Adding Time :: Dates Should Get Changed As Well
Apr 15, 2009
I am having a 2000 records of date and time in excel (see the below example). My query is I want to add 6 hrs to each Cell and accordingly the Date should get changed for e.g see the B Column after adding 6 hrs the data should look like this. I want an excel formula (don't want VBA Code) ...
View 9 Replies
ADVERTISEMENT
Oct 30, 2008
Excel has went from using the backslash to using a hyphen. If I try to format the cell, all the date choices use the hyphen, what possibly changed?
View 3 Replies
View Related
Mar 23, 2007
the dates in my spreadsheet changed from dd-mm-yyyy to a random 5 digit number. For instance, if I enter in 01-07-2007, it will re format to to 39089. I am trying to fix it, but I can't seem to figure out what happened and how to get all of the dates back to normal. Is there a way to fix this?
View 9 Replies
View Related
Aug 18, 2014
I currently have a spreadsheet with the following. I would like to convert the GL Date to just pick up the month. I have tried =mid(cell,4,2) but because this is a excel date it will not pick up 01 as the excel number for this date is 410001
GL DateMonth
01/01/2014
01/01/2014
01/01/2014
01/01/2014
01/01/2014
01/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
02/01/2014
View 2 Replies
View Related
Oct 28, 2008
I know that =now() will give me the time, and keep updating itself, but is there a formula I can use that will give me the time the cell was written into and maintain that time .. example, if I entered something into the cell at 3:45:21pm I want that time recorded in that cell and not change as they day moves on
View 9 Replies
View Related
Jul 24, 2013
In the spreadsheet attached, i have a formula now() which will update the current time in column B if i select opted from column A and similarly in column D the current time will get updated when i select option in column C.
However when i first select the option in column B the current time gets updated but after a while if i select the option in column C the time in the column B is also getting changed.
May be there is a different formula, Not sure what is the trick ?
Time sheet.xlsx
View 7 Replies
View Related
Sep 21, 2009
In my spreadsheet, I want a macro to write date and time everytime the user change a cell with a list validation. On the table, the E column contains the status of each row. I want to know since when the status is that.
View 4 Replies
View Related
Aug 23, 2002
Is there a way to cause a particular VB function I write to execute any time a value in a particular range of cells is changed?
I thought I had it when I thought I could do a sum formula, range on the cells to be checked, then call the function as a side effect of this sum. It was then that I realized I didn't know how to call VB from within an Excel cell formula.
1. Is there a way to call VB (say, sheet1.myFunction())?
2. Is there a better way to do what I want than to try to hack a side effect into a formula in a cell that depends on a sum (which "watches" for the changes for me.)
The cells would have text in them, not numbers, so using the sum-based formula would be iffy at runtime to me at best. What I really want to do is run a function on the cell value as a string. There are a lot of such cells (thousands) so ideally I would only need one external cell to activate the function (which scans all the cells I am concerned with) rather than have to paste a custom, relative formula into thousands of cells manually to have each one watch one cell, if you know what I mean.
View 9 Replies
View Related
Mar 28, 2008
I have a column of times: e.g. 10:03:00 and I would like to add them all up.
=A1+A2 works fine.
=sum(A1:A10) does not.
View 14 Replies
View Related
Dec 9, 2013
I have attached an excel sheet for your reference. I have particular debit values that are to be added between the dates. And Dates are also derived by formula based of payment term.
The ones I need to modify is Highlighted in Yellow. The values to be added is in "Customer Statement" and in H Column
These dates also have formula by which there are derived
-------------------------Current Ageing-------------------------
Date Range
Bucket
Amount
Percent
Start Date
End Date[code].....
I am USing =SUMIFS('Customer Statement'!$A:$A,'Customer Statement'!$H:$H,"=" & E11) but does not work.
View 9 Replies
View Related
May 8, 2014
I need to record time next to eg.: W3 cell,
Now I'm using below formula :
=IF(W3<>"",NOW(),"")
but the NOW function keep updating time itself, is there any VBA code or function that I can use with this formula ?
View 4 Replies
View Related
Aug 21, 2013
I have a spreadsheet where an engineer is expected to record sample temperatures of water outlets, along with the time he took the sample. Each outlet has a row on the spreadsheet with a column for the Temperature and column for the time. I would like to automatically input the current time(or time and date) on each line as the temperature is entered.
View 4 Replies
View Related
Feb 27, 2009
I am looking to have a macro which will automatically add the username and date to a cell, when the cell above changes (or in this case =x). I have a bit of code from a previous project, but I have changed Target.Row to Target.Column and it is not behaving as I require:
Private Sub Worksheet_Change(ByVal Target As Range)
If Not Intersect(Range("B2:BZ2"), Target) Is Nothing Then
Range("C" & Target.Column).Value = Format(Date, "dd-mmm") & " " & Format(Time, "hh:mm") & " by " & (Application.UserName)
End If
End Sub
See the attachment for the example. What I need is whenever row 3 ="x" I need the corresponding cell in row "d" to update with the latest date, time and username. Please not the macro is currently not active on the sheet as i've added the ' character.
View 3 Replies
View Related
Jul 16, 2014
I need to use the Worksheet Change event in a particular sheet in a specified column which works fine if the data is already there in the sheet and then changed however,the data is in this sheet is actually a Sub-Set of a Main sheet i.e certain filtered records are being copied from Main Sheet and then copied to this IBSL Sheet.
After the data is copied I have to check each record manually and then categorize each record as Fresh , Rebooked , Cancelled , Tranch or On-Hold.....These 4 criterias are added in the Column 38 and the same thing has to be repeated in the column 40 , so when i change the data in the column 38 the same category has to be updated in the same row in the column 40..
But the problem is that the data is first copied from the Main Data Sheet into the IBSL Sheet using a Macro so then this even t gets fired and goes in the DEBUG MODE...
I need this to happen when i change the category manually..I am adding data validation at the same time while copying the data in to the TEMP sheet.
So what can be done to achieve..
View 7 Replies
View Related
May 30, 2012
I want to add hours to a date-time cell to get result in date-time.
Format of cell A1 is d/m/yy h:mm AM/PM
Format of cell A2 is General
Format of cell A3 is d/m/yy h:mm AM/PM
I want to add A2 (number of hours) to A1 to give A3.
The formula I used is A3=A1+Time(A2,0,0)
The formula works perfectly fine when A2 is less than 24, but when A2 is more than 24, the date doesn't get changed.
View 6 Replies
View Related
Sep 7, 2007
I need a formula to add just the time to ' date and time', ignoring weekends.
eg:
Fri 24-Aug-07 10:52 is the date and time
28:48:00 is the time
If I add the time to 'date and time', result is coming as Sat 25-Aug-07 15:40
But it should come as Mon 27-Aug-07 15:40 (hence ignoring weekend)
View 9 Replies
View Related
Oct 1, 2008
I am replicating a Matlab program which calculates tide levels at different times of day. I need to replicate it in excel to speed up data analysis and I am nearly there.
what happens is I need to apply a time offset to the time of high tide at port a based on the time of day, so if it is:
between 00:00 and 06:00 the high tide at port b is 81.6 minutes after the peak at port a
between 06:00 and 12:00 the high tide at port b is 74.56 minutes after the peak at port a
between 12:00 and 18:00 the high tide at port b is 81.75 minutes after the peak at port a
between 06:00 and 12:00 the high tide at port b is 79minutes after the peak at port a
I tried this formula, where CO2 has the time/date of the high tide at port a:
=IF(CO2<0.75,IF(CO2<0.5,IF(CO2<0.25,CL2+(81.6/(24*60)),CL2+(74.56/24*60)),CL2+(81.75/(24*60))),CL2+(79/(24*60)))
The problem is the high tide on 07/01/2005 07:45 is read as 38359.32 rather than 0.32 - is there any easy way to tell excel I'm only interested in the time not the date? I have this spreadsheet setup now to do all the other bits required and i is just the timing that is a problem.
View 5 Replies
View Related
Jul 31, 2014
So I have two dates:
Opening Date: 29/07/2014 13:27
Closing Date: 29/07/2014 14:42
These are formatted in DD/MM/YYYY and HH/MM
I need to subtract the dates and find the time taken from the opening and closing time.
View 3 Replies
View Related
Jul 15, 2014
I have 4 distinct columns.
Adm Date Adm Time Trans Date Trans Time
1/16/2014 937 1/16/2014 1045
1/1/2014 121 1/1/2014 121
1/14/2014 800 1/11/2014 735
1/30/2014 100 1/30/2014 205
1/13/2014 800 1/12/2014 1202
I would like to calculate the difference (# hours spanned from the dates shown). Unfortunately when we transfer the data the COLON is dropped from MILITARY TIME so I am having problems in the calculation. This is also made more difficult as some of the calculates span over two dates.
View 5 Replies
View Related
Mar 30, 2009
I have a started time of say 8am from cell B3. I want to know what time it will be when I add a full number (hours) from another cell. For example A3+B4 where A3 is 8:00 A.M. and B4 is 4.04. I'm looking to get the a result of 12:04 P.M.
View 4 Replies
View Related
Jan 10, 2014
time variation between 2 dates including time (Exclude weekends and holidays), but include the worked time of weekend, if the end date and time falls under weekend or holiday.
Eg., A issues reported on 01Jan2014 12:00:00 PM and Resolved on 11Jan2014 12:00:00 PM
There are 3 weekends in the above mentinoned date - 5th, 6th and 11th
I can eliminate the weekends using the networkdays formula, but however in this case I need to eliminate 04th and 5th Jan (weekends), but Consider 12 hours from 11Jan2014(which is also a weekend), as the issue got resolved on Saturday afternoon, assuming for critical cases team works irrespective of holidays.
View 1 Replies
View Related
Mar 28, 2009
In this spreadsheet I am working on for calculating vacation time based on accrual rate. how to add pay period dates automatically based upon the first on entered. I have done this before in a personal budget spread sheet and this is what I have in that. First cell I enter the date Second and following cells I have the formula "=IF(DAY(E$8+7)>7,E$8+7,"")" Everything works perfectly. No matter what I put in the first cell the following cells will adjust and display dates 7 days later from the previous cell.
I am trying to do the same thing except pay period dates are 14 days apart so I put the same formula except change the "7's" to "14's). The problem I am having is that ONLY the first cell displays the correct date, the second displays a blank cell and the remaining displays "#VALUE!". What the heck is going on? I cannot figure out why this formula works in one circumstance but not the other.
I am not sure what I am doing wrong, but what I am trying to do basically is what ever I enter in the first cell, I want all remaining cells in the date column to enter the date of 14 days later. Example, I enter in the first cell 3/27/09, in the next cell I want 4/10/09 and in the next cell I want 4/24/09 to be entered and this all the way down.
View 2 Replies
View Related
Jun 18, 2009
When a cell changes i would like the cell in the next column to record the date of this change. After achieving this i want to set up conditional formatting to compare this date to the current date and if they are the same then change the original cell's colour to show it changed today!
I started using the code below (from ozgrid) which was working fine BUT my cell value in column A is actually taken from a different column. when the different column cell value changes my cell in A changes but the script below does not seem to see this as a change. it only records the date if i physcially change the cell in A rather than another cell prompting it to change.
based on my overall objective and my plans to date please can someone suggest a solution?
current code below....
View 9 Replies
View Related
Dec 29, 2008
it has various headings - but the ones I am stuck on are below.
BADGENAMEDATE Issued
He has set up a basic vlookup so that typing in his badge number also will type out his name. However, he also wants the current date to come up every time he does this.
As the names and badge number don't change and have no difference from row to row, how can I get it to date stamp it with a different date each time?
View 10 Replies
View Related
Dec 22, 2011
The code is supposed to project review dates 1 month, 2 months and 3 months after the start date, but the first "cell offset" line on is projecting the next day instead of next month, its driving me nuts!!, the others are working fine
Code:
Sub reviews()
Dim cell As Range
For Each cell In Range("L1:L200")
If IsDate(cell) Then
cell.Offset(, 10).Value = DateAdd("m", 1, cell.Value)
cell.Offset(, 11).Value = DateAdd("m", 2, cell.Value)
cell.Offset(, 12).Value = DateAdd("m", 3, cell.Value)
cell.Resize(, 10).AutoFill cell.Resize(, 11)
End If
Next cell
End Sub
View 3 Replies
View Related
May 10, 2007
I have a spread sheet that shows the dates items were shipped. When trying to work out the value of parts shipped in a month using SUMIF I get the value zero, I believe this to be because (obviously), there are multiple dates of ships during the month, I therefore tried ignoring the day of ship in the SUMIF but this did not work, the date format is DD/MM/YYYY.
View 9 Replies
View Related
Mar 10, 2008
1) To be able to get the current date in the format of 3/10/2008
2) To be able to take dates from 2 cells and get an integer value for the number of days between the two dates
View 9 Replies
View Related
Dec 14, 2009
I'm trying to limit the information people can put into my format and therefore to ensure they put in a the correct date etc i'm wondering if it is possible to have a calendar pop up to click on the date for a particular cell?
View 9 Replies
View Related
Feb 15, 2007
I'm having great difficulty adding hours to dates in Excel. In cell A1 I have a number which is calculated from a formula, it will normally return whole number values between 1 and 100. In cell A2 I have a start date and time i.e. 14/2/07 06:00:00 in cell A3 I want to add the number in A1 as hours to the date in cell A2. I am using the formula in A3 as =A2+TIME(A1,0,0) it seems to work okay for numbers that don't take the date onto the next day but if I try to add 24 hrs or 48 hrs for example the date still stays the same.
View 7 Replies
View Related
Mar 25, 2009
how i can automatically add a week to a start date i have in a rotas for the whole year?.
View 3 Replies