Jan 7, 2010
In my excel I want to use a calender date such as 05/21/09 and automatically add or subtract a specific number of days. For example: 10 days before 05/21/09....
I dont want to have to count back 10 days and manually enter it. Is there a way to have excel calculate and give me the date in my spreadsheet? i.e. automatically calculate (05/12/09)-(10 days)= 5/11/09. its not too hard when its 10 days, but when its -97 days, it can be very annoying.
View 5 Replies
ADVERTISEMENT
May 14, 2009
Hi Guys, This has been bugging me for a bit now and I just can't sus it...
I have a sample perpetual calender that I have been modifying to fit my own purpose. The calender part works fine.
I have beside that a column for holidays, etc and then a another column for other events.
When I put the date in the holiday or events columns I would like the date to be highlighted in the calender above (different colour depending on which column it came from).
The formula I have been playing with (no success) is:
=MATCH(DATE($R$2,1,C8),$I$41:$I$65,0) - This is the Formula for the 1st column of dates.
The 2nd formula is similar, just changes the column it tries to draw the MATCH(DATE.... from...
Although this formula works fine on the sample spreadsheet. When I enter the formula on my sheet, it doesn't seem to work...
I have attached the spread sheet that I am working on.
View 2 Replies
View Related
Jun 25, 2009
I wish to be able to calculate the % of a particular task that is done in a calender year based on the task start date and duration.
Columns Headings:
A: Start Date
B: Duration (months)
C: End Date (= Start date + (duration * (365/12)))
D: 2009
E: 2010
F: 2011
G: 2012, etc
Examples:
Start Duration End Date 2009 2010 2011 2012 2013 2014 etc
1 Jul 09 12 1 Jul 10 50% 50%
1 Nov 09 12 1 Nov 10 17% 83%
1 Nov 10 36 31 Oct 13 6% 33% 33% 28%
So there are two inputs and the outputs (%'s) are calculated for each year.
View 9 Replies
View Related
Oct 9, 2009
I found this code on this forum for a pop calendar. I created one for my user form, how ever I would like the calenadar to pop up when the user places the curser in the text box, when the user has slected the required date the calendar closes and the date the he/she selected is entered into the text box in which they placed the curser.
My userform is called userform1 and the calendar is called userform3
Private Sub Calendar1_Click()
Range("A1") = Calendar1.Value
Calendar1.Visible = False
End Sub
Private Sub CommandButton1_Click()
Calendar1.Visible = True
End Sub
The above code works on a putting the information into cell A1 and not the text box, also it has a command button action, which I don't want
View 9 Replies
View Related
Aug 11, 2014
Is there a way to calculate an age based on Date of birth and current date?
View 3 Replies
View Related
Jan 13, 2009
I can calculate the networkdays between two dates but how do I project a finishing date if I know the starting date, the holidays, and the duration of the task in working days? (Sample sheet attached, working in Excel 2003).
View 2 Replies
View Related
Jul 27, 2009
I need to calculate the amount of time between two dates, and show it in the number of hours and minutes. My dates are formatted to show the time in Zulu time. So 1406 = 2:06PM.
Here is what I have:
A1 = 6/4/08 1406Z
B1 = 6/5/08 0402Z
For this example, the formula should return a result of 13 hours and 58 minutes. With the result, there is no need to desingate Zulu time with a 'Z'. But I need the result in a format that will allow me to calculate an average for all my data.
View 9 Replies
View Related
Jan 1, 2010
I would like to calculate the total hours between two dates using a unique formula and without inserting new columns. I have attached an example of the data I'm working with.
View 4 Replies
View Related
Mar 28, 2012
I have 2 columsn with data that looks like this:
Creation DateResolved DateDifference in days7/1/2011 4:221/9/2012 14:587/1/2011 8:567/1/2011 13:517/1/2011 11:438/3/2011 17:157/1/2011 11:597/14/2011 14:077/3/2011 22:477/5/2011 11:037/4/2011 1:399/15/2011 15:207/4/2011 8:367/5/2011 9:357/5/2011 7:047/6/2011 9:107/5/2011 9:177/6/2011 10:007/5/2011 10:471/9/2012 14:37
I am trying to figure out what formula to use to calculate the difference between the creation date and resolved date in hours and days. That is, In once column I would like to see the difference in 'hours' and in another column I would like to see the difference in 'days'.
View 3 Replies
View Related
Oct 18, 2013
Calculate dates as The Number Of Days, Months Or Years Between Two Dates
The two formulas I tried below show the wrong output when trying to figure the days between 12/8/2011 to 1/2/2012. It should show 0 years, 0 months, 24 days, not 138 days.
I did notice when the day of the month on the start date is before the day of the month of the end date, the formula seems to work. Ref. the second dates on the first example.
Example 1
Start End
12/8/2011 1/2/2012 = 0 years, 0 months, 138 days
Wrong display. should show 0 years, 0 months, 24 days
Start End
12/1/2011 1/2/2012 = 0 years, 1 months, 1 days
Note that when the start date "day", (1), is before the end date "day", (2) the formula seems to work.
First formula used above:
=DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"y")&" years, "&DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"ym")&" months, "&DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"md")&" days"
Example 2
Start End
12/8/2011 1/2/2012 = 0 years, 0 months, 138 days
Should show 0 years, 0 months, 24 days
Second formula tried above:
=DATEDIF(B10,C10,"y") & " years, " & DATEDIF(B10,C10,"ym") & " months, " & DATEDIF(B10,C10,"md") & " days"
View 2 Replies
View Related
May 19, 2008
I seem to have the worst luck when it comes to getting dates and times to calculate together. My logic just seems to go straight out the window.
What I am trying to do, the end result, is get a Time Worked (duration) that I have spent on a ticket, and a Total Time, the time a ticket was opened, to the time it was closed.
I guess we can try to do this one step at a time.
The first thing that I would like to know is if there is a way to calculate Date/Time in a MM/DD/YYYY, H:MM format?
IE:
Ticket Opened ...................Ticket Closed
5/16/2008 2:54 PM..............5/19/2008 10:47 AM
Total Time in Days / Hours / Minutes
Right now I have the Date and Time split into separate cells, simply because I couldnt figure out a way to subtract the combined date and time.
View 10 Replies
View Related
Sep 11, 2008
This is more of a query on date dif
I was trying to calculate the difference between two dates on excel
I had a look through the search message board and searched the web generally where I came across the datedif function
I had found that in order to get the number of years it was
=datedif(startdate,enddate,"Y")
for months same formula"YM" and for days use "MD" in place of "Y" in the original formula
My question is when using datedif to calculate the number of days between two days it initialy gave me the right answer
Number of days between 01/08/2008 - 22/08/2008 - Answer 21 days
Using date dif gave me 21 days but when i did
01/08/2008 - 01/09/2008 - this gave me 0
Am I entering the formula wrong or does datedif simply not pick the difference if the days havent changed even though the month has ?
I then found i could simply minus one from the other , which then had me asking what is the point of date dif
View 9 Replies
View Related
Nov 2, 2006
I am trying to map the total networkdays across the months of the year for a list of contracts with variable start and end dates.
Example of the results I'm after:
Contract StartDate EndDate January February March etc.
Contract1 15 Jan 07 13 Jul 07 13 20 20
Contract2 5 Feb 07 2 Mar 07 0 18 2
I assume that the add-in NETWORKDAYS function is involved (and I'm ordinarily comfortable with using this function with only two dates and my named range of holiday dates), but I can't seem to figure out how to use it in this more complicated way. My own extensive struggles with it have led to ridiculously long and nested formulas that even I didn't understand after a few days away from them. I've searched the posts and seen questions similar to mine, but not close enough to give me a solution.
View 4 Replies
View Related
May 23, 2007
I thought this would be simple but I can't figure it out. I need to subtract the time between two cells. For example:
Cell A1: 6/6/2007 3:00:00 PM
Cell A2: 6/7/2007 2:00:00 PM
Result would be either 0:23 or 23 as in hours.
View 2 Replies
View Related
Aug 21, 2007
I am building a template to auto populate budget value by straight line based on task start/end date criteria. some tasks could give me correct duration distribution, but some don't. I am looking for If function, which could give me correct monthly allocation budget. Here is an example of what I am trying to achieve. task 0110 duration is from 09/15/07 to 05/24/08, duration month is 8. budget $34,465supposed to be allocated to 8 month starting from Sept, 07. but my if logic return 9 month instead.
View 8 Replies
View Related
Feb 26, 2008
I have a countif formula that calculates the number of entries between 2 dates. However i now need to also count how many of these match a 3rd value.
So i will need to work out how many "are greater than or equal to B2" "less than or equal to C2" and "equalling D2"
what i have already
=(-COUNT('Current Work'!AE8:AE2000)+COUNTIF('Current Work'!AE8:AE2000,">="&B2)+COUNTIF('Current Work'!AE8:AE2000,"<="&C2))
View 4 Replies
View Related
Jul 31, 2008
is anyone aware of a formula/macro that can calculate (in days, hours and minutes) how much time has elapsed between two date and time stamps?
For example [30/07/2008 00:30] and [01/08/2008 01:45], so in days hours and minutes it would look somewhat like this: 02:01:15
View 7 Replies
View Related
Jun 8, 2008
The current code which I did can only pop up a caledar when I click on cell D4. Is there a way I can program it such that, if I click on D5-D7 and E4 - E7, the same calendar will pop out also?
Also, there bug which I found in this code, that if I click on D4 once, the calendar will appear. After I select the date, the calendar dissppear. The bug will occur when i try to click on D4 again, the calendar will not pop up. it will only appear after i click on any other cell, then back to D4.
View 10 Replies
View Related
Feb 26, 2010
I have a Form created using the Control toolbox within Excel... The data is then transfer to another spreadsheet using linked cell within the properties i can then copy and paste into a master spreadsheet...
This form is emailed to an individual who then populates and emails it back to myself... Everything is working fine but now i would like to include a pop out calendar... I have managed to create the calendar but would like it to input the data into a Text Box rather than an active cell... Once this date is put into the active cell i can then mirror this back to the other spreadsheet using linked cell in properties
View 9 Replies
View Related
Sep 7, 2006
how to setup calender object in VBA application
View 4 Replies
View Related
Apr 4, 2014
Example.xlsx
how to calculate the difference in value of an item between two dates on a pivot table. I have one table that feeds the Pivot Table and it has three fields:
Data as of Date
Item
Value
So each day, the Data as of Date is updated to the current day and the items are the same but the values are different. I need to calculate the difference in value between the most recent date and x days ago. I cannot figure out how to do this via Pivot Table.
View 5 Replies
View Related
Jul 29, 2014
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
View 2 Replies
View Related
Mar 4, 2014
I'm just trying to calculate the difference between dates in two columns and applying conditional formatting based on if it is a positive or negative number. But when there is a null value in either of the date columns I don't want anything returned.
So far I'm either getting a 0 or a FALSE.
Column A = Date 1 Column B = Date 2 Column C = Formula
=IF(NOT(ISBLANK(B2)), B2-A2, )
View 2 Replies
View Related
Nov 21, 2008
I need to calculate the number of days between a string of dates in Column A. There will be blank cells in between the dates and I need to ignore those blank cells. I'm trying to use this formula: =DATEDIF(A13,A15,"d") but it returns an error with a blank cell in the string.
View 4 Replies
View Related
Feb 9, 2009
If I have the start date (say February 01, 2009) and the job will take 100 working days, when will it finish if there is no work done over weekends? I assume you can use networkdays somehow but the final logic escapes me
View 2 Replies
View Related
Apr 12, 2009
I have a calendar in the sheet attached. If there are leave dates that are marked in red, can I create a formula to count the number of leave dates for the entire year ?
View 5 Replies
View Related
Sep 24, 2009
I have a spreadsheet that lists items in column A with a start date in column B. What I need to do is in in column C list the next review date in increments of 5 days, but I only want the next day to show from the current date, not the inputted start date.
For example:
Column A Column B Column C
Item Start Date Next Review Date
Item A 12-Sept-09 27-Sep-09
Can I get a formula to calculate the increments and only show the next calendar date for the review, and then to change to the next date once the previous date has passed.
Alternatively, I have another sheet in my workbook that calculates the dates, is there some way I can display the next future date in a line of dates?
View 5 Replies
View Related
Sep 2, 2008
I'm not too hot with Excel formulas but I'll explain as best I can. I have 3 columns with dates and times
A - 01/08/2008 08:17:08
B - 01/08/2008 12:17:08
C - 01/08/2008 17:00:11
This is what I want to do...
If A > B then Calculate the time difference between A and C
If A <= B then Calculate time difference from B to C
I'd like to get this formula in 1 cell if possible?
View 4 Replies
View Related
Jan 25, 2012
From the below example, I would need to know the difference between date & time of Received and Resolved in number of days. Meaning - time difference should also be calculated in days
CELL ACELL BCELL CCELL DCELL E - REQUIRED OUTPUTReceived
DateReceived
TimeResolved
DateResolved
TimeTurn Around Time - IN DAYS20-Jan-122:43:00 PM23-Jan-124:50:00 PMDifference between Resolved date & time and Received date & time
View 7 Replies
View Related
Oct 23, 2013
My sheet looks like this - example:
ID Dates CombinedAverageDaysFromID
0001 2012-02-01 ?
0001 2013-08-10
0001 2013-10-10
0402 2011-01-02 ?
0402 2013-01-05
0402 2013-01-22
0003 2009-02-04 ?
0003 2009-12-04
0003 2010-01-04
0003 2010-03-03
0003 2010-08-02
0003 2012-04-04
0003 2013-01-05
0003 2013-10-03
I need to calculate the average days between the dates for each ID? How do I do this?
View 4 Replies
View Related