The formula determine what was been completed on the previous work day. If it fell on a weekend or a holiday specified in another table, it would consider it the following weekday's work. However, the needs of management have changed and they would now like to see anything completed on a weekend or holiday push back to the previous weekday and I'm not exactly sure how to modify this formula to do that.
As an example, work was completed over Good Friday. Yesterday (Monday) when we ran the report, none of those showed up in our list of completed items until today (Tuesday). They would have liked those numbers to be included on Monday's report to get an accurate picture of work that was completed.
I have attached some sample data. Everything completed on the 18th, 19th is counted as 1 day behind but we would like 18th and 19th to be shown as 2 days behind, just like April 17. That way, if we ran the report today and set the filter to 1 (for column C), those items would not show up, but they would have shown up on yesterday's report.
I am trying to put a time sheet together that will place the number 8 in a cell when the work "sick" or vacation is in another cell.
For example, if I am out sick on monday, I would like to put "sick" in the cell next to monday and have the number 8 be placed in another place. Then If I am out "sick for three days I would like all of those "sick" days to add up to 24.
I am using the following formula to calculate years months and days in Excell 2007 =DATEDIF(C7,D7,"y") & " yrs, " & DATEDIF(C7,D7,"ym") & " mths, " & DATEDIF(C7,D7,"md") & " days"
I have two date columns, a start date and end date. Another columns tells me the number of days between these two columns. It may return 45 days which actually straddle 3 different months.
My aim is to identify between this date range how many days in Apr 14. Then in the next column howmany days in May 14 etc
So on the spreadsheet Id have 12 columns for each month of the year. in Apr 14 for each row between the given date range I want it to tell me how many days are actually in April. Id then copy that formula into the May 14 column.
Formula which can calculate how many days in a month and create a column for each day. Columns for day 28, 29, 30 or 31 also need the formulas in columns 1 to 27 copied over automatically. [sheet name "LARSheet1 to 1" ]
I'm trying to build "Leave, Attendance Management" system using Excel. I am about 40% there so far.
The basic structure of the workbook is as follows:
12x main monthly "Leave Attendance Record" worksheets (i.emonths April 2012 through to March 2013). [I will refer to these sheets asLARSheet1 to LARSheet12 ]. 1 x worksheet which holds "data validation" list andvlook up info. ["FormulaListSheet"] 1 x worksheet acting as a database of staff details andpay numbers. ["StaffdBaseSheet"] 1 x summary page which shows staff reaming leaveallocation. ["SummaryLeaveSheet"]
What I'm having problems with at the moment is as follows:
A formula or a macro which works out how many days are present in a given month [starting date of month located in CELL B10].
Days 1-27 will be already set up on the sheet. Based upon the monthly value I would like a solution which can calculate how many days are in a month and create a column for days 28, 29, 30 or 31 (depending on the month).
I would like it to work like this:
When the user opens a new worksheet, they first entre the month start date in CELL B10. Hopefully this will trigger columns E13:AH22 to update with the relevant week day & date.
I also need the formulas and formatting in cells AH13:AH100 (column for day 27) to copied over automatically.
I am trying to calculate the number of days since an employee worked. Column A has the date and columns B,C, and D show the name of the 3 employees who worked that day. Each row shows the next day in column A with the three employees who worked that day in columns B,C, and D. I need the format of the excel sheet to remain the same. I'm looking for a formula that will calculate the number of days since each employee has worked...there are 10 different employees and only 3 work each day.
I'm trying to calculate the number of days between dates in column A and B. I've looked at the examples in this site and thought I used the formula correctly, but the cell returns an error message when I type: =DATEDIF(A1,B1,"D")
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
I have a few thousand rows of this. The X's could be placed in any column. I need to go through this data and determine the maximum days between X's for each row. I can't think of how to do something like this with either an equation or with VBA.
I can't get it to line up in the table above. But basically, there could be an X in Sunday and on Wednesday in one row. The next, could be every day of the week, the next could be any other combination. There could be 7 X's, 1 X, 3 X's, whatever.
I’ve tried formulas for this but nothing is working, and was wondering if there was some vba that would do the job
Please find attached a sample sheet of where I’m up to.
I’m trying to calculate when someone goes sick to see whether they are entitled to company sick pay (CSP) Statutory sick pay (SSP) and most people will have waiting days (W D) before qualifying for CSP.
A6:A735 have set dates for two years D6:D735 have the sick days an employee has taken B6:B735 Matches the sick date to the date in column A
G2 has how many days entitlement for CSP H2 has how many waiting days (W D) before CSP can start
In Column C i need CSP, SSP, or W D next to the number 1
And if someone only has 1 day sick they would not qualify for any of the above and I just need “S” in column C.
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
I want to calculate the TAT between multiple date: For example: I have a request I received on 1/2/2014 and I sent to Abhi on 1/2/2014(Same day) and I got a reply on 1/3/2014 from Abhi. I forwarded the same request on 1/3/2014 to Prasad and got a reply on 1/5/2014. And I closed the request on 1/5/2014. How do I calculate TAT on this ? I want the Tat to be shown as 3 days because I just took three days on the request to complete that is 1/2/2014, 1/3/2014 and 1/5/2014..
I need to calculate the number of days between a string of dates in Column A. There will be blank cells in between the dates and I need to ignore those blank cells. I'm trying to use this formula: =DATEDIF(A13,A15,"d") but it returns an error with a blank cell in the string.
In the attached workbook, I have subtotaled a list of parts. I want to add a formula beside the subtotals, under Column C, "Days BO", that subtracts earliest date in column R from the latest date in column R, for each part number.
I have added a simple formula to the attached example that does what I want, but the full sheet will be thousands of lines weekly, with varying part numbers, and different counts. I don't know how to take the count function into account so I can copy a single formula all the way down the sheet.
Our company has been taken over by new mgt (Y co) on 1st Nov 2012 from old mgt (X co). Y co has the policy of providing employees with EOS benefits as mentioned below:
1st 5 yrs - 1 month salary per year 5-10 yrs - 1.5 month salary per year +10 yrs - 2 months salary per year
But for deciding the slab, total period of service is considered. The below table provides the calculation of days as on 31st Dec 2012 based on different joining dates which I need to fix by way of formula.
Name Hire date Salary Total service (days) X co Y Co 1st 5 yrs 5-10 yrs +10 yrs
I have just built a spreadsheet to calculate training hours amongst other things. I have used the function NETWORKDAYS which calculates the number of working days between two dates. This works fine on my laptop which has the analysis tools pack installed. Unfortunately my work place IS policy wont allow the analysis pack to be installed so need to find away around this. Does anyone know a formula that will perform the same function as the NETWORKDAYS. THis is crucial to the accurate calculation of training hours.
I have 2 dates a Start Date and an End Date. I need to calculate the number of days from Start to End over eight years with each of the eight years in its own column.
I am trying to calculate the duration between two times on different days.
For example - I want to know the number of days/hours/minutes/seconds between 25th Feb 2009 20:00 & 27th Feb 2009 22:00.
I am sure that the key is how I enter the data into the cells and how those cells are formatted, I just cannot get Excel to see that the times are on different days. At the moment my data is in a raw format with times in one column and dates in another.
I have a start date formatted as dd/mm/yyyy in cell A5 I have an end date formatted as dd/mm/yyyy in cell E5
In cell F5 I would like the result of the number of days between E5-A5 (Excluding weekends) In cell G5 I would like the total number of days in the range F5:F25 In cell H5 I would like the total number of working days from A5 to Today
I am using the following formula to get the result in F5 etc =SUM(INT((WEEKDAY(A5-{2,3,4,5,6})+E5-A5)/7)) I have copied this down and in the blank cells I get #NUM!
In cell F? were there is no date entered in cell E? I get a minus number (which I can hide using conditional formatting), but the minus number obviously has an affect on the result in G5, as cell G5 gives me #NUM! instead of the result for the current numbers in row F
i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?
I need to calculate on a spreadsheet the number of days between a specific date and the date the spread sheet is opened. I need to know the number of days a merchandise has been stored.