Calculate Days Between A String Of Dates
Nov 21, 2008
I need to calculate the number of days between a string of dates in Column A. There will be blank cells in between the dates and I need to ignore those blank cells. I'm trying to use this formula: =DATEDIF(A13,A15,"d") but it returns an error with a blank cell in the string.
View 4 Replies
ADVERTISEMENT
Jul 29, 2014
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
View 2 Replies
View Related
Oct 23, 2013
My sheet looks like this - example:
ID Dates CombinedAverageDaysFromID
0001 2012-02-01 ?
0001 2013-08-10
0001 2013-10-10
0402 2011-01-02 ?
0402 2013-01-05
0402 2013-01-22
0003 2009-02-04 ?
0003 2009-12-04
0003 2010-01-04
0003 2010-03-03
0003 2010-08-02
0003 2012-04-04
0003 2013-01-05
0003 2013-10-03
I need to calculate the average days between the dates for each ID? How do I do this?
View 4 Replies
View Related
Jul 28, 2009
I have a start date formatted as dd/mm/yyyy in cell A5
I have an end date formatted as dd/mm/yyyy in cell E5
In cell F5 I would like the result of the number of days between E5-A5 (Excluding weekends)
In cell G5 I would like the total number of days in the range F5:F25
In cell H5 I would like the total number of working days from A5 to Today
I am using the following formula to get the result in F5 etc
=SUM(INT((WEEKDAY(A5-{2,3,4,5,6})+E5-A5)/7))
I have copied this down and in the blank cells I get #NUM!
In cell F? were there is no date entered in cell E? I get a minus number (which I can hide using conditional formatting), but the minus number obviously has an affect on the result in G5, as cell G5 gives me #NUM! instead of the result for the current numbers in row F
View 9 Replies
View Related
Sep 14, 2006
i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?
View 9 Replies
View Related
Dec 11, 2013
I'm looking for the formula to calculate the number of winter days between two dates.
Say, that I'm having:
- Winter season start date (say Dec 1st)
- Winter season end date (say, March 1st)
=> All the days which are between these two are considered winter days for any given year.
- Two different dates defining the beginning and the end of my PERIOD. The total length of the period may be more than one year.
HOW do I calculate total number of winter days for the PERIOD?
View 13 Replies
View Related
Jun 4, 2009
I'm new here. I've searched these forums in the past for help, but never had to post, i've always been able to find something by searching. However, this time I couldn't find anything that addressed my specific need so I figured it'd be worth a shot.
Alright, I have two sets of dates, and i'm trying to set up a formular that calculates the numbers of days from the first date range that overlap/fall within the second date range.
For example:
In A3 type "1/1/2006"
In B3 type "1/1/2007"
In C1 type "6/30/2005"
In C2 type "6/30/2006"
Now, in C3 i'd like to insert a forumla that tells me how many days in the date range of 1/1/2006-1/1/2007 fall in the date range of 6/30/2005-6/30/2006. Basically for this is should be half the year, however many days that is.
Is this possible with a formula?
View 10 Replies
View Related
Apr 29, 2006
I am looking for formula to calculate the dates between two days (excluding the weekends)
I am working in Saudi Arabia and the weekend days over here are thursday and Friday.
View 9 Replies
View Related
Sep 28, 2011
Any example of counting the # weeks/days between two dates?
View 1 Replies
View Related
Feb 2, 2008
I am attempting to get the formula in Column "E" (see attached excel file) to work based off the individual reps 'days off / holidays' (Columns K:P (or more as needed) that they might have. the formula I am using (which works fine) is:
=IF(C2=D2,0, SUMPRODUCT((WEEKDAY(ROW(INDIRECT(C2&":"&D2)),2)={2,3,4,5,6,7})*(COUNTIF($K$2:$S$2,ROW(INDIRECT(C2&":"&D2)))=0)))
My issue comes up when I am coping this formula for say 100+ rows. When I copy the formula to all of the rows, the (COUNTIF($K$2:$S$2) becomes static and does not realize that the row (ie. Row 26 Rep C) has different days off than Rep A. I can manually change the reference for the countif to specify the correct row to their own days but that becomes tedious very quickly. I was wondering if anyone has come across a way to make the countif work based off of that the name in Column B matches the name in Column G then looks 'to the right' and uses the 'days off' that are listed for the corresponding Rep. I have tried a few different ideas but nothing has worked so far.
View 2 Replies
View Related
Feb 3, 2014
I have been using Excel to display, sort and present data in a professional way. I have created a pivot table with two columns below. Column C indicates the start date. Column D indicates the completion date. Blank cells show live data. I need to determine the number of days. 1) That have been - completed - a) That were < 2 Days, b) >2 but less than a week, c) > than a week (all). I have used the following formulas. a) countif(D4:D61, "<3"), b) countifs(D4:D61, ">2", D4:D61, "<=8"). Easy for completed data. My problem is, how do I determine the number of days, live data that following the same queries as above. I have figured out I can use countif to count the number of blanks by - countif(D4:D61, "(blank)") but how to put it all together and what formula should I use. I am trying to use countifs or if statements but am totally lost.
Column C Column D
---------- ----------
06/01/2014(blank)
25/11/2013(blank)
13/12/201314/01/2014
27/12/201317/01/2014
27/12/201310/01/2014
View 2 Replies
View Related
Mar 19, 2014
I have two date columns, a start date and end date. Another columns tells me the number of days between these two columns. It may return 45 days which actually straddle 3 different months.
My aim is to identify between this date range how many days in Apr 14. Then in the next column howmany days in May 14 etc
So on the spreadsheet Id have 12 columns for each month of the year. in Apr 14 for each row between the given date range I want it to tell me how many days are actually in April. Id then copy that formula into the May 14 column.
View 1 Replies
View Related
Nov 26, 2009
I was calculating the number of days between two dates using the Days360 function. However, now it is not accurate enough for me... Is there a function that is more accurate? based on 365 days and includes leap years... that I could use as I need this calculation to be exact? For example, number of days between April 1st, 2010 and August 31, 2012 is 884, but the days360 function returns 870.
View 4 Replies
View Related
Jul 5, 2007
I'm trying to calculate the number of days between dates in column A and B. I've looked at the examples in this site and thought I used the formula correctly, but the cell returns an error message when I type: =DATEDIF(A1,B1,"D")
View 7 Replies
View Related
May 7, 2013
I have 2 Columns of Holiday Dates (Column A is the "FROM" date; and Column B is the 'TO' date) and Column C is Peoples Names corresponding to the Holiday dates:
ie:
COLUMN 1 ; COLUMN 2 ; COLUMN 3
A1= 2 Jan 13 ; B1= 10 Jan 13 ; C1= Tom
A2= 4 May 13 ; B2= 10 Jun 13 ; C2= John
A3= 7 Jul 13 ; B3= 10 Jul 13 ; C3= Tom
A4= 3 Aug 13 ; B4= 25 Aug 13 ; C4= John
A5= 6 Dec 13 ; B5= 15 Dec 13 ; C5= John.
I am trying to figure out a formula (eg SUMIF) to calculate and summarize the number of Days Holiday based on a person's name (eg Tom's total Number of days Holiday days) based on the above column configuration of Dates and Names.
View 4 Replies
View Related
Feb 13, 2013
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
Input Data
Result
Start Date
[Code]....
View 3 Replies
View Related
Mar 22, 2014
How to create a spreadsheet with what I think will be a very simple formula?
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 7 or less days but more than 1, put a 2 in cell C2.
If date in B2 - date in A2 is 30 or less days but more than 7, put a 3 in cell C2.
If date in B2 - date in A2 is 90 or less days but more than 30, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
OR
Another, maybe simpler, way of saying it is:
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 2-7 days, put a 2 in cell C2.
If date in B2 - date in A2 is 8-30 days, put a 3 in cell C2.
If date in B2 - date in A2 is 31-90 days, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
View 9 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Nov 22, 2013
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
View 7 Replies
View Related
Nov 12, 2013
I have a data set that looks like the following.
Description S M T W T F S
Item 1 X X
Item 2 X X
I have a few thousand rows of this. The X's could be placed in any column. I need to go through this data and determine the maximum days between X's for each row. I can't think of how to do something like this with either an equation or with VBA.
I can't get it to line up in the table above. But basically, there could be an X in Sunday and on Wednesday in one row. The next, could be every day of the week, the next could be any other combination. There could be 7 X's, 1 X, 3 X's, whatever.
View 1 Replies
View Related
May 14, 2008
The attached workbook has dates in column C, although some of these dates are just strings.
I'm trying to write some vba that will tell me how many of the cells in column C contain a date (or looks like a date) that is greater than (after) the real date in cell G1.
At the moment I loop through the cells in column C and can ascertain, which dates can be counted, then copy one row over at a time, but I'm looking for a slicker (perhaps one-liner) answer, perhaps by copying a block of rows in one go. The aim is to copy those rows to another sheet. There are many more rows than in the attached, and many sheets to process, and I have no control over the format of the dates/strings in column C. Currently it takes about 20 seconds to copy over the necessary rows, but I'm looking for it to happen much more quickly; current thoughts are to sort on column C (sorting on column C anything that looks like a number as a number - which has it's own problems!), have a count of dates satisfying the criterion (say using a worksheet formula such as COUNTIF or SUMPRODUCT, perhaps also using EVALUATE) then copy a block of rows in one go.
not very relevant, but the existing code is something like this which highlights rather than copyies the rows(included in the attached): ...
View 4 Replies
View Related
Apr 22, 2014
I am currently using the following formula which has been working great for what we needed it to do:
=IF(ISERROR(NETWORKDAYS(O34,Q34,Holidays!C$2:C$20)-1),"Not Completed",NETWORKDAYS(O34,Q34,Holidays!C$2:C$20)-1)
The formula determine what was been completed on the previous work day. If it fell on a weekend or a holiday specified in another table, it would consider it the following weekday's work. However, the needs of management have changed and they would now like to see anything completed on a weekend or holiday push back to the previous weekday and I'm not exactly sure how to modify this formula to do that.
As an example, work was completed over Good Friday. Yesterday (Monday) when we ran the report, none of those showed up in our list of completed items until today (Tuesday). They would have liked those numbers to be included on Monday's report to get an accurate picture of work that was completed.
I have attached some sample data. Everything completed on the 18th, 19th is counted as 1 day behind but we would like 18th and 19th to be shown as 2 days behind, just like April 17. That way, if we ran the report today and set the filter to 1 (for column C), those items would not show up, but they would have shown up on yesterday's report.
Sample.xlsx
View 4 Replies
View Related
Jan 27, 2010
I’ve tried formulas for this but nothing is working, and was wondering if there was some vba that would do the job
Please find attached a sample sheet of where I’m up to.
I’m trying to calculate when someone goes sick to see whether they are entitled to company sick pay (CSP) Statutory sick pay (SSP) and most people will have waiting days (W D) before qualifying for CSP.
A6:A735 have set dates for two years
D6:D735 have the sick days an employee has taken
B6:B735 Matches the sick date to the date in column A
G2 has how many days entitlement for CSP
H2 has how many waiting days (W D) before CSP can start
In Column C i need CSP, SSP, or W D next to the number 1
And if someone only has 1 day sick they would not qualify for any of the above and I just need “S” in column C.
View 14 Replies
View Related
Apr 17, 2013
I am having trouble creating a formula to capture the "first of the month after 60 days" from the Hire Date.
Example, Hire Date is 01/15/2013, should return 04/01/2013. Would the ROUNDUP function be useful here?
View 8 Replies
View Related
Jun 16, 2008
I have been using: =DATEDIF(A1,B1,"md") & " days" to calculate the difference, in days, between two dates in a speadsheet, however, the number of formulae in the spreadsheet now is cumbersome so I'm trying to put it together in VB.
View 2 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Feb 18, 2014
I want to calculate the TAT between multiple date: For example: I have a request I received on 1/2/2014 and I sent to Abhi on 1/2/2014(Same day) and I got a reply on 1/3/2014 from Abhi. I forwarded the same request on 1/3/2014 to Prasad and got a reply on 1/5/2014. And I closed the request on 1/5/2014. How do I calculate TAT on this ? I want the Tat to be shown as 3 days because I just took three days on the request to complete that is 1/2/2014, 1/3/2014 and 1/5/2014..
View 4 Replies
View Related
Mar 26, 2014
I need to calculate the average amount of days it is taking for files to be processed. Here is the example I have.
Assuming that B1=0 and C1=1 (in the # of days row)
# of Days 0123456789101112131415Total Files
File Count011712113203000000049
View 8 Replies
View Related
Jan 8, 2009
I am trying to put a time sheet together that will place the number 8 in a cell when the work "sick" or vacation is in another cell.
For example, if I am out sick on monday, I would like to put "sick" in the cell next to monday and have the number 8 be placed in another place. Then If I am out "sick for three days I would like all of those "sick" days to add up to 24.
View 5 Replies
View Related