errorHandler:
MsgBox "There has been an error: " & Error() & Chr(13) _
& "Ending Sub.......Please try again", 48

End Sub

View Replies!   View Related
Calculate The Quarter To Date Number
I was given the formula below to calculate the quarter to date number. The months from 1/1/05 thru 12/31/07 are in cells C3-AL3.

First - can anyone explain the formula so I may understand it and possibly modify it for other uses

Second - wherever the formula has 3:3 and I copy it to the next cell below it, I have to change the 4:4 to a 3:3 - any suggestions on how to do this easily.

By the way, the formulas are in column AO, staring on row 4.

=SUM(OFFSET(A3,1,MATCH(DATE(YEAR(Date!$C$6),INT((MONTH(Date!$C$6)+2)/3)*3-2,1),3:3,0)-1,1,MATCH(Date!$C$6,3:3,0)-MATCH(DATE(YEAR(Date!$C$6),INT((MONTH(Date!$C$6)+2)/3)*3-2,1),3:3,0)+1))


View Replies!   View Related
Calculate Number Of Months Between Two Given Date
Start date: 12/04/2004
End date: 12/04/2006
The formula should give the answer to 24 months

Example 2
Start date: 12/04/2004
End date: 13/04/2006
The formula should give the answer to 25 months

When I use function =(YEAR(A4)-YEAR(A3))*12+MONTH(A4)-MONTH(A3), it does not
show 25 months for "Example 2" as it is still within the same month "April"

View Replies!   View Related
Calculate Number Of Days From A Date Field
I need to have a cell with a date in it then the next cell needs a formula to caluclate how many days it has been since that date???? I'm a real novice with excel.

View Replies!   View Related
Calculate Number Of Hours Between Two Date/time Combinations
I am trying to find a way to calculate the number of hours between date/times found in separate rows. The attached data set will help to envision what I am talking about.

For each couple of rows, I need to find a way to calculate the number of hours elapsed from row 1 to row 2. In the first example, to calculate the number of hours between 12/2/2009 8:56:51 and 12/4/2009 6:35:27.

View Replies!   View Related
VB Calendar, If Date Not Within 12 Weeks, Then Msgpop Up
I can get the calendar control to come up and the value selected on the calendar to show up in a certain cell.

If a user selects a date that is not within a certain 12 week range, I want a message to appear ("date not within 12 week program"), and the user can't select the date.

I am storing nutrition data from a certain date the user chooses and it is a 12 week program from the start date. I want to retrieve info from those 12 weeks but do not want them to be able to select data outside the 12 weeks.

View Replies!   View Related
Calculate A 30-day Moving Average Based On The Last X Number Of Entries And Date
I have a worksheet that has all weekday dates in column 1 and values in column 2. I want to create a 30-day moving average based on the last (non-zero) value in the column 2.

Since every month has a different amount of days, I want it to search the date that has the last value (since I don't get a chance to update it daily) and go back thirsty days from that date and give an average of all the column 2 values skipping and values that are null or zero.

View Replies!   View Related
Autofill From Start Date To End Date
I have one column( date) which I wanna set date range from VBA macro. The problem is I wanna use Autofill to fill from the start date to the specific end date, but with Autofill func I cannot do this.

I attached a sample to explain my problem. Please take a look and give me a hint to do this.

View Replies!   View Related
Date Differences In Days, Weeks Or Months
I've been racking my brain on this one for awhile, and I feel like I'm going the right direction but...

I have a list of dates like:
11/30/2007
10/31/2007
9/30/2007
8/31/2007
7/31/2007
6/30/2007
5/31/2007

or maybe

11/30/2007
11/23/2007
11/16/2007
11/9/2007
11/2/2007
10/26/2007
10/19/2007
10/12/2007
10/5/2007
9/28/2007
9/21/2007
9/14/2007
9/7/2007
8/28/2007

...and I need to determine if the difference between them is daily, weekly, or monthly. There are 79 of these lists, on 79 different sheets so I can't visually peg them as daily, weekly, or monthly.

The way I have been looking at the problem is to calculate the number of months between the last & first dates and see if the resulting answer (+1) matches the number of actual dates, and so on...

View Replies!   View Related
Counting Weeks With Date Time Spans
I need to make formulas to count the number of weeks that each phase of a project takes, but I currently have the start and end dates of the phases. (See attachment)

View Replies!   View Related
Calculate The Number Of Days From Start To End
I have 2 dates a Start Date and an End Date.
I need to calculate the number of days from Start to End over eight years with each of the eight years in its own column.

Start End Yr1 Yr2 Yr3
11/01/99 11/01/00 11/01/01
10/31/00 10/31/01 10/31/02

Col A Col B Col C Col D Col E

10/31/00 07/05/01 365 117 0

I thought a series of IF statements but I am open to an easy solution...


View Replies!   View Related
If Date Cell Less Than Todays Date Calculate Difference In Days
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"

View Replies!   View Related
Calculate Date Difference & Use Current Date If Cell Empty
i am trying to create a forumla in a column (D in my expamle below) to count the number of days between two dates. Knowing that col D will change everytime the @now date changes - but thats ok..

COL A COL B COL D
ROW 1 Open Date Closed Date Count of days open
ROW 2 4/1/07 BLANK CELL Formula result here
ROW 3 4/1/07 9/5/07 Formula result here

if col b has a date then subrtract col a from b and display the # result, if col b is blank then subtract col a from location I store the @ now date - say Col ZZ Row 99? so no matter there is a count of number of days in every row in column D

View Replies!   View Related
Calculate Date Six Months From Cell Date
I have a start date for a contract in cell AM1. I need AN1 show a date six months from the start date in AM1. I am fine with that part.

However, I would like for AN1 to calculate not only a six-month date but also to auto-update to the next six month date from AM1 once the first six month date is about, let's say, one month past. What I am doing is calculating when a six-month inspection needs to be completed; these inspections are ongoing, so I need them to auto-update.

So let's say a contract was awarded today, 25 JAN 2010. That would be value in AM1.

I want AN1 to produce a date six months from 25 JAN 2010, which would be 25 JUL 2010 (yes, this way of calculating the six month date is fine). Then around, let's say, 25 AUG 2010, I want AN1 to auto-update to produce the next six month date, which would be 25 JAN 2011 (six months from 25 JUL). Obviously the function would need to relate to TODAY() in some way.


View Replies!   View Related
Start Date And End Date
I have the following code now that cbanks helped with before this question was locked and no Norie this exact question is not posted elsewhere....

View Replies!   View Related
Sum Between Start Date & End Date
I have a small business and I keep track of all my expenditure. It is not big enough to use any Accounting software yet so I am hoping to write some macros to help speed up my time doing this. I list all my expenditure on a tab called <Daily> in the format below

Date DescriptionTo £

05/10/2006Expenses Company 6.00
07/10/2006Travel costs x 658.00
03/10/2006Stationery y 2.00
04/10/2006Other Expenditure z 365.00

(i.e. 4 columns : date, description, to, £)

What I would like to do is be able to sum all these entries on a weekly basis in another tab I have already created. So for example, I would like to be able to tell the macro what range to look at (i.e. one week) then for it to look up the description and then take the sum of these totals and paste the value on a new tab.

View Replies!   View Related
Calculate A Due Date From A Date In Another Cell
What is the formula to calculate a due date from a date in another cell?
If the date is 06-12-06 and the due date is the end of the month six months later, 12-31-06, how do I do this?

View Replies!   View Related
Date Countdown: Results Of The Number Of Days Between Today And A Future Date
I am trying to get the results of the number of days between today and a future date. I am using ="cell containing futuredate"-today() and it gets me the correct number of days. The problem comes in when I have yet to populate the future dates. I am getting -39991 (numeric value between today and jan 01 01) and because I am also using conditional formatting this is even more of a problem. Is there a way get excel to display nothing if it is a negative number? or to give a specified resut if the number becomes negative such as Expired or something of that nature?

View Replies!   View Related
Last Ocurance Of The Last Date Used For Each Month And Then Use The Cell Number To Calculate The Column Totals For That Month
I have a spreadsheet that is now a yeare old with 5000 rows and is now going into the 2nd year

Column A is for date input and the same date can be repeated several tumes :-

1 Jan 09
1 Jan 09
1 Jan 09
1 Jan 09
2 Jan 09
2 Jan 09
3 Jan 09
3 Jan 09
3 Jan 09

Sometimes there are all 30 /31 days but normally not .

I need to find the last ocurance of the last date used for each month and then use the cell number to calculate the column totals for that month.

View Replies!   View Related
Extract Character From Date Format & Number Of Days Between Date
I have two questions regarding date format and hope you can provide input.

1) say 01/01/2010 displays as Jan-10 and i need a new column to state it as JAN. What function should i use to achieve it?

2) i need to state the difference between first day and last day of the month. What function should i use to achieve it?

View Replies!   View Related
Formula For Date Minus Date = Number Of Days
I was wondering if anyone knows how I could enter a date in one cell, then another date in a second cell and in a third cell have it have it so it minuses the first date from the second and calculates the difference outputted in number of days.

Example: 04/31/08 - 04/01/08 = 30 (days)

View Replies!   View Related
Formula Date Result Showing Number Not Date
I’m trying to resolve this issue and would appreciate some help.

Scenario
I have a tracking sheet that tracks development of work to be completed by individuals.
I have a due date column that shows when the work should be completed.
Once the work has been completed, the user enters his completion date.

I have a formula that provides an overdue warning (Completion date – today’s date) and some conditional formatting.

Problem
When I copy the formula through all the cells in the column I get a number (example 39504) and this changes everyday.

How can I eliminate this being shown as it throws out my average development day calculation?

View Replies!   View Related
Convert Number Representing Date To Real Date
I have an 8 character number that I am trying to segment and change into a date.

The current format is: YYYYMMDD, for example 20071003 (today's date)

I am would like to change it to read 10/03/2007 or another easily identifiable date format.

View Replies!   View Related
Week Number For Date Relative To Date Range
Is there a UDF that can determine the number of weeks for a date range specific that is not relative to the week number for the year but for the date range itself. i am aware of the weeknum function but this is for week number relative to the year. eg. date range 01/03/2008 - 31/05/2008 has approx 12 weeks and 14/05/2008 will be week number 10 for the range.

View Replies!   View Related
Number Of Days To Add To Date Based On Weekday Of Date
I need to create a formula that states a delivery date when the order date is entered in an adjacent column. Items ordered on Monday, Tuesday and Wednesday will be delivered the Friday of the following week, eg. ordered 23rd April 2008, delivered on the 2nd of May 2008. Items ordered on Thursday or Friday will be delivered on a Friday 2 weeks later, eg. ordered on the 24th April, delivered on the 9th of May 2008

View Replies!   View Related
Getting The Date For The Start Of The Week
I have this column with a value like 04/06/2008. I will want another of the column to auto generate the date for the start of the week like 02/06/2008 which is a Monday.


View Replies!   View Related
Start End Date Calculation
Need a formula that will generate the ending date of task, adding therefore if needed the number of weekend(s) in between the start and end date to the End date.

Let us say: task is starting in 2008/11/11 the duration of the task is 7 days. So, we should get an End Date= 2008/11/19.

2008 11/11 11/12 11/13 11/14 11/15 11/16 11/17 11/18 11/19
Tue Wed Thu Fri Sat Sun Mon Tue Wed

View Replies!   View Related
Start And END Date -- Status
1. If I enter a date in B3, then D3 will be S, and if I enter date in C3, D3 will be left blank while E3 result is D (Done). To have a clear view, I have attached the excel sheet.

View Replies!   View Related
Networkdays: Start Date & End_date..?
I use without problem the function =NETWORKDAYS(start_date;End_date;[holidays]) that calculate the distance between two dates overlooking Saturdays, Sundays and, if specified, other holiday days.

But is there any general kind of this function that allows the calculus for the “long work week” ( i.e considering Saturday as working day )? Or and More: If I would consider Fridays as holiday days?

View Replies!   View Related
Business Week Start Date
I am looking for a function or formula that will return the date of the first Monday in any given month and year.

View Replies!   View Related
Ranking Employees By Start Date
I am trying to rank employees by seniority date. Some employees share the same seniority date. They should have the same rank. I took a formula from another thread =RANK(C2,C$2:C$8) and applied it to my worksheet and it worked out great except that the ranking skips the next number (in this case 4)...........

View Replies!   View Related
Add Start/End Time/Date Into 1 Cell
When doing weekly scheduled in excell, is there a way to record a start time and an end time in the same cell and then have excell total hours scheduled from data entered into that one cell.

View Replies!   View Related
Date Serial Number To Actual Date
I have a macro which copies the values from one cell to another. But, while copying the macro changes the date format to a serial number and this doesnot happen all the times. Below is the code I have. I want the macro to automatically convert the date from from serial number to dd/mm/yyyy. I tried quite a different ways, but none of them seems to work. Below is the macro I run to copy the contents from one cell to another.

Sub History()
'
' Macro: Backup results from prior rounds. Please run this macro after selecting the cell where the backup is to be done.
'
cur_row = ActiveCell.Row
If ActiveCell.Offset(-(cur_row - 10), 0).Value <> "History" Then
MsgBox ("Check whether the active cell is the designated history cell. History operation failed")
Exit Sub
Else
ActiveCell.FormulaR1C1 = ActiveCell.FormulaR1C1 & ActiveCell.Offset(0, -5).Value & " "..........................

View Replies!   View Related
NETWORKDAYS() Function Will Return A Value Of 1 If Start And End Date Are Same
Anyone know why the NETWORKDAYS() function will return a value of 1 if the start and end date are the same? Does the function always assume that the start_date is at 12:00AM and the end_date is at 11:59PM, because it seems to also show that there are 3 days between 11/04/08 and 11/06/08.

View Replies!   View Related
Return Months Between Start Date & End Dates
I have been trying to search for either a function or VBA that will perform the following:

If I enter I want all months >=1/1/07 and <=3/31/07 it would tell me that the months in between are January, February and March and so on with all dates.

View Replies!   View Related
Weekly Chart With Ability To Change Start Date
I have a simple bike log that lists out each day of the month in rows with a summary row between months. Like this...

January Summary
Jan 1
Jan 2
Jan 3
....
Jan 31
February Summary
Feb 1
Feb 2
Feb 3
....
Feb 28

and so on. Each column has a data field where I enter in miles and distance and so on. I frequently add rows if I do two rides in a day so two rows may start with "January 23rd". I would like to have a chart that shows me my weekly ride summary. But I have some issues:
1. With the field summary I don't know the best way to do a chart that doesn't include the summary (the summary data would throw the chart way off)
2. If I have multiple rides in a day I don't know how to make the week include those days
3. I may want the week to start on Monday and not Sunday. Is it possible to have the user choose and have the chart change automatically?

View Replies!   View Related
Disable Macro After Saving With The Week Start Date
I am trying to code a macro call where in once the file is saved with the current week start date all the other macro's should be disabled. Since am having lot of data and report sheets which needs to be added and deleted in the run. It causes me problem when I try to open it again to view the results. For example I have a sheet named apple and another one applereport. I have made my code to delete apple since it is a data sheet. I want apple report to have all the other macros disabled once its been renamed to week start date for now it is 16 Mon 2007.

View Replies!   View Related
Copyright © 2005-08 www.BigResource.com, All rights reserved