Date Function - Calculate Ratio Between Months Based On Working Days?
Jul 25, 2014
I have added 3 tables data .. also I had created a sample solution calc for emp1 and project1 ... I need to calculation the ratio between the months based on the working days and allocate the efforts accordingly.
View 2 Replies
ADVERTISEMENT
Aug 28, 2008
I have just built a spreadsheet to calculate training hours amongst other things. I have used the function NETWORKDAYS which calculates the number of working days between two dates. This works fine on my laptop which has the analysis tools pack installed. Unfortunately my work place IS policy wont allow the analysis pack to be installed so need to find away around this. Does anyone know a formula that will perform the same function as the NETWORKDAYS. THis is crucial to the accurate calculation of training hours.
View 9 Replies
View Related
Apr 25, 2014
I'm in Excel 2010, and the cell with the date I want to work from is H22.
I'm trying to get the difference of the (date+12 months)-TODAY() to appear in months and days.
Here's the latest thing I tried (that doesn't work):
=IF(DATEDIF(H22,TODAY(),"y")>=1,DATEDIF(H22,TODAY(),"y")&" yrs, "&DATEDIF(H22,TODAY(),"ym")&" mths,
"&DATEDIF(H22,TODAY(),"md")&" days",IF(DATEDIF(H22,TODAY(),"ym")>=1,DATEDIF(H22,TODAY(),"ym")&" mths, "&DATEDIF(H22,TODAY(),"md")&" days",DATEDIF(H22,TODAY(),"md")&" days"))
I should also probably note that the date in H22 is the result of another function.
=EDATE(G22,12)
View 5 Replies
View Related
May 27, 2012
There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.
Countif Today()+90
View 5 Replies
View Related
Sep 13, 2009
I am using the following formula to calculate years months and days in Excell 2007
=DATEDIF(C7,D7,"y") & " yrs, " & DATEDIF(C7,D7,"ym") & " mths, " & DATEDIF(C7,D7,"md") & " days"
C7 3/24/04
D7 1/4/08
What is returned is 3 years, 9 months, 136 days
How might if fix it show the correct days?
View 9 Replies
View Related
May 5, 2014
Phasing Design.xlsx
We have a requirement to spread/phase amounts over multiple columns (representing months) using a weighting (represents working days per month).
We will calculate the weighting result in excel first (represented by a % per month), so the macro will be more of an allocation of row amount against the equivalent column %.
So far i have the following code:
VB:
Sub phasing()
Dim SourceA As Range
Dim Weight_ResA As Range
Dim TargA As Range
Dim i As Long
[Code] .....
View 2 Replies
View Related
Dec 31, 2013
In one column I'll have a list incrementing in 1w,2w,3w,1month and I want to be able to count the number of days that have elapsed till the latest cell. Right now I'm just winging it by saying there's always 31 days in one month using a COUNTA function, but I need it to be accurate.
View 9 Replies
View Related
Nov 22, 2013
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
View 7 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Dec 27, 2008
to calculate no.s of workdays between two given dates,
1.We work 06 days a week (so only Sunday is OFF)
2.What if I have some holiday between the given dates + Sunday OFF
View 9 Replies
View Related
Jul 29, 2009
I use [=IF(F15="","",EDATE(F15,-D15))] to track time frames. The problem is Edate works great for months but on occasion I need days, like 40 days. In cell D15 I have a list where the user must choose from, but one of the choices needs to be in days so the Edate won’t work anymore.
View 5 Replies
View Related
Aug 19, 2007
Is there a formula to calculate the working days left in the current month? I work in the financial services industry and am putting together a spreadsheet to automatically calculate sales production needs per "working day", based on my businesses schedule.
We are open M-F and Saturday, not including holidays. Now, I can look at a calendar, count the days left and put them in to the spreadsheet, but I'd prefer to have it calculate automatically.
On my spreadsheet, I have used the =TODAY() formula. In the cell below, I would like to have it calculate the actual working days remaining in the current month.
Since today is Sunday August 19th, I know that there are 11 working days left (starting Monday 08-20-2007). Is there a way to get Excel to do that?
View 9 Replies
View Related
Jan 3, 2008
I've been racking my brain on this one for awhile, and I feel like I'm going the right direction but...
I have a list of dates like:
11/30/2007
10/31/2007
9/30/2007
8/31/2007
7/31/2007
6/30/2007
5/31/2007
or maybe
11/30/2007
11/23/2007
11/16/2007
11/9/2007
11/2/2007
10/26/2007
10/19/2007
10/12/2007
10/5/2007
9/28/2007
9/21/2007
9/14/2007
9/7/2007
8/28/2007
...and I need to determine if the difference between them is daily, weekly, or monthly. There are 79 of these lists, on 79 different sheets so I can't visually peg them as daily, weekly, or monthly.
The way I have been looking at the problem is to calculate the number of months between the last & first dates and see if the resulting answer (+1) matches the number of actual dates, and so on...
View 5 Replies
View Related
May 25, 2014
I am now trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.
View 1 Replies
View Related
Apr 26, 2007
I have some cells which must be in the format 15/06/2007 15:25
I then need to add either days, months or years onto it.
Say the above date/time is in cell A1, when I do =YEAR(A1)+5 it displays 2012 if I choose the general cell format, but when I select the same cell format (date time) it comes out as 04/07/1905 00:00
View 9 Replies
View Related
Jan 6, 2010
I am trying to use the NETWORKDAYS function in excel to calculate the working days for my company. the problem is I m located in UAE and here Saturdays and Fridays are official days off for my company. Now the problem is that the excel have this built in function that Sunday and Saturdays are weekend days. I want to customize the function for my local days off for my company.
View 14 Replies
View Related
May 26, 2014
i am trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.
View 4 Replies
View Related
Mar 15, 2014
I know I will earn $5,000 of monthly revenue from a client. $5,000 is represented in a monthly revenue cell. I have 12 columns showing the 12 months of the year. There is an additional cell showing the customers implementation date.
If a company's implementation date is on or after the 15th of the month (example: 3/28/2014) then the next month (April 2014) is skipped and the $5,000 is returned to columns May through December. All months prior to May return $0.00. If the implementation date is before the 15th day of the month (example: 3/13/2014) then the next month (April 2014) and all months after will return $5,000. All months including March and prior must return $0.00. If the implementation date is unknown then 12/31/2099 would be in the implementation date cell and $0.00 is returned for all 12 months.
Essentially, if the implementation date is prior to the 15th of the month the revenue will show as of the following month. If the implementation date is on or after the 15th of the month the revenue skips the following month and will show the month after.
View 6 Replies
View Related
Apr 12, 2006
Start date: 12/04/2004
End date: 12/04/2006
The formula should give the answer to 24 months
Example 2
Start date: 12/04/2004
End date: 13/04/2006
The formula should give the answer to 25 months
When I use function =(YEAR(A4)-YEAR(A3))*12+MONTH(A4)-MONTH(A3), it does not
show 25 months for "Example 2" as it is still within the same month "April"
View 14 Replies
View Related
Jul 30, 2007
Is there a way to add # of months to a date and then find out what would be the exact date?
For example if cell A1 = 04/30/07 and Cell B1 = 14 what is the statement that would give me 06/30/08 in Cell C1?
Also, how can I modify the statement if Cell B1 = 14.5 to get 07/15/08?
View 9 Replies
View Related
Jan 25, 2010
I have a start date for a contract in cell AM1. I need AN1 show a date six months from the start date in AM1. I am fine with that part.
However, I would like for AN1 to calculate not only a six-month date but also to auto-update to the next six month date from AM1 once the first six month date is about, let's say, one month past. What I am doing is calculating when a six-month inspection needs to be completed; these inspections are ongoing, so I need them to auto-update.
So let's say a contract was awarded today, 25 JAN 2010. That would be value in AM1.
I want AN1 to produce a date six months from 25 JAN 2010, which would be 25 JUL 2010 (yes, this way of calculating the six month date is fine). Then around, let's say, 25 AUG 2010, I want AN1 to auto-update to produce the next six month date, which would be 25 JAN 2011 (six months from 25 JUL). Obviously the function would need to relate to TODAY() in some way.
View 11 Replies
View Related
Sep 25, 2007
I'm trying to create a quote... basically I need to find out about calculating ratios.
We have 47 students going on a trip to different venues, we offer 1:10 teachers (i.e. one teacher free, for every ten students going), however some venues offer a different ratio e.g. 1:5 teachers free of charge.
I need to somehow create a column where it will calculate the amount charged for the different ratios the venues offered.
View 9 Replies
View Related
Dec 17, 2008
I have a worksheet where in column B I have a vendor name, column E I have a date value and in column AF I need to calculate a due date based on 7 working days for vendor A and 14 days (not working days) for vendor B. I've tried to write an IF statement but can't do it. Can anyone suggest the right combination of IF/AND statements that would do this? I attach the workbook should my useless attempt at explaining my problem be unclear...
View 3 Replies
View Related
May 15, 2009
I am working on a sheet that will allow a user to enter a start month (from a pre-defigned drop down list) and an end month (again from ddl). What I need to calculate is in what months the employee worked in so I can calculate their salary cost by quarter.
It can populate other cells in order to do the calculation if needed. So, for example if an employee started in May, and worked until December, I need to calculate that he worked 2 months in Q1, 3 months in Q2, 3 months in Q3, and 0 months in Q4. Our fiscal year is April to March.. ;-) I have thought of several options, but none of them have worked 100%.
View 2 Replies
View Related
May 19, 2009
I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:
5/10/2009 to today is -9
5/22/2009 to today is 3
View 2 Replies
View Related
Apr 2, 2009
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
View 9 Replies
View Related
May 13, 2008
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"
View 7 Replies
View Related
Sep 30, 2003
I have a spreadsheet that calculates Reward to Risk Ratio for the stock market investing. The formula is Target Price - Entry Price / Entry Price - Stop out Price.
The problem is the ratio often comes out to something like 3/4 or 7/8.
Is there a way to reduce the result down so that the first number is always a 1 to make it more clear but still maintain the ratio. For example, 1-1.3, or 1-7.8, etc.
View 9 Replies
View Related
Nov 26, 2009
I was calculating the number of days between two dates using the Days360 function. However, now it is not accurate enough for me... Is there a function that is more accurate? based on 365 days and includes leap years... that I could use as I need this calculation to be exact? For example, number of days between April 1st, 2010 and August 31, 2012 is 884, but the days360 function returns 870.
View 4 Replies
View Related
May 20, 2012
I need a function to work out what the date will be 45 WORKING days after today(), this function needs to exclude Saturdays, Sundays and any Public Holidays i.e. there could be either 10 or 12 weekend days added into the calculation depending on when today() is plus any additional Public Holidays.
I am using Excel 2003 although it will need to work in Excel 2010 shortly.
View 4 Replies
View Related