Determine Number Of Workdays Per Week In Given Month
Dec 6, 2013
Is there a formula I can use to determine the number of work days in each week for a given month. The work week would start Sunday, with Friday and Saturday as days off. Each week would be in their own row.
i.e.
January
Week 1: 2 days
Week 2: 5 days
Week 3: 5 days
Week 4: 5 days
Week 5: 3 days
[Code] ..........
View 4 Replies
ADVERTISEMENT
Jan 13, 2014
In cell A1 I have a date 1/1/14
I need to get the number of business days for the month that is entered in the cell. I tried NETWORKDAY formula but needs a start and end date.
View 3 Replies
View Related
Nov 24, 2009
I have a column where I am convering the Date into a Fiscal week number.
For example 10/6/2009 is Work week 41
Now I want to show October Week 41
I need to add the month and the text "Week" before the week number. what is the formula I use.
View 3 Replies
View Related
May 1, 2006
I would like to create a monthly inventory, based on workdays (Monday - Friday)Myrna Larson has a formula that I would like to use with the workday function, but I don't know how to combine them.
=IF(A1="",A1,IF(MONTH(A1+1)=MONTH(A1),A1+1,""))+ = workday
to fit on the page, I need the dates to be from the 1st to the 15th, and 16th to the 31st. I am not sure how to write this either.
View 11 Replies
View Related
Mar 26, 2008
I want to use a formula to calculate what week number in the month it is (i.e 1 to 6) from a particular date.
I know how to calculate this on an annual basis (i.e. 1 to 52) but not within the month.
This is what I have so far...
=IF(OR(D58=1, D58>=D57), ROUNDUP(DAY(D61)/7,0),ROUNDUP(DAY(D61)/7,0)+1)
d58 is a Weeday formula looking at d61 which is the date i want to look at. d57 is the weekday number of the first day of the month in cell d61.
View 13 Replies
View Related
Nov 15, 2013
I have week numbers from 1 to 52, now i want to get which week number will falls in which month, is there any formula in excel
for eg. Week 01 - 05 will fall in January month (2014), likewise..
View 1 Replies
View Related
Apr 22, 2009
In the attch file i have the date coulumn from this date column i need to calulate the month & week no. (like WEEK1,WEEK2..)
The Week ( Monday to sunday) which need to be calculated is the week no. in the given month
like for month of April the week1 is print in the week column for 6april to 12 april date and Week2 print for 13 April to 19 april
View 14 Replies
View Related
Dec 30, 2013
I would like to calculate the week number of the month based on a date.
Now my days would only include working weeks (Monday - Friday).
Supposed the date is 12/31/2012:
M
31-Dec
T
1-Jan
W
2-Jan
TH
3-Jan
F
4-Jan
Since it only occupies 1 day of the workweek, then it will be considered as Week 1 of January. If the date is 1/28/2012:
M
28-Jan
T
29-Jan
W
30-Jan
TH
31-Jan
F
1-Feb
It will be considered as Week 5 of January since it occupies 4 days of the working week. If the date is 4/29/2013:
M
29-Apr
T
30-Apr
W
1-May
TH
2-May
F
3-May
It will be considered as Week 1 of May since it occupies only 2 days of the working week.
Basically if the date's month occupies 3 or more of the working days of the workweek then it will be considered as part of that month's working week. Is this possible with formulas? I tried to explain it the best I can.
View 4 Replies
View Related
Oct 28, 2009
I would like to know how to get the number of working days in a month based on the date in B4 which is formatted as "mmmm".
So if B4 was October the result would be 22 regardless of the actual date in B4.
I also have a named range "Holidays" for UK bank holidays (ready for December) that I would like included within the formula.
View 9 Replies
View Related
Jul 31, 2009
I'm needing a formula that will determine the number of days that fall in a specific month based on a date range. For example, if I have a date range of 10/15/2009 to 01/13/2009, I need the formula to determine the number of days in each month within the range (October has 15 days in the date range; November has 30, December has 31, and January has 13.) I have a large spreadsheet that would be so much easier to manage with such a formula. Currently, my spreadsheet is setup as follows. I need the forumla automatically fill in the number of days under each month.
Stard Date End Date Oct-09 Nov-09 Jan-10 Feb-10
10/15/2009 01/13/2009
I'm using Excel 2007.
View 9 Replies
View Related
Oct 18, 2007
What formula would I use to display how many workdays there are in a month.
The month is displayed in cell A1
View 9 Replies
View Related
Oct 26, 2009
My macro's function is to paste the workdays of an entire month in a specific row of a worksheet. Everything seems to work except using a number to reference the column in which to store the values. I've searched the web for over an hour and found two "solutions":
1. write a function to convert column number to a letter
2. utilize Cells object
#2 seemed more efficient but the function is giving me the error: "Runtime Error: '1004': Method of 'Range' of object "_Worksheet' Failed"
View 4 Replies
View Related
Jan 12, 2013
In column A of a database I've calculated workdays for all year (excluding weekends and public holidays).
Every day, I update the numerical data of the database, with the facts of previous day.
In another sheet I've made some monthly, quarterly etc., reports for that data.
What I want, is to have:
1) a report every day, with the sum of specific data (say that in column D), for a period starting the first workday of current month and ending the previous workday of today.
2) the total workdays days for that period.
View 4 Replies
View Related
Jun 16, 2014
I'm trying to write a formula that will tell me when its week one or week two, week three and week 4 based on a given date of any month.
I'm using weekday formula but no luck.
View 6 Replies
View Related
Jan 2, 2014
I need a way to calculate the number of workdays, Saturdays and Sundays in a month.
In my model, the client can choose to work on Saturdays and/or Sundays.I need someway to show that a given month (e.g. June 2014) has some # of workdays, and some # of Saturdays and some # of Sundays.I can do this on three separate rows.
eg.
Row 1: Month
Row 2: Wordays
Row 3: Saturdays
Row 4: Sundays
Still i need some way of determining that a given month (June 2014) has 22 work days, 4 Saturdays and 5 Sundays,... et cetera
View 4 Replies
View Related
Mar 26, 2008
I have a range of data which is as follows:
Week in month: 1 1 1 5
Site: 01/03 02/03 03/03 etc 30/03 etc
Leeds 10 9 15 20
Manchester 8 5 1 2
Etc
Here's what I need to produce:
March 08 April 08
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
Leeds
Manchester
I need to sum week 1 to 6 for each month Mar, Apr and so on. The different sites are in the same order so that doesn't matter too much.
View 14 Replies
View Related
Feb 26, 2014
I am looking for a formula which substract a number of workdays defined in a cell from a date defined i nanother cell. For example I have a date in cell B2: 10.08.2014 - this is the due date for service delivery. In cell C2 there is a number of workdays: 84 - this is the duration for the delivery process. I would like to have a formula calculating in cell D2 the date when the delivery process has to start. The tricky point is that B2 is basicly a range of merged cells B2:B6. As an example I am attaching an exmple sheet.
View 10 Replies
View Related
Oct 18, 2008
Get the number of workdays between two dates in a VBA function. I tried simply using the Advanced Toolpak function NETWORKDAYS, but I get the error message "Sub or function not defined". I did reference to atpvbaen.xls in the Tools > References menu, so I don't know why Excel is not recognizing the function.
I used the following function to test it:
Function CalcNetDays(dInitial As Date, dEnd As Date)
CalcNetDays = NetworkDays(dInitial, dEnd)
End Function
Any reason the function is not working?
Also, I need to add the holidays to the function. The holidays are listed on a worksheet column. Do I simply add the range to the function, like below?
CalcNetDays = NetworkDays(dInitial, dEnd, Range("Holidays"))
View 9 Replies
View Related
Mar 6, 2010
I have a running time sheet daily. It has 2 columns for Labor and 2 columns for travel
i.e. travel From / To 1300-1400 calculate 1 hour then travel home 1600-1700 1 hour this is calculated by the date entry 01/02/10 I have another calculation that tracks by the date i.e. 01/02/10 then Next job which all works fine.
The problem becomes how do I calculate a weekly total labor and travel by the date So added another column called weekly hour’s labor and use the Weeknum to determine which week is which day/date so the first Monday in January 2010 is week 2
2 problems
Having many multiple day / date entries are the same date x 7 days Monday –Sunday
(Relies on the date entered and the weeknum) 01/03/10 each line is complete however the dates carry over as does the time
When trying to calculate each row x 3 same date time then the value will be incorrect I need to calculate
Say 9.5 hour labor from the date 01/03/10 not 28.5 hours and then calculate the total weekly hours
01/03/10, 9.5 hours labor, 3 hours travel
01/03/10, 9.5 hours labor, 3 hours travel
01/03/10, 9.5 hours labor, 3 hours travel
i do have work and travel times for each job on the same line (separate columns) but I display the total here by date to summarize the totals
i have tried sum products and sumif to avail. I am using Windows XP SP2 with MS Office 2007
how do i calculate weekly hours by date and weeknum ?
Total Work per day
Total Travel per day
Daily....................
View 9 Replies
View Related
Nov 2, 2008
1 2 3 4 5 6
11/1 11/2 11/3 11/4 11/5 11/6
sat sun mon tues wed thur
what i am trying to do is to be able to put a date in a cell and it would fille in the month day and day of week
=$D$1
=$D$1+E5-1
=TEXT(WEEKDAY(D6),"ddd")
cells are not correct in the formulas just copied them. i got this to work in a set up xls file when used it in the real setting i get ###.
View 3 Replies
View Related
May 10, 2012
Assuming all my date inputs are in column A, week in B, and month in C.
I found a formula from a forum in converting my date inputs to week number, and here is the formula in column B:
=IF(A40,"WEEK"&INT((A4+1-DATE(YEAR(A4),1,1))/7)+1,"")
- INT(bold) formula part, as those part I just copy paste it, add this and that, and it works
- the reason why I add the "+1" on the very last part is because on my weekly salary payment, every Saturday salary will be paid on the week after.
(ex: 04/28/12 is supposed to be WEEK17, but then I added +1 so it became WEEK18. The main reason is 04/28 is Saturday and like I said I need every Saturday salary to be paid on the week after)
So, I've got the solution to convert my date inputs to Week#, but then I also need this week# to be converted into "MONTH" in a way that the last day/s of any months, but still in the same week of the new month, to be grouped together.
- For an example, 04/28/12 is supposed to be considered as April month, but I need that day to be on the May month.
View 9 Replies
View Related
Mar 12, 2008
what is the equivalent command to WEEKNUM if I want to properly calculate Week # of Month?
For example (Sunday being the first day of the week):
January 5th 2008 = Week 1 of January
January 6th 2008 = Week 2 of January
February 2nd 2008 = Week 1 of February
February 3rd 2008 = Week 2 of February
WEEKNUM perfectly calculates this, but it is applicable for the whole year.
View 9 Replies
View Related
May 5, 2009
I have the following data by week:
------------------------------------------------------------------------
29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May
# of work days 4 4 4 4 5 5 5
Manpower 106 85 115 115 120 121 87
------------------------------------------------------------------------
On a second tab, I want to show the data by month:
----------------------------------------------------------------
Apr May Jun
# of workdays 21 (4+4+4+4+5) 21 20
Avg. manpower 108 104 ....
---------------------------------------------------------------
View 9 Replies
View Related
Oct 31, 2006
how to put this in
If the date in C3 = January 31 then do something.
I don't know how to put the date part in code.
View 5 Replies
View Related
May 30, 2014
I uploaded an example file.
Now, what I need to accomplish is that the D1 and D3's in sheet 2 need to result in a date next to the correct country (the date (in full) must be the first monday of the correct week). I find it quit difficult to do this because in sheet 2 you have once the country name, but several possible dates. So in sheet 1 there must be a date for every D1 or D3 but under each other.
The second problem is that I need to accomplish to get a "x" in sheet 3 under the correct month where there is an D1 or D3 in sheet 2 (week).
So I need to go from a week to a month and this can be for one country 1, 2, 3 or even more months (it depends from the D1 and D3's in sheet 2).
View 13 Replies
View Related
Feb 25, 2013
I currently am trying to refine some spreadsheets at work (hospital setting). The type of files im working with are medication sheets where on the left it states the medication and to the right of it, the cells have the days of the month(1-31) but I need them to change depending on the day they come into our facility. Above the numbers i would also like it to say the day of week with the first initial (M, T, W, T, F, S, S) in the cells are the top. It is something that we have to make for each day it it gets really annoying and is a waste of time moving the dates over for every day. find a way where I can open the file and the numbers and letters are all in the right place without having to change it for the day that the patients are coming in.
View 3 Replies
View Related
Jul 24, 2013
I have data for 6 monthsone column has all the dates
1/1/2013
1/2//2013
1/5/2013
1/8/2013
1/10/2013
1/15/2013
1/21/2013
1/31/2013
I have for 6 months like these dates
I need to convert all these dates to week 1- week 5
week 1: 1-7, week 2: 8-14, week3: 15-21, week4: 22-28, week5: 29-31
Instead of 1/1/2013 it should show week1 instead 1/10/2013 week2 like this
View 9 Replies
View Related
May 1, 2009
I have 15 projects which are currently been taken, i need to record how much time each staff member takes each week/ per month on the projects, so at the end of week 5 i require a total column, and i require a totals columns at the end of the data.
How can i lay this out cos i'm having trouble visualing the data for per month and per week?
View 9 Replies
View Related
May 7, 2009
I am trying to determine if a specific date is what week in a 4-4-5 accounting month. See attached file. Is there a formula that can be used to do this???
View 4 Replies
View Related
Apr 9, 2008
See attached spreadsheet. I have a set of Jobs with a set of end dates. A meeting date should be held after the end of each job. I need a formula or macro to determine when the meeting date will be held? The criteria to determine the meeting date is found in rows 12-18. The end dates are set on different days of the weeks and different weeks of the month depending on the region that the job is located in. The meeting dates will be input in colums d, f, h & j.
View 7 Replies