Calculate The Full WC Date From YY-WW?
Apr 30, 2009
I have weeks in format YY-WW (this week is 09-18) and wish to calculate the full date for the week commencing day for that week. '09-18 is in cell S8. To work out the date I currently have: =DATE(LEFT(S8,2),1,RIGHT(S8,2)*7-8)-WEEKDAY(DATE(LEFT(S8,2),1,3))
Which I thought was working fine, but turns out to be the WC date for 1909. I'll probably have to change the -8, that's not a problem, but I can't work out how to get it to 2009.
View 3 Replies
ADVERTISEMENT
May 12, 2006
This formula looks at a cell and replaces the full date with jst the month
and the year....but some cells are blank, in this case this formula sends
back "100"
I need to add something to this formula that when the cell is
blank...instead of putting "100" as it does now, I need it to put
"Unscheduled"...
Like "If 100, then "Unsdchedule"
View 10 Replies
View Related
Mar 18, 2014
I'm looking for away to convert the value of cells with a numbers that represents the days of the month as 1 - 31 to the full date.
As if the cell value is 3 convert to 3/3/2014 and so on. I tried changing the cell format which does covert it to 1/3/1900, then I experimented with DATEDIF but didn't get anywhere.
View 9 Replies
View Related
Apr 7, 2014
A spreadsheet im currently working on has the following formula
=SUMPRODUCT(--('Data Entry'!G2:G6000="AAAA"),--('Data Entry'!L2:L6000="Jun 14"),--('Data Entry'!M2:M6000))
It works fine, apart from the bolded text. In the Data Entry worksheet, column L has dates in the format dd/mm/yyyy. I'd like to get any date from June to be included without manually changing every date in June to Jun 14.
I think theres 3 ways of doing this, any of which would be great. Heres what I think. Where "Jun 14" is searching for exact text, I thought maybe I could change it to MONTH=6 or something to pick out June direct from a dd/mm/yyyy format. I couldnt get this to work. Know of anything I could replace "Jun 14" with?I tried to change the format of the entire column L in 'Data Entry' to a 3 letter month and 2 letter year. how to change the cell date format to fit this?Or if I changed the format of the dates to "01 June 2014" could I change my formula to try and just pick out the specific text "June" ignoring the day and year?
I know there must be a way how, but I can't seem to get it right.
The other option I thought of was to create a new column in the Data Entry sheet using the formula =MONTH(A1), then changing the formula to search for "1", "2", "3" etc for each month. I didn't do this as for the purpose of this the exact date is NOT important, only the Month is.
View 9 Replies
View Related
Jun 21, 2007
Is there a formula to set the a date in Excel based off the next full calendar quarter? In cell G2 I have the contract date: 01/26/06. I would like to have a formula in I2 that displays the first day of the next full calendar quarter, which is 04/01/06
More example dates:
if my contract date is: 10/21/05
my start date is: 01/01/06
View 3 Replies
View Related
Jan 14, 2014
I am trying to create a graph where the date starts on July 1st and runs through a full year to June 30. No matter how I sort the dates in the cells, the graph still wants to start in January. You will see from the attached picture the very right lines up with the very left, where these should actually be meeting in the middle. as to what I need to do? Please see photo and dataset.
Chart.jpg
DataSet.xlsx
View 3 Replies
View Related
Apr 21, 2006
I would like a lookup that takes multiple criteria and that is not an array formula! Unfortunately I decided to use array formulae and my spreadsheet went to over 45mb!! Not good. I've searched the forum for an answer to my questions but couldn't find any! I've attached a spreadsheet as an example. The examples I am using have {Sum(IF)} formulae in it (array) and I would like to change those to others that will not increase the file size so much and will not take too long to calculate.
Basically, I would like a lookup that will return me the Amount Paid and Full Cost based on the person's name and the date. the data and the results table are both on separate sheets. It would be nice to bring that file's size back down to less than 4mb!!
View 7 Replies
View Related
Mar 9, 2014
I'm trying to workout how to take a known initial date a repeating frequency and work out the next due date from today.
Example
Initial Date :- 1st of January 2014
Frequency :- every 5 weeks
Current Date :- 9th of March 2014
Next Due date should be :-12th of March 2014 (if I worked it out correctly from my paper calendar)
I want to use a cell formula to do this for different initial dates and varying frequency periods (the frequency will always be whole weeks i.e. 1,2,3,4,5,6,7,8,8,10)
View 4 Replies
View Related
May 7, 2014
I needs a formula (not VBA) to calculate the required start date.
I have to do a job of 14 working hours and this job must be finished on 05-may-2014 13:00
My working week is from monday u/i friday and every day I work from 08:00-16:00
At what time do I have to start the job to get it done in time.
The formula should give this result: 01-may-2014 15:00
View 3 Replies
View Related
May 19, 2009
I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:
5/10/2009 to today is -9
5/22/2009 to today is 3
View 2 Replies
View Related
Apr 2, 2009
I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
View 9 Replies
View Related
Jan 2, 2014
I have a table that looks like this (its basically a historical data of a stock exchange):
Date
Index
January 4, 2010
[Code]....
The List continues till the current Date.
I want to calculate Average Index Values of a Date of each month within a Date Range.
Example: Calculate Average Index Values for 3rd of Each month from 1st Feb 2010 to 3rd Jan 2011. Formula should calculate Average of the Index Values for 3rd Feb 2010, 3rd March 2010, 3rd April 2010, 3rd May 2010, 3rd June 2010, 3rd July 2010, 3rd Aug 2010, 3rd Sept 2010, 3rd Oct 2010, 3rd Nov 2010, 3rd Dec 2010, 3rd Jan 2011.
Both the Date and the Date Range is variable. Also, the Index Value for selected Date of one or more month may not be available as that being a holiday. In that case, the formula needs to use the last available Index Value before that Date. e.g. If Index Value for 3rd Oct 2010 is not available, system will use the Index Value of 2nd Oct 2010.
View 1 Replies
View Related
Sep 22, 2007
i am trying to create a forumla in a column (D in my expamle below) to count the number of days between two dates. Knowing that col D will change everytime the @now date changes - but thats ok..
COL A COL B COL D
ROW 1 Open Date Closed Date Count of days open
ROW 2 4/1/07 BLANK CELL Formula result here
ROW 3 4/1/07 9/5/07 Formula result here
if col b has a date then subrtract col a from b and display the # result, if col b is blank then subtract col a from location I store the @ now date - say Col ZZ Row 99? so no matter there is a count of number of days in every row in column D
View 3 Replies
View Related
May 13, 2008
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"
View 7 Replies
View Related
Jun 12, 2014
Looking to calculate timecycle from open date to close date. Having trouble trying to figure out how to have the formula look at the close date cell and if it is blank go to the next cell in the row to find a close date and subtract the open date from the close date to get the total number of days in the timecycle. See attached example.
View 1 Replies
View Related
Jun 26, 2007
Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?
View 5 Replies
View Related
Jan 25, 2010
I have a start date for a contract in cell AM1. I need AN1 show a date six months from the start date in AM1. I am fine with that part.
However, I would like for AN1 to calculate not only a six-month date but also to auto-update to the next six month date from AM1 once the first six month date is about, let's say, one month past. What I am doing is calculating when a six-month inspection needs to be completed; these inspections are ongoing, so I need them to auto-update.
So let's say a contract was awarded today, 25 JAN 2010. That would be value in AM1.
I want AN1 to produce a date six months from 25 JAN 2010, which would be 25 JUL 2010 (yes, this way of calculating the six month date is fine). Then around, let's say, 25 AUG 2010, I want AN1 to auto-update to produce the next six month date, which would be 25 JAN 2011 (six months from 25 JUL). Obviously the function would need to relate to TODAY() in some way.
View 11 Replies
View Related
May 13, 2014
I have a date and need to formula to tell me the date of the Sunday that occurs before it.
For example I want to it tell me that the Sunday before 13/05/2014 is 11/05/2014.
View 5 Replies
View Related
Jan 18, 2007
What is the formula to calculate a due date from a date in another cell?
If the date is 06-12-06 and the due date is the end of the month six months later, 12-31-06, how do I do this?
View 10 Replies
View Related
Nov 22, 2013
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
View 7 Replies
View Related
Feb 23, 2009
Is there a formula for calculating date for every 2nd thursday of the month excluding holidays?
View 4 Replies
View Related
Jul 3, 2012
I have a file that has filled me with dot '.' instead of bar '/'.
Would be possible to calculate dates in this format?
Data Firts
Date Last
Result
02.05.2012
03.05.2012
1
would then be a day as 'A2' - 'B2' = 1
View 6 Replies
View Related
Jul 30, 2008
how to calculate the date for one year. If i have 24-Jun-08 (A1) i need to calculate 24-Jun-09. If i do =A1+365 it gives me an error (the little green thing in the corner of the box) is there a way to do this without the error showing up.
View 9 Replies
View Related
Jul 3, 2014
I'm looking for a formula that will subtract a specific # of days from a future date, and then if the answer is a weekend, go to the next business day.
For example, I want to subtract 84 days from a deadline. Let's say the deadline is in cell A4, and is 1/3/15. I want to subtract 84 days from A4. This brings me to 10/11/14 which is a Saturday. I need the date produced to be the following Monday, 10/13/14.
View 3 Replies
View Related
Jan 16, 2009
Attached is the sheet I want to find the start date which shall be the end date (predecessor task end date) + 1 day in column c when I define predecessor in Column E which is the task number from Column A
View 2 Replies
View Related
Apr 20, 2009
I request a help:
A1 = 01-Apr-2009
B1 = 02-Apr-2009
C1 = 03-Apr-2009
D1 = Blank
E1 = 05-Apr-2009
F1 = 06-Apr-2009
What is the best suitable formula to find "First blank cell", then "date difference" between today and its previous cell's (i.e today minus "C1" in this case).
View 12 Replies
View Related
Jul 16, 2013
The sheet have Added date (when is the data was added) , updated On (when was the data updated) , name I want to calculate when how many days was it delayed.. how can I do it
View 2 Replies
View Related
Jun 12, 2014
1) In column A, I have different effective dates.
2) Based on Current system date, I want B column to be populated as "Overdue Date, or Due today or, Due tomorrow or Future dated" in front of that date.
View 5 Replies
View Related
Nov 18, 2006
I am having great difficulties getting the following formula to calulate wether the date in cell f2 is greather than of less than the given date.
=IF(F2<="18.11.06", "No Cover", "Under Warranty")
f2 = 14.09.02
This does produce the wanted result of "No cover" however if the date is 14.09.07 and therefore greater the 18.11.06 i will not get the expected result of "Under Warranty"
View 14 Replies
View Related
Oct 28, 2008
I have a sheet with dates in this format: 20080910. 1st: I tried to change the date format & tried most of formats but wasn't able to change it to become something like this: 05/22/08. Then what I need is to create a formula to calculate how many years till today has passed since that day.
View 5 Replies
View Related