Mar 25, 2009how i can automatically add a week to a start date i have in a rotas for the whole year?.
View 3 Replieshow i can automatically add a week to a start date i have in a rotas for the whole year?.
View 3 RepliesI've got data in E4:I4, Monday - Friday.
What I need to do, is add the total of those 5 figures in a total, but then clear the data in those 5 days.
Then when I input the data for the next week in to those days, I want it to add to the previos week.
So basically;
In week 1 the 'Total' is just week 1
In week 2, the 'Total' is week 1 & week 2'
I will only be going up to week 5. (only week 5 once in a 3 month period, so 2 4 weeks and a 5 week)
I have a simple time sheet that I want to insert weekly dates by the date I have. I don't know the formula for that. I've attached the time sheet. TimeSheet2.xls
View 10 Replies View RelatedBelow is a format of dates I want to make it in weekly format, select the Fridays or any specific day and separate them from this list.....
01-10-2013
03-10-2013
04-10-2013
07-10-2013
08-10-2013
[Code]....
I have the following setup:
52 weeks of 2010 cost with the following structure:
week number | wk1 | wk2 | wk3
week ending | 1/10/2010 | 1/17/2010 | 1/24/2010
weekly cost | 57,000 | 35,000 | 42,000
I want to be able to use the above data to present a summary, but instead of weekly, list the data on a monthly basis:
month | Jan | Feb | Mar
monthly cost | wk1-4 | wk5-8 | wk9-12+3days wk13
Any way to set this up automatically instead of having to split the weekly data as many months share the same weeks?
Need the formula to enable a cell to automatically update the date on a weekly basis
View 2 Replies View RelatedIs there any weekly leave planner that shows the dates of the mondays in the month? eg in Jan we have 4,11,18,2
View 3 Replies View RelatedThis is in Excel 2010
I have, what I believe a fairly complex request.
I have 3 fields that will be entered manually per row
Frequency in weeks = FQ Example FQ = 4 weeks
Duration in hours = DUR Example DUR = 3 hours
Start Date in Date Format = SD Example SD = 01/15/14
I have a series of columns starting at December 30, 2013. This represents the week of December 30th 2013.
It continues on until I hit the last week in December of 2015 which is 12/28/15
There are multiple rows with the 3 entries listed above (FQ, DUR & SD).
I need a function or macro that takes the Start Date (SD) for the specific row and finds it's location in the series of columns (for the example of 01/15/14, it would land on week 01/13/14). The program would enter the Duration (DUR) in that Column's Row (if that makes sense).
The program would then add the Frequency (FQ) to the Start Date (SD) and look for the next column (or Week) that it would fit in and once again enter the Duration (DUR) in that cell.
It would do this until it hits the 12/28/15 end date.
I have attached an excel sheet for your reference. I have particular debit values that are to be added between the dates. And Dates are also derived by formula based of payment term.
The ones I need to modify is Highlighted in Yellow. The values to be added is in "Customer Statement" and in H Column
These dates also have formula by which there are derived
-------------------------Current Ageing-------------------------
Date Range
Bucket
Amount
Percent
Start Date
End Date[code].....
I am USing =SUMIFS('Customer Statement'!$A:$A,'Customer Statement'!$H:$H,"=" & E11) but does not work.
In the attached workbook, the CASTINGS worksheet has a SOH ( stock on hand) column.
It looks up the SOH from the SOH worksheet (column 3) for each product on order for that week.
But how do I make week 2 use the SOH figure minus the previous weeks order, IF there was an order?
And so on until week 52.
The problem I have found is what if that product wasnt ordered for the last 4 weeks? Maybe I need a temp worksheet with all the products listed for all the weeks and a running total of SOH weather it is ordered or not?
I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.
View 6 Replies View RelatedI have created a time sheet in excel (see attached) that will be part of the larger workbook that will be linked with other sheets to auto fill in most fields. I am wondering if there is a way for an user to enter a Month and a Year at the top of the page and that in turn automatically fills in the days of the month by week.
So in attached sheet there are 5 boxes representing 5 weeks in a month. So if we used May 2014 as an example I would like to know if there is a way that once May 2014 is entered in up to top that. Excel fills in the dates in Week #1 with under Thursday showing 1st, under Friday showing 2nd as on for the entire month...
So as the month go by all user has to do is state the month and year and excel fills in the weekly dates for each day in month.
Attached File : Time and Attendance.xlsx‎
I have a work book of 3 sheets . the date in the first sheet are linked with the other 2 sheets , sometimes I have to add a row in the first sheet , within the the the table it contains ,
what I need is : a new raw is being inserted (created) in the other 2 sheets with tha same date I entered in the new row I added in the first sheet . beside the possibility to let me difine where that new row is being inserted in each of those other 2 sheets ( separately).
I require a total amount of 'cost price' items we have in stock.
As you can see from sheet 1, 'Adidas', the total is £43.00. However that is not the cost of stock, as some items are not in stock, as per Column I. (The cost is actually £36.00).
How can I make a total to include just items in stock? Bear in mind new stock is inserted between others in order of Model so the forumale would need to update automatically, and there are several hundred sheets, not just 2.
I have a spreadsheet where I will input details for "incidents" under different headings on one row per entry (I will have a separate tab for each "incident", and each row will relate to each customer affected by this incident)
For every row that is completed I have a "Summary", which is just a section of the same worksheet, that will list all the basic details of the above entries in a format that will be printed and passed to a different department.
As I will be unable to determine whether a particular incident will have 5 entries or 50, I need a way to add a new row to my "Summary" section if and when a row is completed.
I have a formula to populate the data in the "Summary" section automatically, so all I need now is for it to add new rows as and when they are needed, copying the formulas from the original row, so each new "incident" entry is copied each time.
I have created a dummy spreadsheet but I'm not sure how to attach it to this post.
In this spreadsheet I am working on for calculating vacation time based on accrual rate. how to add pay period dates automatically based upon the first on entered. I have done this before in a personal budget spread sheet and this is what I have in that. First cell I enter the date Second and following cells I have the formula "=IF(DAY(E$8+7)>7,E$8+7,"")" Everything works perfectly. No matter what I put in the first cell the following cells will adjust and display dates 7 days later from the previous cell.
I am trying to do the same thing except pay period dates are 14 days apart so I put the same formula except change the "7's" to "14's). The problem I am having is that ONLY the first cell displays the correct date, the second displays a blank cell and the remaining displays "#VALUE!". What the heck is going on? I cannot figure out why this formula works in one circumstance but not the other.
I am not sure what I am doing wrong, but what I am trying to do basically is what ever I enter in the first cell, I want all remaining cells in the date column to enter the date of 14 days later. Example, I enter in the first cell 3/27/09, in the next cell I want 4/10/09 and in the next cell I want 4/24/09 to be entered and this all the way down.
I have a list of data some with people titles, others with it missing. what i plan on doing is
D is the collum for title some are entered others are not. collum G has male and female already filled in.
is there a code to say if D is empty then look at G if it is female enter Ms in collum D and if male enter Mr in collum D.
I have a data set of 300 points and i want to increase my data range by a factor of 10 .
For example if i have Column A with master points A1=10 A2 = 20 A3 = 30 .
I would like to be able to automatically enter in the same about of new rows between each point . Then calculate there difference between the master points and populate the new rows in sequence . For example The difference between A1 and A2 = 10. So the new A2 would be 11
I would like to have A1=10 A2=11 A3= 12 A3=14 Etc as the new cells.
I have a formula in column G of a worksheet, however when a new row is inserted within the formula range, the formula does not continue in the new row.
Is it possible to make excel continue the formula without having to drag the formula down again?
it has various headings - but the ones I am stuck on are below.
BADGENAMEDATE Issued
He has set up a basic vlookup so that typing in his badge number also will type out his name. However, he also wants the current date to come up every time he does this.
As the names and badge number don't change and have no difference from row to row, how can I get it to date stamp it with a different date each time?
The code is supposed to project review dates 1 month, 2 months and 3 months after the start date, but the first "cell offset" line on is projecting the next day instead of next month, its driving me nuts!!, the others are working fine
Code:
Sub reviews()
Dim cell As Range
For Each cell In Range("L1:L200")
If IsDate(cell) Then
cell.Offset(, 10).Value = DateAdd("m", 1, cell.Value)
cell.Offset(, 11).Value = DateAdd("m", 2, cell.Value)
cell.Offset(, 12).Value = DateAdd("m", 3, cell.Value)
cell.Resize(, 10).AutoFill cell.Resize(, 11)
End If
Next cell
End Sub
I have a spread sheet that shows the dates items were shipped. When trying to work out the value of parts shipped in a month using SUMIF I get the value zero, I believe this to be because (obviously), there are multiple dates of ships during the month, I therefore tried ignoring the day of ship in the SUMIF but this did not work, the date format is DD/MM/YYYY.
View 9 Replies View Related1) To be able to get the current date in the format of 3/10/2008
2) To be able to take dates from 2 cells and get an integer value for the number of days between the two dates
I'm trying to limit the information people can put into my format and therefore to ensure they put in a the correct date etc i'm wondering if it is possible to have a calendar pop up to click on the date for a particular cell?
View 9 Replies View RelatedI'm having great difficulty adding hours to dates in Excel. In cell A1 I have a number which is calculated from a formula, it will normally return whole number values between 1 and 100. In cell A2 I have a start date and time i.e. 14/2/07 06:00:00 in cell A3 I want to add the number in A1 as hours to the date in cell A2. I am using the formula in A3 as =A2+TIME(A1,0,0) it seems to work okay for numbers that don't take the date onto the next day but if I try to add 24 hrs or 48 hrs for example the date still stays the same.
View 7 Replies View RelatedI am trying to automatically add the last day of the month based off of the month
for example
a1 = beginning date
a2 = end date
a1 will always be the 1st day of a given month
then based off a1, know the last day,(i.e.... october 1, then put 10-31-08 into a2, or november 1, then put 11-30-08......)
In the attached workbook I have 3 sheets. The first 2 with the names starting with WO are individual sheets based on a single scaffold rental. The "Standing Equipment" worksheet is adding the components from the other two worksheets. Easy enough, but I am looking for either a formula or some VBA guidance on how to have the "Standing Equipment" worksheet automatically change it's formulas to incorporate new worksheets as they are either added or deleted, thus avoiding constant formula editing as scaffolds are erected or dismantled.
View 3 Replies View RelatedI am having difficulty trying to consolidate a much larger version of the attached spreadsheet. I need to be able to have excel automatically add up the assets, based upon the firm ID. I have looked around and thought that SUMPRODUCT or SUMIF would work for what I need, but I've been unable to get either to work. I almost need to do a VLOOKUP and have it SUM at the same time.
View 3 Replies View RelatedI'm using a workbook that has one sheet that pulls data from all the others, displaying a series of rows that summarizes data from each worksheet, each of which is full of data. Its a worksheet that a lot of people use so its kind of tedious to use as of now, because whenever you add a new worksheet of data you have to manually create a row and then manually change all the worksheet references. Is there a way to make rows automatically add and update when a new worksheet is added? I know it would probably have involve some sort of Macro or VBA.
View 1 Replies View RelatedThe way the code works right now is that I have it run as a few loops. it will first loop through the first worksheet in the array and delete what I need and then when that loop finishes it will run two macros that I have added in, then it will loop to the next worksheet in the array. right now it is only 2 sheets but eventually it will be many more. just working out the code for now. What I would like to do is in the second loop. my second macro in the code formats each page and, what I would like to do is add a date column to my code. I need to start at 1/05/2014 and then for the next iteration in the loop add 7 days.
[Code] ......