How To Place And Define Progress Bar With Percentage

May 26, 2014

My VBA code will copy and paste several workbooks into master list.

the cells to be pasted will be starting on cells(13,9) until cells(13,501) or Range("I13:SG13")

while the max row will be determined by Cells(Rows.Count, "F").End(xlUp).Row

Here is the progress bar code I found in internet, maxrow/column has been changed to my requirement but how to place my VBA code to this script? the one highlighted in red, I guess it

[Code] .....

View 14 Replies


ADVERTISEMENT

How To Place VBA Code In Progress Bar With Percentage

May 26, 2014

My VBA code will copy and paste several workbooks into master list. The cells to be pasted will be starting on cells(13,9) until cells(13,501) or Range("I13:SG13"). While the max row will be determined by Cells(Rows.Count, "F").End(xlUp).Row

Here is the progress bar code I found in internet, maxrow/column has been changed to my requirement but how to place my VBA code to this script? the one highlighted in red, I guess it

Code:
Sub ShowProgressInStatus()
Dim Percent As Integer
Dim PercentComplete As Single
Dim MaxRow, MaxCol As Integer
MaxRow = Cells(Rows.Count, "F").End(xlUp).Row
MaxCol = 501

[code]....

View 9 Replies View Related

Status Bar Progress Percentage

Jan 3, 2007

I have a macro that calls the Calculate event. My problem is that the workbook is rather big and so the calculate takes some time. The user cant see the Status bar as I am working in full screen mode and useing Userforms that fill the entire screen.

I want to be able to display the progress (eg: Calculateing 35%) to the user.

Is there any way that a macro can "read" this info from the statusbar or from somewhere else?

View 9 Replies View Related

Show Progress With Graph Bar With Percentage Input

Jul 31, 2014

I would like to know how to input 10% 25% ect then in another cell the graph bar growing till 100% mark is completed.

View 6 Replies View Related

Progress Bar To Show Both Percentage Completion And Time Left?

May 28, 2014

How to show progress bar for both percentage completion and time left.

The code below is already created with percentage completion. Just to add time left.

[Code] ........

View 6 Replies View Related

Define Percentage Based On Value Range?

Nov 27, 2013

I need to be able to work out a percentage based on a value range. ie.

Cell D2 to D5 will define the percentages (so I can adjust it and play)

D2 = 18%
D3 = 15%
D4 = 13%
D5 = 10%

I need to work out:

If the value in cell A10 is between 11 and 200 calculate on D2, if between 201 - 500 calculate on D3, if between 501 - 2000 calculate on D4 ect ect

Cells A10 to A100 will have some figures put in them.I then want to calculate the %value used based on weather the figure in one of the A10 to A100 cells falls in a range. The data being put into the cells in column A will vary from report to report.

I'm trying to automate the calculations :

View 6 Replies View Related

Progress Bar: Use A Msgbox As A Progress Indicator For A Routine In An Application

Mar 16, 2009

I want to use a msgbox as a progress indicator for a routine in an application. I cant figure out how to do this.

View 5 Replies View Related

Set The Progress Bar Which Should Indicate The Progress Of The Data Loading?

Mar 28, 2014

Im consolidating datas from muliple excel files to single data base excel file.Am having macro and it is working fine for me.But when am loading data to data base file the excel files are vibrating.To avoid this issue i want to Set the progress bar which should indicate the progress of the data loading.

View 12 Replies View Related

Macro To Copy And Place Data To Specific Place

Feb 22, 2007

I am after a macro to do the following, my visual basic skills are very limited (non existant):- Look at the date in cell A1 on Sheet 'Live Report' and err 'remember it' Copy a range of cells from A3 to A10 on 'Live Report' Go to sheet 'Monthly Summary' and find the date that had been remembered previously (this date will be in column A on 'Monthly Summary' which will probably be a mixture of values and formulas). After the date has been found paste special and transpose the 'values only' copied range from 'Live Report' (A3 to A10) in column B on 'Monthly Summary' next to the date that has been found in Column A.

View 2 Replies View Related

Fill In The 3 Criteria Fields, Calculate The Result, Copy The Result, And Place It Into The Correct Place On The Table

Oct 19, 2006

I have a macro that imputs data from an external database and puts it into a temporary worksheet. This data has 3 columns (ID, Date, Amount). I am then making another sheet which has X number of tables (one for each ID), with the years being the column headings, and months being the row headings. ie.

| ID X
| +------+------+------+--->
| | 1999 | 2000 | 2001 |
+------+------+------+------+--->
| Jan | $100 | $250 | $300 |
+------+------+------+------+--->
| Feb | $200 | $300 | $200 |
+------+------+------+------+--->
| Mar | $300 | $250 | $100 |
+------+------+------+------+--->
| Sum | $600 | $800 | $600 |
| +------+------+------+--->

| ID Y
| +------+------+------+--->
| | 1999 | 2000 | 2001 |
+------+------+------+------+--->
| Jan | $100 | $250 | $300 |
+------+------+------+------+--->
| Feb | $200 | $300 | $200 |
+------+------+------+------+--->
| Mar | $300 | $250 | $100 |
+------+------+------+------+--->
| Sum | $600 | $800 | $600 |
| +------+------+------+--->

Currently I have a few hidden fields for the DSUM Criteria. I start making the tables. And then filling in table based off of the month and year. Doing so I need 3 criteria:
>= First Day of the Month
<= Last Day of the Month
= ID #

The problem is it takes Excel too long to fill in the 3 criteria fields, calculate the result, copy the result, and place it into the correct place on the table. Is there another way to get this data into the correct tables faster? Instead of using DSUM?

View 8 Replies View Related

Conditional Formatting Based On Percentage And Insert Cell Based On Percentage

Apr 3, 2013

I have a workbook that I've built for a project. I've attached a sample workbook. What I'm trying to do, for the entire sheet or workbook if possible, is turn any Cell with a percentage of 30% to 49% yellow and any cell with a percentage of 50% or more Red. I would also like to move the ID's of the variable cells, for example Id number 9922, to the cells beside the description of the rows, Affected would be an example, if the information contained in the same row as the ID meets with a set of variables.

For example I only want the ID's moved if they correspond with IDsub 1-25. One more thing, the people who will be using this spreadsheet will be copying data from a website when it is imported it does not insert the values as numbers. I would like to format the cells, in example workbook they would be any of the cells labeled ID IDsub Variable or Number, so that anything put in that cell will automatically be converted to a number.

I should also probably add that the formatting will be done on approximately 80 rows a sheet with 47 sheets.

View 2 Replies View Related

Progress Bar In Userform

Jun 25, 2014

I would like to have a progress bar in some of my userforms.

As an example I attach a sample. progress bar.xlsm‎

View 8 Replies View Related

Status Bar As Progress Bar

Apr 29, 2009

Im forgetting how to code something for this ....

View 7 Replies View Related

Progress Tax Calculator

Jun 19, 2006

I'm trying to come up with an efficient formulae or function to calculate tax

The problem I have is that the tax is progressive. As below

the first 20,000 is taxed at 5%
the next 20,000 is taxed at 6%
the next 20,000 is taxed at 7%
the next 20,000 is taxed at 8%
the next 20,000 is taxed at 9%
more than 100,000 is taxed at 10%

I'm trying to do a formula like below

Cell B3 is my taxable amount
Cell B5 =IF(B$3>20000,20000*0.05,B$3*0.05)
Cell B6 =IF(B$3>40000,40000*0.05,(B$3-20000)*0.05)

This gives me a problem in that for 35k say, I end up with a negative number for the second part in cell B6. My other issue is that each calculation will take up 6 rows on my
spreadsheet. I was hoping to set up a function that could do this in a cell, but even the simple stage defeats me at the moment.

View 12 Replies View Related

Progress Bar Code In VBA

Dec 22, 2011

I struggling in progress bar code, Once userForm.show code executes code execution stops, Once if i close the userform at runtime step wise code continues from next line in this case i mean UserForm.ProgressBar1.Min = 0

Sub test()
UserForm.Show
UserForm.ProgressBar1.Min = 0
UserForm.ProgressBar1.Max = 100

[Code]....

View 3 Replies View Related

Dick's Progress Bar

Nov 13, 2007

There is a nice progress bar at

http://www.dailydoseofexcel.com/arch...-and-controls/

Sub DoStuff()

Dim ufUpdate As UUpdate
Dim dtTime As Date

'instantiate the userform
Set ufUpdate = New UUpdate
ufUpdate.lbxStatus.AddItem "Starting Process..."
ufUpdate.lbxStatus.AddItem "Do the next thing..."
ufUpdate.lbxStatus.AddItem "Done!"
ufUpdate.Show....................

View 9 Replies View Related

Incremental Progress Bar

Apr 20, 2006

I have a code that has a loop with up to 100,000 possible iterations. The max number of iterations, N, is variable and to be specified by the user via user form.

That's why I like to show only incremental progress , say 5% competed , 10% completed ,... , so on. What is the best way to code it?

Another question: I tried to show it via

Application.StatusBar = Format(PctDone, "#.##%") & " completed"

but for some reason it does not get updated while the code is running. Is that because the user form is visible? For now, I'm trying to add a label progress bar to the user form, but StatusBar would suffice.

View 5 Replies View Related

Progress Bar Macro

Jul 1, 2007

I'm using a mostly recorded macro to do some rather lengthy formatting in a workbook. The formatting is lengthy enough that I don't want people to think the PC is hung. So I'd like to use the progress bar. I'm trying to trim the code down to just the bare essentials for running the progress bar during the macro procedure (and so I can better understand what's happening in the code). The attachment shows what I've done so far. When I press the "Format Workbook" button then I have to press another button ("Run Progress Meter") to really launch the progress bar.

View 5 Replies View Related

Progress Bar In Code

Oct 20, 2007

I am using the following code to activate a progress bar.

Private Sub UserForm_Activate()

Dim dTime As Date
Dim i, t As Integer
For i = 1 To 100 Step 100 / 8
dTime = Now + TimeValue("0:00:01")
Application.Wait TimeValue(dTime)
ProgressBar1.Value = i
Next i
End Sub

This works fine and the progress bar moves in 8 steps.

However, I want to include this into a module of code and it moves along according to how far down the module my code is running.

View 3 Replies View Related

Vertical Progress Bar

Mar 26, 2008

I want to be able to have a progressbar that populates upwards. When I use a scrollbar to adjust the height it wants to go down.

View 2 Replies View Related

Merge VBA Macros For Progress Bar?

Nov 14, 2012

I have 2 macros ready and i need to merge it to one to make it run.

First macros will do the calculation and the other is adopted from a website as an sample to display % of process. Now the issue is i don't know how to merge it. Can any one help me to setup this file please. Copy of sample file is attached for your reference.

Calculation Macros:

VB:
Sub Premium()
Dim ws As Worksheet, ws1 As Worksheet, ws2 As Worksheet
Dim cel As Range, cel2 As Range, cel3 As Range, cel4 As Range, found As Range, rng As Range, age As Variant

[Code]....

View 2 Replies View Related

Progress Bar For Loading Userform?

Jun 21, 2014

I have created a Excel userform. Since it has lot of controls, it takes good amount of time to load.

Is there a possibility of displaying a progress bar till the userform is loaded.

Google search has shown me ways to create a progress bar using Excel Forms. However, I am looking for a way to show the progress bar till the main userform is loaded.

View 9 Replies View Related

Moving Progress Bar From Bottom To Top?

Jul 8, 2014

I want to create a progress bar that will show how much percent is completed from bottom to top. It should count total total number of cases in the table. suppose they are 280 then it should show 0 to 280 in a label. 0 at the bottom and 280 at the top. then count how many cases have been completed as a percentage going up when percentage is increasing.

View 14 Replies View Related

Progress Bar While Macro Is Running?

Mar 10, 2014

I have a macro that takes about a minute to run. I would like to add a progress bar to appear once the macro starts running. There are no loops in the macro. What are my options?

View 3 Replies View Related

How To Make Vertical Progress Bar

Mar 26, 2014

I use this code below to run horizontal progress bar. is there any code how to make Vertical Progress Bar,?

[Code] .....

View 3 Replies View Related

Adding A Progress Bar To Vba Code

Feb 20, 2010

How would I add a nice progress bar to the following

View 14 Replies View Related

Progress Bar Capturing Entries?

Feb 13, 2012

I have a worksheet which counts the entries of some orders via a barcode scanner.

What i would like to have is a progress bar showing graphically the percentage of completion of the progress.

For example in an 8 hour shift , 120 orders should be completed ideally.

The progress bar should show the actual status based on time and entries.

If the orders are processed on time the progress bar is green otherwise is red.

View 2 Replies View Related

Display As Counter With A Progress Bar

Jul 23, 2012

I have in cell A1, as display, a value [500]. This display is calculated in cell B1 [=200+300], here I may change the values. To draw attention, I want the display [500] to continuously start from 100 to 500 [like a counter where it stops at 500 and starts again from 100]. This display will be idle if the value is under 250.

It would be more lively if a progress bar is shown; maybe using the REPT function [REPT("I",50)] where the "I" starts over again and again after the 50th times is reached.

View 1 Replies View Related

Display A Progress Bar Using A The Userform

May 31, 2007

The code I'm trying to execute is given below

Public Sub datafill()

Sheets("Bloomberg Data and Formula").Activate

' Creates prompt to input date to be checked

Dim InputAnswer As Date

InputAnswer = InputBox( _
prompt:="Enter NAV date for verification against Bloomberg in the format DD/MM/YYYY", _
Title:="Date Input Screen", _
Default:="DD/MM/YYY")

Range("C1").Value = InputAnswer

' Clear out previous day's data

Range("A6 : Z6").Select
Range(Selection, Selection.End(xlDown)).Select
Selection.ClearContents
Range("A6").Select

View 9 Replies View Related

Userform Progress Bar Not Updating

Sep 1, 2008

I have some code that runs in conjunction with a userform progressbar....

I launch my progress userform like this from a userform commandbutton:

Load UserForm6
UserForm6.Show
(I suspect the load command may not be needed....)

Then when my progress userform launches:

Private Sub UserForm_Initialize()
Call UpdateTasksAll
End Sub
Then my macro:

UserForm6.Label1.Width = 0
UserForm6.Frame1.Caption = "0%"
DoEvents

If UserForm4.TextBox1.Text = "" Then GoTo 4
OL_TK_Crit = UserForm4.Label24.Caption & " " & UserForm4.Label23.Caption & " " & UserForm4.Label38.Caption & " " & UserForm4.Label3.Caption 'your task subject to be updated

The problem is that while the code is running, my userform refuses to show it's face, and only appears when the macro has finished! I get this quite frequently, and cant fathom the cause

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved