Graphing - Selecting Specified Time Period

Feb 13, 2010

I have sheet that is populated with data daily. I wish to create graphs from information contained within a table in this sheet where i can select the start date and end date of the graph possibly from a drop down menu. I will be creating multiple graphs and wish for them all to change when i select the time period.

View 9 Replies


ADVERTISEMENT

Graphing Time To A Sum Of Hits

Dec 1, 2006

I have a graph / time problem

I have a program that is spitting out raw data to me that I would like to be able to put into a graph form in a efficient manner, but I’m not sure the best way to accomplish this.

Here is what I’m working with:
I am getting a list of time date stamps that appear as follows.

11/30/2006 6:02:25 AM
11/30/2006 6:02:36 AM
11/30/2006 6:02:40 AM and so forth.

Each stamp represents a hit to a link.
What I would like to be able to do is graph the number of hits per hour verse the time of day hit. Showing the time on the x & the number of hits per that hour on the y axis.

I can convert the time to decimal, but I still need to find a way to get excel to graph the sum of hits per hour.

View 9 Replies View Related

Automatically Change Cell (With Time) Color After Time Period Has Passed

May 23, 2008

I have a protected worksheet. Users wish to be able to track changes in the input cells. The suggested approach for this is to temporarily disable sheet protection and allow them to change the font color, then protect afterwards. What I would like to do is:

i) check whether they are in an input cell
ii) if so, then prompt the user with the 'Font Color' dialog box
iii) apply the font color selected to the input cell

I'm struggling to find the dialog box I need. I can launch the one to change the interior color, no problem (Application.Dialogs(xlDialogPatterns).Show). But that's no use to me, I just want a color palette that specifically relates to the Font Color

View 4 Replies View Related

Count Number Of Full Time Periods Within A Time Period

Nov 18, 2008

I have thousands of timestamps that have a start & end date and time in 2 separate columns. (one named start and one named end...)

I also have numerous set time periods that i'm interested in.. (about a dozen or so)

for example 01/01/2008 - 05/01/2008, 07:30:00 - 10:00:00

What i need is to be able to count the number of times the full time period i am interested (07:30:00 - 10:00:00) in falls in between the thousands of start and end timestamps i have. The time periods must also fall within the date range specifed.

So if my timestamps were
Start: 01/01/2008 06:30:00 & End: 02/01/2008 11:00:00, based on the set time period above, there would be a count of 2

and if my timestamps were
Start: 01/01/2008 07:05:00 & End: 02/01/2008 09:00:00 there would be a count of zero as there is not a full uninterupted timeperiod 07:00:00 - 10:00:00 between these timestamps.

and if my timestamps were:
Start 01/01/2007 07:00:00 & End 02/01/2007 10:00:00 the count would be zer as this is a year early!

View 9 Replies View Related

Time Related Data Applied Over Time Period

Jul 10, 2014

I want to return a value based on once off time related data which is captured at 4 time periods throughout a day. I have another set of data which does not line up with this data but I want it to return the value closest earliest value.

Given this data:
27-6-14 3:00 12
27-6-14 7:00 18
27-6-14 11:00 19

If I have a time like 27-6-14 5:00 I want to return a value of 12 (Previous time). How would this be possible?

View 5 Replies View Related

How To Get The (average Or Sum) In A Limited Period Of Time

Jan 22, 2009

This code help me in typing the date and time in any cell of column (B) automatically just in case I enter somthing in any adjacent cell of column (A)

View 6 Replies View Related

Converting Time Period In Hours

Mar 2, 2006

How do I convert 7.30 hours into 7.21 (ie 7 hours 21min.) Note I do not wish
to use the standard hour:minute formatting.

View 11 Replies View Related

Calculating Time Across A 24 Hour Period

Nov 6, 2007

Calculate certain time increments for various work-shifts. I have a start time,finish time and increments of time across the spectrum of 24 hours. There are also multiple start time across the 24 hour period with some start times begining on one day and ending on the next day.

Example

In B5 Startime is 22:00
In C5 Finishtime is 06:30

In I3 increment begins at 00:00
In I4 increment ends at 00:30

The employee working the shift from 22:00 - 06:30 would fall into the time increment of 00:00 - 00:30 where another employee working a different shift (08:30 - 17:00) would not. I'm looking for a formula that would return a 1 in a cell if the employee fell into the 00:00 - 00:30 time increment and a 0 in a cell in the employee did not fall into the time increment.

View 11 Replies View Related

Determine Formula To Know Period Time?

Oct 9, 2011

I am trying to determine a formula to know a period time for example i started to test a unit at 10:20 am of 10/02/2011 and i would like to add 52 hours of test and i would like to know when and at what time will finish the test?

View 3 Replies View Related

Work Out The Value Of Cars Over A Period Of Time

Apr 9, 2008

I have a project where I have to work out the value of cars over a period of time.

The cars depreciate at 36.9% per year over a 5 year period and I can't work out for the life of me how to create a formula in excel that give me the values at the end of each year.

Each car costs £10000 and I need to know what the value of each car is at the end of each year

View 9 Replies View Related

Time Trial Period In My Spreadsheet

Jul 27, 2006

I've searched a few of the posts here about freebies in terms of adding a trial period to your spreadsheet. I'm just starting to get into VBA programming (beginnner), but I was wondering if anyone here could suggest actual programs or add-ins that I could buy that would allow me to create a trial version of my spreadsheet? either by allowing the user to use it for a few days or to allow the user to use it for a specifed # of times.

I'm willing to pay for this, but I can't afford those expensive Licensing/Copy protection programs....I need a simple solution in between $20 and $60....

View 9 Replies View Related

Highlighting Cells When A Period Of Time Has Passed?

Aug 20, 2014

If C2 = 21/06/14

I need F2 to highlight when 60 days have passed from the date entered in C2.

Would this work if placed in F2 =C2+60<TODAY()

No access to excel at the minute to try it

View 1 Replies View Related

Macro That Will Navigate To A Tab For Defined Period Of Time

Feb 26, 2014

I want to assign a macro to a button that will unhide a tab for about 10 seconds, then rehide it and navigate to another tab. How do you do timed commands?

View 4 Replies View Related

Automatically Close UserForm After Time Period

Feb 15, 2010

I have the following code in a simple userform containing only a label:


Private Declare Sub Sleep Lib "kernel32" (ByVal dwMilliseconds As Long)

Private Sub UserForm_Activate()
DoEvents
Sleep 4000
Unload Me
End Sub

When I invoke this as a single macro in a blank workbook and immediately change focus by pressing ALT+TAB to enter NotePad the userform is shown and exits normally after 4 seconds.

However, when I issue this code from within a larger macro, and hit ALT+TAB to Notepad, the excel application hangs on the displayed userform until I click back into Excel.

If required, I can happily send you the code as an attachment.

View 9 Replies View Related

Pivot Tables To Find Max Value In Time Period

Oct 8, 2006

I have a in field column M of my table that gives the week number of various dates within the table.

I would like to find the high value reached during each week based on the Highs which are located in column P, the highs consist if workdays during each week number.

I would like this to appear as a new calculated field entitled "Week High", I am assuming I need to input a custom formula to do this. I also want to create calculated fields for the the high reached during each year, the year is in column L

View 5 Replies View Related

Chart A Graph Of Jobs Over A Period Of Time

Jun 17, 2007

I have an Access database, with a table of jobs processed.

One column for Job ID (Unique), Date it was processed, By Who it was processed and Comments ascoiated.

I need to chart a graph of Jobs over a period of time. How many jobs done per date. In excel preferebly, I have programs like Database Plus for excel. And I am familiar with VBA. I can't figure out how to uniquely sort how many jobs for each date. As there are numerous job entries for on the same dates. I think it can be done with an SQL query or sorting it with VBA somehow. Any help will be greatly appreciated. Or can anyone suggest an application designed for charting with Access databases in Excel?

View 6 Replies View Related

Loop And Match Considering Location And Period Of Date And Time?

Jun 27, 2013

compare two lists of data in order to identify the possible matches considering date&time and the location stored in different columns as shown in the example file attached. The range of date and time for the comparison is one hour, but it can be changed...

View 4 Replies View Related

Calculating Data Within Past 24 Hour Time Period

Jun 7, 2014

I am a flight instructor and legally we cannot work more than 8 hours in any consecutive 24 hour period. I'm trying to create a spreadsheet that will calculate the totals from that 24 hour period for me.

Right now I have something that sort of works, but not the way I would like it. I have a column for "time" that has the date and ending time of the flight and I am using that as if the total flight occurred at one moment (the ending time).

So, for instance let's say I did these flights

1: 8AM-10AM (2 hours, clocked at 10AM)
2: 11AM - 2 PM (2 hours, clocked at 2PM)
3: 7AM-9AM the following day (2 hours, clocked at 9AM)

If I have my formula calculate the time for 9AM the following day (totaling the past 24 hours) the first flight won't be included in the calculation since the hours from that flight is only imputed at 10AM. The formula would read 4 hours rather than the (actual) 5 hours.

Here is my workbook : 8 hour calculator sample.xlsx

Here are the formulas I am using

The time is formulated at date and time, with time being the ending flight time

The start time for the calculation is

[Code]....

end time is just =NOW()

Total calculation is

[Code] .....

All I'm trying to do is use the totals under "flight start" and "flight end" instead of the end flight time I had to put in under the date column.

View 9 Replies View Related

Automatically Close If A User Is Inactive For A Period Of Time.

Nov 13, 2008

We have one shared excel workbook and it is used by many people (more than 20 simultaneously), is there any way to auto save & close the workbook (session) if a user is inactive for specified time.

View 2 Replies View Related

Timesheet: Calculate Time Within A Period When Crossing Midnight

May 14, 2009

I am creating a timesheet using excel 2003 users enter their shift start/finish time and a break start/finish time. Emplyee's can work night shifts (ie across midnight).

There are penalty rates which apply at different times. I need to be able to work out the amount of worked time that fits into a certain time period. eg. 10pm-7.30am, 7.30am-10pm.

I have a solution based on A clever formula from Daniel Maher that will calculate time within a period. But it doesn't work when the shift goes over two days.

I have attached a spreadsheet to help show the problem .......

View 12 Replies View Related

Calculate The Average Start Time For A Machine Over A Period?

Mar 6, 2014

I am trying to calculate the average start time for a machine over a period. However the machine start time varies from 10:00 pm to past midnight. I have tried reviewing past posts but cannot seem to find a similar query.

View 13 Replies View Related

Stop Macro Running After Specfied Time Period

Oct 17, 2007

I'm opening a workbook and then running the macro in the workbook. The problem is I would like to build a "timeout" feature if the macro is running too long (as some of the macro's this will run can take days to complete) but I don't know how to run the macro asynchronously. Also I need to know if i can get it to run asynchronous is there an event that will tell me when the process is finished. The calling application of the macro is written in VB6 and opening excel workbooks to run the macros out of. also the "timeout" feature must be done from the VB6 application it cannot be edited into the the workbooks containing the macro.

View 6 Replies View Related

Copy A Range To Another Sheet Adding All The Workdays For A Time Period

May 2, 2014

I have a small range that i need to copy to another sheet for each working day of a time period(01/01/2014-30/04/2014) excluding weekends and holidays, adding the date in the first column of the new sheet.

View 9 Replies View Related

Date Calculation Formula - Determine Longer Period Of Time

Aug 9, 2012

How to create a formula to determine the longer period of time between two date calculations and enter the longer period of time in the cell.

My Spreadsheet:
Cell M2: Birthdate (entered in cell as 11/1/2004)
Cell J2: Last date of service (entered in cell as 10/31/2011)
Cell G2: Calculation to enter the longer period of time between (M2 (year) + 21) and (J2 (year) + 7)

Example using information from above:
2004 + 21 = 2025
2011 + 7 = 2018
2025 is the result I want added to G2

If there is any way to include the month/year in G2 that would be ideal.

View 6 Replies View Related

Creating Line Graph - Gradual Rises And Falls In Profit Over A Period Of Time

May 27, 2014

I am trying to make a line graph showing the gradual rises and falls in profit over a period of time, when I use the data and click line graph normally, it will plot each bit of data individually rather than gradually, for example;

13-Sep-13GBP 1,107.57
18-Sep-13GBP 6,432.74
21-Sep-13-GBP 477.71
22-Sep-13GBP 19,664.65
23-Sep-13GBP 1,604.88

If I tried to plot the above data, the graph will not show a gradual rise but instead will show a value of £1604.88 on the 23rd of September when instead I would want the chart line to be at £29,287.55 (The total).

View 5 Replies View Related

Calculate Future Dates From Start Date With Varying Time Period/cycle

Sep 11, 2009

I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.

For example:

I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.

I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.

I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).

View 14 Replies View Related

Excel 2003 :: Time Card / Sheet For Semi-monthly Pay Period With Overtime Calculation

Nov 19, 2012

I'm working on a dynamic payroll spreadsheet that will automatically calculate the overtime worked in a week. Right now, I'm running into a snag. My issue is with the formula in Column R. Right now, as shown below, it is doing the calculation based on regular hours minus 40 to determine the OT time. The snag is very messy and it lay in this: while the row by row calculations for total overtime worked for the week is correct, the sum at the bottom is very much off. I need an accurate method to sum the hours of overtime for the given column.

Here are the guidelines for the pay periods and overtime:

1. The pay periods for the month go from the 1st to the 15th and the 16th to EOM (End of Month). This means that the pay period could end on any given day of the week. More on this in a moment.

2. A work week is defined as Sunday to Saturday.

3. Overtime is calculated based on the rule of anything over 40 hours in a given work week.

4. Holiday hours worked do not count towards the 40 hour mark in granting overtime since Holiday pay is automatically overtime.

If it were just a matter of a bi-weekly (every 2 weeks) pay period, I would simply state =IF(weekday(DATE)=7,Hours_Worked - 40,0), and tag a SUM(range) at the bottom. Unfortunately, with it being a semi-monthly (twice a month), the end of the pay period could be a Wednesday, so a reference to day of the week won't work unless the formula can dynamically determine which set of data to evaluate.

I'm completely willing to toss out the current method of determining overtime. This is the calculations sheet that references a cleanly formatted and designed time card on a tab called "Time Card", so this isn't the full workbook. In fact, once the whole thing is done, this calculation sheet will be hidden.

Columns M and N (which are formula referenced in Column P) are basic End - Start calculations and were hidden to simplify the display as well as the number of formulas displayed.

Column L (formula referenced) is a Yes/No display for if the date in question is holiday pay.

Excel 2003
H
I
O
P
Q
R
S

1
Start Work
Time Out
Day Count

[code].....

View 3 Replies View Related

Selecting All Named Ranges At Same Time

Oct 31, 2009

does anyone have any suggestions for selecting (highlighting) all the named ranges on a sheet?

View 9 Replies View Related

Selecting And Copying Specific Time Stamps

Dec 5, 2009

I have a output file that is collected time stamped data. How do I select the rows of the first time stamped collection. So, if the first row is stamp with 03-Jan-2009 23:59:00, I want to copy all the rows with that time stamp below the first row and stop when the time stamp starts at 03-Jan-2009 00:00:00. Attached is my sample sheet.

View 4 Replies View Related

Run Time Error 7: Out Of Memory. Selecting Shapes To Delete

May 24, 2005

i have a macro which is executing some cleaning up and then copying information from project sheets to a summary sheet. the individual project sheets are (currently still manually) copied/moved into the big(ger) overview workbook. to support the work with the individual project sheets they contain a macro that is assigned to some (three) shapes. one part of the cleanup is stripping the macros off the individual project sheets:

' remove the traffic-light macros of the project sheets from all sheets in case of unwanted or uncontrolled "infection"
For CurrentWS = 1 To SheetCount
Worksheets(CurrentWS).Select
ActiveSheet.Shapes.SelectAll
Selection.OnAction = ""
Worksheets(CurrentWS). Range("A1").Select
Next CurrentWS

on the line "ActiveSheet.Shapes.SelectAll" i get frequently (not always... ) a run time error '7': out of memory. it happens on at least two computers. i closed all other SW. according to the windows task manager information there should be plenty of memory free.

questions:
- how to get rid of the error message? OR:
- is there another (more smart) way to strip the ("imported") macros, while keeping the "main" marco alive that does not lead to an error message?

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved