Calculate Numbers Of Days Elapsed A Week / Month Or 6 Months From Now
Dec 31, 2013
In one column I'll have a list incrementing in 1w,2w,3w,1month and I want to be able to count the number of days that have elapsed till the latest cell. Right now I'm just winging it by saying there's always 31 days in one month using a COUNTA function, but I need it to be accurate.
View 9 Replies
ADVERTISEMENT
Oct 23, 2009
I have a start date dd/mm/yyyy, and require a formula that everytime a spreadsheet
is opened, based on the current date, to calculate how many years, months and days
have elasped yy mm dd since the start date...
My date formula knowledge is a little limited.
View 9 Replies
View Related
May 27, 2014
1. Calculate the time that has elapsed between 2 times in both hours:min (hhmm) and total mins (mm)
2. Compute the day of the week (mon-fri) a particular date fell on. I really only need to know if the date fell on a weekday or weekend.
table { }td { padding: 0px; color: windowtext; font-size: 10pt; font-weight: 400; font-style: normal; text-decoration: none; font-family: Arial; vertical-align: bottom; border: medium none; white-space: nowrap; }.xl63 { font-size: 12pt; } 1= M-F
2=S-S
3. How to write an If statement that assign a value to time based off this chart:
table { }td { padding: 0px; color: windowtext; font-size: 10pt; font-weight: 400; font-style: normal; text-decoration: none; font-family: Arial; vertical-align: bottom; border: medium none; white-space: nowrap; }.xl63 { font-size: 12pt; } 1= AM (7-1459)
2=PM (15-2259)
3= MN (23-659)
View 9 Replies
View Related
Feb 25, 2013
I currently am trying to refine some spreadsheets at work (hospital setting). The type of files im working with are medication sheets where on the left it states the medication and to the right of it, the cells have the days of the month(1-31) but I need them to change depending on the day they come into our facility. Above the numbers i would also like it to say the day of week with the first initial (M, T, W, T, F, S, S) in the cells are the top. It is something that we have to make for each day it it gets really annoying and is a waste of time moving the dates over for every day. find a way where I can open the file and the numbers and letters are all in the right place without having to change it for the day that the patients are coming in.
View 3 Replies
View Related
Feb 4, 2010
I have using the following Formula: =COUNTA(A3:A7,A10:A14,A17:A21,A24:A28,A31:A35)
Basically is counts how many week days there are in a particular month. Now I have a cell (B47) that counts how many Bank Holidays are in that month. I am having trouble using the formula then minus B47. I must be missing something really simple.
View 3 Replies
View Related
Aug 3, 2006
What I am trying to to is calculate the number of Years, Months, Weeks, and Days from one date to another. So far I can calculate years and months accuretly but I'm having trouble with the days and can't seem to figure out how to do the weeks.
I'm using the formula: =DATEDIF(B1,B2,"y")&" Year(s), "&MOD(DATEDIF(B1,B2,"m"),12)&" Month(s), and "&(MOD(DATEDIF(B1,B2,"d"),365))&" day(s)"
B1 is the current days date
B2 is the entered date
What I am getting when I enter the date 9/14/09 with the current date (8/3/06) is 3 years, 1 month and 43 days. when it shoud only be 3 years 1 month and 11 days. Any date I enter the days are not right. I can't seem to figure out what I am doing wrong. Also I'd like to get the weeks to come up also. Such as Start date 8/3/06 Entered date 10/19/09. What I want to see: 3 year(s), 2 month(s), 2 week(s), 2 day(s).
View 3 Replies
View Related
Dec 27, 2008
to calculate no.s of workdays between two given dates,
1.We work 06 days a week (so only Sunday is OFF)
2.What if I have some holiday between the given dates + Sunday OFF
View 9 Replies
View Related
Sep 13, 2009
I am using the following formula to calculate years months and days in Excell 2007
=DATEDIF(C7,D7,"y") & " yrs, " & DATEDIF(C7,D7,"ym") & " mths, " & DATEDIF(C7,D7,"md") & " days"
C7 3/24/04
D7 1/4/08
What is returned is 3 years, 9 months, 136 days
How might if fix it show the correct days?
View 9 Replies
View Related
Sep 28, 2011
Any example of counting the # weeks/days between two dates?
View 1 Replies
View Related
Jul 19, 2009
Cell A1 is a past date. In cell B1 I would like how many months have gone by since todays date. eg. Cell A1 = July 07, B1 would = 24 months.
View 3 Replies
View Related
Jul 25, 2014
I have added 3 tables data .. also I had created a sample solution calc for emp1 and project1 ... I need to calculation the ratio between the months based on the working days and allocate the efforts accordingly.
View 2 Replies
View Related
Dec 30, 2013
I would like to calculate the week number of the month based on a date.
Now my days would only include working weeks (Monday - Friday).
Supposed the date is 12/31/2012:
M
31-Dec
T
1-Jan
W
2-Jan
TH
3-Jan
F
4-Jan
Since it only occupies 1 day of the workweek, then it will be considered as Week 1 of January. If the date is 1/28/2012:
M
28-Jan
T
29-Jan
W
30-Jan
TH
31-Jan
F
1-Feb
It will be considered as Week 5 of January since it occupies 4 days of the working week. If the date is 4/29/2013:
M
29-Apr
T
30-Apr
W
1-May
TH
2-May
F
3-May
It will be considered as Week 1 of May since it occupies only 2 days of the working week.
Basically if the date's month occupies 3 or more of the working days of the workweek then it will be considered as part of that month's working week. Is this possible with formulas? I tried to explain it the best I can.
View 4 Replies
View Related
Aug 21, 2008
I am trying to figure out a way to count the minutes used from 8am-5pm Monday-Friday. I have this years worth of data. I would like to do it by month and by week and by day. I use office 08 for the mac and its my understanding that it doesn't have VBA. I would also like to be able to figure out if on a certain date a employee made over x amount of phone calls in a day. But have several employees. I have columns that are labeled date, employee, minutes used.
View 2 Replies
View Related
Apr 17, 2013
I am having trouble creating a formula to capture the "first of the month after 60 days" from the Hire Date.
Example, Hire Date is 01/15/2013, should return 04/01/2013. Would the ROUNDUP function be useful here?
View 8 Replies
View Related
Mar 17, 2014
I have a list of months in column A and would like a formula in column B that calculates the number of calendar days for each month (i.e. Jan=31, Feb=28 etc.)
View 9 Replies
View Related
May 7, 2014
In cell A1 = 15/06/2006 (dd/mm/yyyy)
What is the formula to find how many no. of days in month provided in cell A1.
View 2 Replies
View Related
May 18, 2012
Formula which can calculate how many days in a month and create a column for each day. Columns for day 28, 29, 30 or 31 also need the formulas in columns 1 to 27 copied over automatically. [sheet name "LARSheet1 to 1" ]
I'm trying to build "Leave, Attendance Management" system using Excel. I am about 40% there so far.
The basic structure of the workbook is as follows:
12x main monthly "Leave Attendance Record" worksheets (i.emonths April 2012 through to March 2013). [I will refer to these sheets asLARSheet1 to LARSheet12 ].
1 x worksheet which holds "data validation" list andvlook up info. ["FormulaListSheet"]
1 x worksheet acting as a database of staff details andpay numbers. ["StaffdBaseSheet"]
1 x summary page which shows staff reaming leaveallocation. ["SummaryLeaveSheet"]
What I'm having problems with at the moment is as follows:
A formula or a macro which works out how many days are present in a given month [starting date of month located in CELL B10].
Days 1-27 will be already set up on the sheet. Based upon the monthly value I would like a solution which can calculate how many days are in a month and create a column for days 28, 29, 30 or 31 (depending on the month).
I would like it to work like this:
When the user opens a new worksheet, they first entre the month start date in CELL B10. Hopefully this will trigger columns E13:AH22 to update with the relevant week day & date.
I also need the formulas and formatting in cells AH13:AH100 (column for day 27) to copied over automatically.
Sample of sheet setup : screenshot_LARSheet1.PNG
View 1 Replies
View Related
Aug 19, 2007
Is there a formula to calculate the working days left in the current month? I work in the financial services industry and am putting together a spreadsheet to automatically calculate sales production needs per "working day", based on my businesses schedule.
We are open M-F and Saturday, not including holidays. Now, I can look at a calendar, count the days left and put them in to the spreadsheet, but I'd prefer to have it calculate automatically.
On my spreadsheet, I have used the =TODAY() formula. In the cell below, I would like to have it calculate the actual working days remaining in the current month.
Since today is Sunday August 19th, I know that there are 11 working days left (starting Monday 08-20-2007). Is there a way to get Excel to do that?
View 9 Replies
View Related
Mar 14, 2014
I need a formula that will calucalte the monthly total based on the following conditions:
Col A = Yearly Cost
Col B = The number of the month when the costs are starting (1=Jan etc)
Col C = The duration or the number of months for which the costs are to spread
Col D is Year 2013 with the months across columns D-O. Row 1 above those columns shows the month's corresponding number.
Right now I have =IF($B3<=D$1,$A3/$C3,0) however if my start month is 1 and my duration is 5, I need the costs to stop after May. I've attached a sample file. Calculate based on start month and duration.xlsx
View 3 Replies
View Related
Dec 3, 2013
I am trying to calculate the time elapsed. I have included a caption to show my formula. The problem I have is that some times are showing > 60 minutes instead of increasing the hour. When my day go over the midnight hour I get a negative number.
View 11 Replies
View Related
Aug 24, 2012
I'm building a schedule in excel and am having trouble with the calculation of total hours when lapsing a day, or more specific, adding it into my current equation. For example; Monday they clock in at 5pm and work till 1am. I have found a couple of ways to get the desired out come from this on it's own. I just add the value of a day if the out time is less than the in time, or if the out time minus the in time is less than 0.
However, I need to add this calculation into an equation that is already calculating time elapsed within a single day, turning that into a decimal number and then checking if the total time elapsed is less than 6 hours, if false it subtracts a thirty minute break. Here is the current equation I'm using, I'm sure that there is an if(or, or if(and I could use to make it work when the time lapses 12am while also performing the 6 hour check to subtract the break.
=IF(((F7-INT(D7))*24)-(D7-INT(F7))*24
View 2 Replies
View Related
Apr 2, 2009
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
View 9 Replies
View Related
May 5, 2014
i wish to do some conditional formatting. my target for the first 6 months from date activated is 50,000 after 6 months is 100,000. and for those below target, i will need it to be highlighted in red. thus i have 2 sets of conditions.(calculate the no. of months and the revenue).
View 2 Replies
View Related
Jan 23, 2009
How can I convert the number of days for example 366 days to years, months, days 366=1year, 0 months, 1 day
View 3 Replies
View Related
Apr 3, 2014
I have been trying to get excel to calculate elapsed time between two dates using mostly what I've read from other elapsed time posts. But I am clearly missing a step. I'm trying to streamline my process for taxes.
I want to take a time in the format of " yy/mm/dd hhmm " example: 1
3/04/24 2245 ( note its a 24hr clock) 13/04/24 2245 would represent 2013 April the 24th at 10:45PM.
------- A --------------- B -------------------- C
13/04/24 2245 ------13/05/24 0900 ---------[display hrs elapsed] <-- currently get #name?
I have custom formatted A and B to yy/mm/dd hhmm and formatted c to [h]:mm
When you enter b-a in column c you get #name?
If its easier to have the date and time into separate columns I can give that a shot, I was just trying to make it as streamlined as possible for copy past.
View 11 Replies
View Related
Feb 16, 2010
I have been asked to make some ammendements to a workbook currently in use.
I have to calculate elapsed time, and my formula is giving me odd results. I have a start time (cell B5), and an end time (cell F5). The formula being used was =IF(F5>0,((F5-B5)*24)) which gave the correct result. The cell is formatted as general. It didn't alot for the situation where the end time has not happened yet.
I changed the formula to =IF(F5>0,((F5-B5)*24),(K5-B5)*24) where cell K5 is the current time. The results are coming out with 6 - 9 decimal places. It makes no sense as I've tried setting the times to be exactly 24 or 48 hours to the minute. I've also tried replacing K5 in the formula to now(),
View 12 Replies
View Related
Jun 16, 2014
I'm trying to write a formula that will tell me when its week one or week two, week three and week 4 based on a given date of any month.
I'm using weekday formula but no luck.
View 6 Replies
View Related
Jun 22, 2009
I am trying to build a spreadsheet to calculate how many hours have elapsed between to entries; start time (H10) e.g. 9:15 AM and end time (I10) e.g. 12:15 PM. The formula that I am using in the calculation cell field (J10) is (I10-H10+(I10<H10))*24. This formula works great till I wish to include in an IF statement. What I would like is if the total hours calculated with the formula (I10-H10+(I10<H10))*24 is less than 4, return 4 (hours) otherwise the value. As well if there is no start time nor end time entered then return zero.
View 3 Replies
View Related
Dec 13, 2013
test.xlsx
I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?
View 1 Replies
View Related
Dec 8, 2007
I've being trying t calculate an excel formula to work out a order turnaround time based on opening hours.
Example: The store is open from 8 am to 6pm monday to friday, I need to get a formula to work out how long it took from the time the order was logged until it was completed, during the course of the working day - this works fine but if the order was received on 06/12/07 at 5:20 pm then was finally completed by 7/12/07 at 11:55 the next day I need to figure out how to take into consideration of non working hours during that time. (time from 6pm to 8 am next day
example 2 - if order was sent on the 06/12/07 at 01:30pm and completed at 06/12/07 4:30 then I know its taken 3 hours to complete
example 3 - if the order was sent on the 06/12/07 at 5pm and completed next day at 07/12/07 at 10am - then I know it took 3 hours to complete
View 7 Replies
View Related