I have a spreadsheet that keeps track of incoming and outgoing orders. I am wondering if there is a formula that I could use to calculate how many days each order is in house. Say, if it comes in on 3/10 and goes out on 3/13. It would have to disclude the weekends. So if an order came in on friday it wouldn't count saturday and sunday in its totaling. I would also like to figure the average time an order spends in house form this formula.
I want to take a date (ex. May 25, 08 is in cell A2) and calculate 30 days (A2+30)June 24, 08(A6) and what i am trying to due is calculate if it is past due.
I used the if command but it does not seem to be calcualting the date plus thirty, it is only taking the date that is listed. (ex. instead of calculating =IF("A2+30"
I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.
There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.
I'm basically looking for a forumla that will count each employees total scheduled work days for the month inserted and then depening upon the day it is will show how many days the employee has left to work for the month.
I have a spreadsheet in 2007. Days across the top for an entire year. So 365 columns. I need a macro to extract the 3 previous days , today's column, and the 3 next days and load to a different worksheet.
HTML worksheet A: 1/1/09, 1/2/09..... 10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09 .... 12/31/09 10 11 ... 14 15 17 12 22 ... 28 a g ... g c d d a ... a
the macro would create a worksheet B(if run on 10/19/09): 10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09 14 15 17 12 22 g c d d a
I need a formula to count how many days hours & mins between 2 dates but included in the formula need to ensure it only counts business days.
Column A 02/09/2011 13:00
Column AO 02/09/2011 13:02
I need in Column AP to show 0 00:02
The formula I have tried using is - =IF(AO3="","",AO3-A3) which doesnt work as instead of showing 0 00:02 it shows 1 00:02. I dont want it to count as 1 day just 2 mins.
Once that has been worked out I need to include WORKDAYS formula to only count working days. I have created the list on 'Controls' Tab Column A10:A47.
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
the spreadsheet i've set up have two days in it, and i need to work out the number of days between the dates.
(Column H) Date Work was requested (Column S) Date Work was completed
Now i thought i could use
=DAYS360(H13,S13,TRUE) This does return the number of days between the dates, but if theres no completed date yet (alot of jobs take weeks somethings months to complete) it returns a value of -38541 for example.
In A column the date something is received will be entered.
In B column there is a drop down list that has "insured" "Fee" "Aged Debt" "Other".
In C column I am trying to get another date to populate dependant on what is picked from column B, so if Insured is picked then 1 working day needs to be added to the date in column A and populate in column C. If any of the other 3 options are selected 5 working days needs to be added to the date in column A and populated in column C.
I have been using this formula: =IF(B2="","",IF(B2="Insured",A2+1,A2+5)) however this is not working days and I am stuck how to get to add working days
I have a column with people(A) and their date of birth(C). I'm looking to find out the number of days when their next birthday is. I searched through here and couldn't find anything. Is there a formula I can use that would calculate this, year after year after year??
I am trying to find a formula that looks up by SS#and a date that is within two days of each other. Example file is attached but I have put the two table below just in case. The file explains it better.
I'm setting up a shift roster and need to determine whether a given time is between the start time and end time of a shift where the shift runs across 2 calendar days
I just started coding excel literally this week and I'm having trouble getting something to work. >.< I'm trying to look up a Name, if the date falls between Check-In Date and Check-Out Date.
Sheet 2: This is where raw data is organized daily
Date: August 1/2012 Room, Name 10 11 12 13 ... 50
What I'm trying to do is output the "Name" next to the "Room" if that person is staying at that part particular day.
I tried accomplishing this using nested VLOOKUP and if statements, however, it only works for the first Room it finds. If room 10 is used on a different day, I get a #value! error.
I have a few thousand rows of this. The X's could be placed in any column. I need to go through this data and determine the maximum days between X's for each row. I can't think of how to do something like this with either an equation or with VBA.
I can't get it to line up in the table above. But basically, there could be an X in Sunday and on Wednesday in one row. The next, could be every day of the week, the next could be any other combination. There could be 7 X's, 1 X, 3 X's, whatever.
i have a slight problem with the days360 formula. Normally it works but today it keeps returning #VALUE! error. I've tried fomatting the columns to dates and also have done the text to columns but it still doesn't work.
I copied and pasted the data as values from MS Access, perhaps this is causing the problem. It works if i type the data into Excel but not when i copy and paste the data from Access.
Using VBA, I would like to compare the date found in Cell(datRow, colIndex) of the Recap workBOOK to the date found in Cell(varRow, 3) of the Deduction workBOOK.
I loop through several Recap workbooks, one for each month. The problem I am encountering is this: If the date(s) found in the Recap workbook are before the date(one date) found in the Deduction workbook, the procedure will add the value of data below it to a running variable total.
However, what I am Needing, is for the value only to be added to the total IF the DAY of the date found in the Recap workbook (not the entire date) falls before the DAY of the date found in the Deduction workbook.
I know this is lengthy, but I have researched this for hours and am finding little to help me. Is there a function used in VBA to compare only the day of a date? And can I use a conditional IF statement such that execution happens when Cells(varRow, 3).Value > Cells(datRow, colIndex).Value even though the cells reside in different workbooks (both are open during processing)?
What I would like to do is insert a formula into column E that would calculate the number of days from when the count is at 50 to when the next count is i.e. for part 6689841 the time between when the count was 50 and when it was at 20, so the difference between 21/01/2008 and 08/08/2008 in the above example. It does not matter what the count number is (it could be any number except 50), I'm only concerned with every time the count is at 50 how long it is until the next count and to show the result in days.
I have a spreadsheet with a list in column A, and starting from column D in row 1 are daily dates e.g. 01/10/06, 02/10/06, 03/10/06. On a daily basis an x is added manually to the spreadsheet where the list criteria matches the specific date e.g
A B C D E F 1 01/10/06 02/10/06 03/10/06 2 M123 x x 3 M456 x x 4 M789 x x
What i would like to do in column C is to measure how many x's are in the last 10 days for each row. I have used formulas in the past to do something similar but I can't find them. Sorry I can't upload a sample but firewall won't allow.
i need to have a macro to add 7 days in a date and then copy it back to the same cell, i write a code as below that adds 7 month and also not able to copy it back.
Sub RollPlan() Dim dc1 As Date, dc2 As Date Sheets("sheet1").Select dc1 = Range("c1") dc2 = dc1 + 1 Cells("c1").Value = dc2 End Sub
I have been using: =DATEDIF(A1,B1,"md") & " days" to calculate the difference, in days, between two dates in a speadsheet, however, the number of formulae in the spreadsheet now is cumbersome so I'm trying to put it together in VB.
The formula determine what was been completed on the previous work day. If it fell on a weekend or a holiday specified in another table, it would consider it the following weekday's work. However, the needs of management have changed and they would now like to see anything completed on a weekend or holiday push back to the previous weekday and I'm not exactly sure how to modify this formula to do that.
As an example, work was completed over Good Friday. Yesterday (Monday) when we ran the report, none of those showed up in our list of completed items until today (Tuesday). They would have liked those numbers to be included on Monday's report to get an accurate picture of work that was completed.
I have attached some sample data. Everything completed on the 18th, 19th is counted as 1 day behind but we would like 18th and 19th to be shown as 2 days behind, just like April 17. That way, if we ran the report today and set the filter to 1 (for column C), those items would not show up, but they would have shown up on yesterday's report.
So, it is for a hotel, I need to know to know between a Check-in and a check-out date, each day (monday, saturday) there is. In depending it is for one night or 12.. I will try to be clear: Depending on the channel of booking and the day of week we have a % of commission different. so I want to put the price in one cell and it is calculate for each date in order at the end I have the right net profit (because the right commission has been applied). Of course to complicate the commissions do not apply in the same order depending the channel and there are fixed costs which are count one time or repeat by the amount of nights. For the these things what i did seems work.
After, my boss would like to link the dates with another excel file which say for each date which "level of price" (price point) is applied and function of this Price Point we have the price applied per room type and offer
But for now, I didn't find anything what can say to me between 2 dates what dates are between...