Rolling 7 Days, Extract The 3 Previous Days

Oct 19, 2009

I have a spreadsheet in 2007. Days across the top for an entire year. So 365 columns. I need a macro to extract the 3 previous days , today's column, and the 3 next days and load to a different worksheet.

HTML
worksheet A:
1/1/09, 1/2/09..... 10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09 .... 12/31/09
10 11 ... 14 15 17 12 22 ... 28
a g ... g c d d a ... a

the macro would create a worksheet B(if run on 10/19/09):
10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09
14 15 17 12 22
g c d d a

View 6 Replies


ADVERTISEMENT

Find Out How Many Ticks Were On Green Days, Amber Days And Red Days

Dec 19, 2008

I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.

View 4 Replies View Related

Formula To Look At Previous And Following Days To See If They Are Populated

May 30, 2014

I have a sheet that shows employee absences, I require a formula that will look to see if a friday and a monday are populated and auto-populate the saturday and sunday to match the run, if the only the monday is populated then the saturday and sunday need to stay blank, if only the friday is populated then I also need the saturday and sunday to stay blank.

I have attached a sheet with the current display and the desired outcome.

fill test.xlsx‎

View 14 Replies View Related

Calculation That Uses Number Of Days Of Previous Month?

Jul 1, 2014

I have to do a calculation that uses the number of days of the previous month. Thought this would work but it doesn't.

[Code].....

View 12 Replies View Related

Macro: Return Previous Working Days Date

Dec 1, 2006

how do i get the previous days working date in VBA, how can i get VBA to determine wether we are in the week, and how will i get it to know its a monday to retrieve fridays date?

View 3 Replies View Related

How To Subtract / Add Days / Months Using Borrow / Carry Forward To Previous Cells

Dec 8, 2013

I have subtracted two dates from B2 & B1 using DATEDIF() Function and the results are available in (B5) Year, (C5) Month and (D5) Days respectively. Now the problem is how to Subtract, Add days & Months using borrow, Carry forward to the previous cells (I need formula, function for the above). I have to take 30 days from month ie in C5 if the days (D5

View 1 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Counting The Days Worked And Days Remaining On A Schedule Automatically

Sep 1, 2007

I'm basically looking for a forumla that will count each employees total scheduled work days for the month inserted and then depening upon the day it is will show how many days the employee has left to work for the month.

View 9 Replies View Related

Converting Days To Years,months,days

Jan 23, 2009

How can I convert the number of days for example 366 days to years, months, days 366=1year, 0 months, 1 day

View 3 Replies View Related

Change Days Added To Working Days

Jul 31, 2014

I've got the below so far, but where it says V2>=(Q2+5) , I would like it to add 5 working days instead, is this possible?

Code:

=IF(AND(T2="Awaiting",V2>=(Q2+5)),"Overdue","Raised within 5 Days")

It would also be great if there is a way to say that if T2="Not Required, then put "Not Required" in W2 (where the IF statement is)

View 4 Replies View Related

Count Days HH:MM Using Network Days

Sep 28, 2011

I need a formula to count how many days hours & mins between 2 dates but included in the formula need to ensure it only counts business days.

Column A 02/09/2011 13:00

Column AO 02/09/2011 13:02

I need in Column AP to show 0 00:02

The formula I have tried using is - =IF(AO3="","",AO3-A3) which doesnt work as instead of showing 0 00:02 it shows 1 00:02. I dont want it to count as 1 day just 2 mins.

Once that has been worked out I need to include WORKDAYS formula to only count working days. I have created the list on 'Controls' Tab Column A10:A47.

merge these together to create the one formula?

View 6 Replies View Related

Calculate End Date Using Start Date And Number Of Days Excluding Specific Days

Nov 22, 2013

I want to calculate the end date of my German courses. This is how it works:

A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.

Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.

Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.

The workday function on excel cannot do this and I do not have any programming skills to work with VBA.

Legend:
*LU = lesson units; 1 LU is 45 minutes

Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14

[Code] ...........

View 7 Replies View Related

Days Between Two Dates Separated Into Days Per Month For Multiple Dates - Excel

Feb 13, 2013

I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.

The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.

Input Data
Result
Start Date

[Code]....

View 3 Replies View Related

Formula For Last 7 Days, 30 Days

Dec 8, 2008

I have two rows of data, Date and data.

I want to continously figure avg for last 7 days, 30 days.

View 10 Replies View Related

Extract Character From Date Format & Number Of Days Between Date

Jan 17, 2010

I have two questions regarding date format and hope you can provide input.

1) say 01/01/2010 displays as Jan-10 and i need a new column to state it as JAN. What function should i use to achieve it?

2) i need to state the difference between first day and last day of the month. What function should i use to achieve it?

View 2 Replies View Related

DAYS 360

Aug 26, 2007

the spreadsheet i've set up have two days in it, and i need to work out the number of days between the dates.

(Column H)
Date Work was requested
(Column S)
Date Work was completed

Now i thought i could use

=DAYS360(H13,S13,TRUE)
This does return the number of days between the dates, but if theres no completed date yet (alot of jobs take weeks somethings months to complete) it returns a value of -38541 for example.

View 9 Replies View Related

How To Get To Add Working Days

Jun 6, 2014

In A column the date something is received will be entered.

In B column there is a drop down list that has "insured" "Fee" "Aged Debt" "Other".

In C column I am trying to get another date to populate dependant on what is picked from column B, so if Insured is picked then 1 working day needs to be added to the date in column A and populate in column C. If any of the other 3 options are selected 5 working days needs to be added to the date in column A and populated in column C.

I have been using this formula: =IF(B2="","",IF(B2="Insured",A2+1,A2+5)) however this is not working days and I am stuck how to get to add working days

View 4 Replies View Related

Birthday Is X Days Away?

Jan 7, 2009

I have a column with people(A) and their date of birth(C). I'm looking to find out the number of days when their next birthday is. I searched through here and couldn't find anything. Is there a formula I can use that would calculate this, year after year after year??

View 4 Replies View Related

Looks Up By SS#and A Date That Is Within Two Days Of Each Other

Jan 24, 2009

I am trying to find a formula that looks up by SS#and a date that is within two days of each other. Example file is attached but I have put the two table below just in case. The file explains it better.

Table A

DateNameSS#Status
7/1/2008John555OP
7/2/2008John555OP
8/5/2009John555IP
8/6/2009John555IP
9/5/2009Bob777OP
9/6/2009Bob777IP

Table B

DateNameSS#Status
7/2/2009John555Formula Here
7/3/2008John555Formula Here
8/7/2009Bob777Formula Here
9/7/2009Bob777Formula Here

View 8 Replies View Related

Time Between Days

May 11, 2006

I'm setting up a shift roster and need to determine whether a given time is
between the start time and end time of a shift where the shift runs across 2
calendar days

eg start 23:00 finish 06:00

View 9 Replies View Related

Lookup Name If Between Two Days?

Aug 7, 2012

I just started coding excel literally this week and I'm having trouble getting something to work. >.< I'm trying to look up a Name, if the date falls between Check-In Date and Check-Out Date.

Below is my basic layout:

Sheet 1: This is where raw data is inputted

Room, Name, Check-In Date, Check-Out Date
10......Clark.....Aug 1.............Aug 10
10......James...Aug 15............Aug 16

Sheet 2: This is where raw data is organized daily

Date: August 1/2012
Room, Name
10
11
12
13
...
50

What I'm trying to do is output the "Name" next to the "Room" if that person is staying at that part particular day.

I tried accomplishing this using nested VLOOKUP and if statements, however, it only works for the first Room it finds. If room 10 is used on a different day, I get a #value! error.

=VLOOKUP(10,'Room Reservation'!A4:H1002,IF(AND(VLOOKUP(10,'Room Reservation'!A4:H1002,7,FALSE)A2),2,""),FALSE)

Basically, it's searching for "10" if "Check-In"

View 9 Replies View Related

Calculate Days Between X

Nov 12, 2013

I have a data set that looks like the following.

Description S M T W T F S
Item 1 X X
Item 2 X X

I have a few thousand rows of this. The X's could be placed in any column. I need to go through this data and determine the maximum days between X's for each row. I can't think of how to do something like this with either an equation or with VBA.

I can't get it to line up in the table above. But basically, there could be an X in Sunday and on Wednesday in one row. The next, could be every day of the week, the next could be any other combination. There could be 7 X's, 1 X, 3 X's, whatever.

View 1 Replies View Related

Calcualting Days

Mar 13, 2007

I have a spreadsheet that keeps track of incoming and outgoing orders. I am wondering if there is a formula that I could use to calculate how many days each order is in house. Say, if it comes in on 3/10 and goes out on 3/13. It would have to disclude the weekends. So if an order came in on friday it wouldn't count saturday and sunday in its totaling. I would also like to figure the average time an order spends in house form this formula.

View 9 Replies View Related

Days 360 Formula

Jun 4, 2007

i have a slight problem with the days360 formula. Normally it works but today it keeps returning #VALUE! error. I've tried fomatting the columns to dates and also have done the text to columns but it still doesn't work.

I copied and pasted the data as values from MS Access, perhaps this is causing the problem. It works if i type the data into Excel but not when i copy and paste the data from Access.

View 9 Replies View Related

Comparing Days In VBA

Jun 29, 2007

Using VBA, I would like to compare the date found in Cell(datRow, colIndex) of the Recap workBOOK to the date found in Cell(varRow, 3) of the Deduction workBOOK.

I loop through several Recap workbooks, one for each month. The problem I am encountering is this: If the date(s) found in the Recap workbook are before the date(one date) found in the Deduction workbook, the procedure will add the value of data below it to a running variable total.

However, what I am Needing, is for the value only to be added to the total IF the DAY of the date found in the Recap workbook (not the entire date) falls before the DAY of the date found in the Deduction workbook.

I know this is lengthy, but I have researched this for hours and am finding little to help me. Is there a function used in VBA to compare only the day of a date? And can I use a conditional IF statement such that execution happens when Cells(varRow, 3).Value > Cells(datRow, colIndex).Value even though the cells reside in different workbooks (both are open during processing)?

View 9 Replies View Related

Calculating Days ..

Sep 15, 2008

What I would like to do is insert a formula into column E that would calculate the number of days from when the count is at 50 to when the next count is i.e. for part 6689841 the time between when the count was 50 and when it was at 20, so the difference between 21/01/2008 and 08/08/2008 in the above example. It does not matter what the count number is (it could be any number except 50), I'm only concerned with every time the count is at 50 how long it is until the next count and to show the result in days.

View 9 Replies View Related

How Do You Add Days To A Date

Oct 27, 2008


If Not Intersect(Target, Range("C6") + 4) Is Nothing Then

View 9 Replies View Related

Count Last 10 Days

Sep 22, 2006

I have a spreadsheet with a list in column A, and starting from column D in row 1 are daily dates e.g. 01/10/06, 02/10/06, 03/10/06. On a daily basis an x is added manually to the spreadsheet where the list criteria matches the specific date e.g

A B C D E F
1 01/10/06 02/10/06 03/10/06
2 M123 x x
3 M456 x x
4 M789 x x

What i would like to do in column C is to measure how many x's are in the last 10 days for each row. I have used formulas in the past to do something similar but I can't find them. Sorry I can't upload a sample but firewall won't allow.

View 8 Replies View Related

Add X Days To Date

Nov 14, 2006

i need to have a macro to add 7 days in a date and then copy it back to the same cell, i write a code as below that adds 7 month and also not able to copy it back.

Sub RollPlan()
Dim dc1 As Date, dc2 As Date
Sheets("sheet1").Select
dc1 = Range("c1")
dc2 = dc1 + 1
Cells("c1").Value = dc2
End Sub

View 6 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved