Jul 31, 2014I would like to know how to input 10% 25% ect then in another cell the graph bar growing till 100% mark is completed.
View 6 RepliesI would like to know how to input 10% 25% ect then in another cell the graph bar growing till 100% mark is completed.
View 6 RepliesHow to show progress bar for both percentage completion and time left.
The code below is already created with percentage completion. Just to add time left.
[Code] ........
I have a macro that calls the Calculate event. My problem is that the workbook is rather big and so the calculate takes some time. The user cant see the Status bar as I am working in full screen mode and useing Userforms that fill the entire screen.
I want to be able to display the progress (eg: Calculateing 35%) to the user.
Is there any way that a macro can "read" this info from the statusbar or from somewhere else?
My VBA code will copy and paste several workbooks into master list.
the cells to be pasted will be starting on cells(13,9) until cells(13,501) or Range("I13:SG13")
while the max row will be determined by Cells(Rows.Count, "F").End(xlUp).Row
Here is the progress bar code I found in internet, maxrow/column has been changed to my requirement but how to place my VBA code to this script? the one highlighted in red, I guess it
[Code] .....
My VBA code will copy and paste several workbooks into master list. The cells to be pasted will be starting on cells(13,9) until cells(13,501) or Range("I13:SG13"). While the max row will be determined by Cells(Rows.Count, "F").End(xlUp).Row
Here is the progress bar code I found in internet, maxrow/column has been changed to my requirement but how to place my VBA code to this script? the one highlighted in red, I guess it
Code:
Sub ShowProgressInStatus()
Dim Percent As Integer
Dim PercentComplete As Single
Dim MaxRow, MaxCol As Integer
MaxRow = Cells(Rows.Count, "F").End(xlUp).Row
MaxCol = 501
[code]....
I want to put progress indicator for data input in Excel.
The data input is in cell A1 until A10, and B1 until B10.
So, I need two progress indicator (for cell A & B).
As i have a pretty "complex" macro, which takes around 20-30 minutes to do (honestly)....
I was wondering if there was a way to create a progress bar just showing me how many % it has done so for?
Or even tell me which sub routine it is up to? (but % would probably be better)
And preferably a pop-up box one?.. not one on the status bar because i have stuff updated on the status bar already...
I am trying to make a Progress bar with a statment using a Userform with a label saying Please wait. I call the form using UserForm1.Show vbModeless.The form shows and functions as needed but the label with the caption please wait is not visible. how to get the label to show?
View 1 Replies View RelatedIs possible show the "real" Excel's Progress Bar on a External Form?
I send some commands to Excel.
Some are slow and Excel's progress bar run.
But, before, i hide (Application.Visible = False) Excel, then i need to show on my form that progress bar.
Or if i can get value from that progressbar should be useful too.
i want to know how to show the progress of code exceuted in an excel sheet. like when we download a file from web or server it shows the staus of the file transfer.
View 2 Replies View RelatedI have a VBA code that copy data from multiple files into my workbook.
I find the first file, copy the ranges I need into my workbook and continue to the next file until all files are done.
The copy operation in each file is - row by row - because I need to ask questions about each row.
As you understand - what the user sees is a flickering window because I activate the source workbbok -> copy the data -> activate this workbook-> paste the data.
I want to avoid the flickering.
An acceptable solution could be to generate a pop up message box that will say "data is being copied. Pleasd wait while operation is completed". BUT - I don't know how to identify that the action is done and message box can be closed.
is it possible to show progress indicator if macro execution take some considerable time say more than 10 seconds?
View 2 Replies View Related when you open up the file please ignore everything above the blue bar. That was the old data which was arranged wrong. I have actually figured a lot of this out but i am stuck. The graph is set up so when you click on the drop down menu (F26) it changes the graph to the relevant data. Now the bottom graph is currently graphing the Months Expense1 as a total of all Expense1. So January Expense1 was $100 so its 26% of all Expense1. and when you click on the drop down button you can changed the data to Expense2 and the graph changes. YAY ok thats cool. However, thats not what i want. I want the pie chart to be graphing the expenses as a percentage of total Expenses. So the drop down menu would be of the months instead of the expenses.
I have changed that with relative ease, but I cant get the data to graph how i want it to.
I have been using OFFSET() formula and the define name manager to set up the previous graph. You can easily look at the formulas i have used instead of me trying to explain everything. Please help. This is the test bed for a budgeting spread sheet I am working on.
if you can help me out that would be great.. Please try not to use Macros because i dont understand them all that well and I need to take what is done in this spreadsheet and learn from it and change it so it works when are thre 10 expenses.
I want to use a msgbox as a progress indicator for a routine in an application. I cant figure out how to do this.
View 5 Replies View RelatedI know that to show a tab in VBA you can write worksheet("NameOfTheTab").select
However, it does not work when the tab is just graph.
I have a spreadsheet that shows when individuals completed different events. The events are on top and the names are down the side. There are dates in the middle. I would like to know if it's possible to show a percentage of dates that are current- so take the number of fields with current dates and divide them by total number of fields. I would also like to find a percentag of events complete by each individual.
View 5 Replies View RelatedOn the attached sheet in column X, I am trying to input the Allocation percentage dependent on a number of variables:
Type (Bar, Blank, Coil, Sheet, Special)
Sub Fam Code (2A02, BC02-05, BC99, BZ99)
Sup Category (Arcelor, Independent, Tata/ Corus)
The allocation percentage is based on the below; anything outside of this should result in "Other".
Sheet (BC02/03/04) A=40%, T=40% & I=20%
Coil (BC02 & BC03) A=40%, T=40% & I=20%
Coil (BC04) A=30%, T=50% & I=20%
Example 1:
Type - Sheet & Coil
Sup Category - Independent
Result 20%
Example 2:
Type - Coil
Sup Category - Tata/ Corus
Sub Fam Code - BC04
Result 50%
Example 3:
Type - Coil
Sup Category - Arcelor
Sub Fam Code - BC04
Result 30%
I am a Safety representative and on a monthly basis I have to check for seat belt usage. I can not, for the life of me, figure this out.
I have attached an example. In the example out of 22 vehicles there were 2 individuals not wearing seat belts. So cell J4 should be 91%
I can calculate % not wearing with [=sum(D4:E4,H4:I4)/SUM(B4:I4)]
but I want to show % wearing.
I have a spreadsheet which has a number of columns populated with a day number and below each day number there are some numbers. What I would like to do is to compare the values for Day1 with Day2, Day 2 with Day 3 etc. Is there a smart way to do this using VBA? I am enclosing an example to show what I would like the macro to do.
View 8 Replies View Relatedi am having a hard time in my microsoft excel class
for the life of me i cannot think of a formula to answer the question below
every time i type in =(c3)-25-80% i get the wrong answer
i know there has to be a different formula
Cost of visit= $113.00
Q=Your have a co-payment of $25.00 and the insurance will pay 80% of the remaining cost. Create a formula for the visit that will calculate the total amount you will have to pay.
I am creating a line graph to display changes in Cost Per Unit (CPU) of a given item over time.
The issue I have is that the CPU data on the line graph is displayed as 0 values where data is yet to be inputted. Instead I want the graph to remain blank where no data has yet been added. How can this be done?
find attached a simplified mock up of the spreadsheet.
Constant (fixed) values are:
- Date
- Hourly Rate
Values inputted on a daily basis are:
- Hours Worked
- Volume Picked
Calculated values are:
- Total Cost
- Cost Per Unit
- Mean [=average(CPU)]
- UWL [=mean+(2*stdev(CPU))]
- UAL [=mean+(3*stdev(CPU))]
I'm open to using VBA if necessary, however as I will not be the only user of this workbook when it is complete I would prefer to keep it a simple as possible.
I have a data set consisting of three columns. Column A is a name, B is an x-axis value, and C is an y-axis value.
I use the B and C column to plot the positions in an X/Y point diagram. This is working nicely. But is there a way for me to get the value in the A column as the label for the data? Or in some other way shown with mouse over or similar?
Dataset could look like:
A
B
C
Jensen1
14
150
[Code] .......
X-Axis = Week1:Week13
Y-Axis =Revenue for each week.
I have a line graph. If "Week9:Week13" have no value, my graphs line drops to 0. How do I make my line graph show no value when no value is inputed for "Week9:Week13"? I think I need to incorporate the =NA() in the original formula but I'm not sure how to do this.
I am trying to add 2 cell values together then show the total as a % of a value in a 3rd cell, however I also need it to allow for 0 values in the chosen cells without displaying an error message or it messes up the average formula elsewhere on the sheet?
View 2 Replies View RelatedI am trying to calculate a percentage complete based on what a cells color is, the function must count the cells of a certain color (signifying in this case that something is complete for a particular "area") and distinguish that from cells in the same data range that aren't colored and calculate the percentage that are complete.
View 3 Replies View RelatedDoes anyone know a setting to display pivot tables as a % of sub total automatically within the Pivot Table Settings? I have recreated a formula on the cells H:K of what I am looking for. see Attached.
View 2 Replies View RelatedI have a rather large report full of data, 10+ columns contain a RANKING column, and these ranks, 1-10, are assigned by a % bracket:
1-20% = 1
21-40% = 2
41-60% = 3
61-80% = 4
81-100% = 5
101-120% = 6
121-140% = 7
141-160% = 8
161-180% = 9
181-200% = 10
There are several hundred rows in each column that all need individual ranks. My first thought is to program a if then else statement for 1 to 10 with a % limit range, but this isnt feasable as i would have to program a separate if statement for each of the many hundred rows, or do one heck of a fancy loop that i just cant contemplate (as the rows are split and sepperated... no solid uniform place for the data to be plugged.) What is the best way to go about this? I'm at a total loss of ideas with my knowledge of excel.
Im consolidating datas from muliple excel files to single data base excel file.Am having macro and it is working fine for me.But when am loading data to data base file the excel files are vibrating.To avoid this issue i want to Set the progress bar which should indicate the progress of the data loading.
View 12 Replies View RelatedLooking for a formula to show percentage increase of a figure.
Cell A1 is £45,000
Cell A2 is £51,000
Cell A3 ANSWER result shown as a percentage increase.
Is there a way to show the Vertical axis on both right and left side of the graph or at least on the Right hand side?