Macro For Progress Bar In Status Bar As A Percent Of Time
Jun 26, 2014
I have been looking for a macro (and have failed to find one) that would give a progress bar in status bar as a percent of the macro run time, e.g
If I had a macro that took say 5 minutes (which I would know in advance) to run is there a way to have a progress bar in status bar that would progress incrementally as a percentage of the 5 minutes or even simpler break the 5 minutes into 1 minute increments?
View 2 Replies
ADVERTISEMENT
Apr 29, 2009
Im forgetting how to code something for this ....
View 7 Replies
View Related
Jan 3, 2007
I have a macro that calls the Calculate event. My problem is that the workbook is rather big and so the calculate takes some time. The user cant see the Status bar as I am working in full screen mode and useing Userforms that fill the entire screen.
I want to be able to display the progress (eg: Calculateing 35%) to the user.
Is there any way that a macro can "read" this info from the statusbar or from somewhere else?
View 9 Replies
View Related
Nov 4, 2011
I have a macro that takes quite some time to run, 3-4 minutes is it possible to have a % progress indicator in the status bar to let me know how much of the process has been completed so far?
View 5 Replies
View Related
May 3, 2013
I have a query around dates and current project status.
I1 Contains the Current Date
C4 Contains Due Date
C5 Contains 4 Possible Selections. Not Started, In Progress, Awaiting Feedback,
Complete
What I want the formula to do is.
IF Current Date is greater than Due Date AND Current Status is either Not Started or In Progress then return Overdue.
I've written it as follows, but it doesn't seem to work?
=IF(I1>C4,IF((C5="Not Started",IF(C5="In Progress"),"Overdue",""),""))
View 2 Replies
View Related
Dec 2, 2008
I have a macro that is taking a long time, so long that I think something is wrong but I dont really have a great way to check. I want to put up a little window showing the progress either by saying "i'm on row XX" or having a progress bar.
Looks like msgbox requires action before the code continues so it is not a good thing to use if you want to get progress. My formula looks for bad values in a data file and fixed them. It takes forever. I would like to have a box there that simply tells me what row it is working on.
Clearly I dont want to hit the OK button for it to continue processing. I want it to update the message box on its own and then take away the message box when it is finished processing.
View 8 Replies
View Related
Jun 7, 2007
is it possible to show progress indicator if macro execution take some considerable time say more than 10 seconds?
View 2 Replies
View Related
Sep 12, 2012
I have a percent 3.14%, that I want to show 15, 20 and 25% above and below that percent. I am showing below the results and then formula. The top calculation results in the same on both the left and right. However the -15,-20, -25% results are different. Which is correct.
3.14%
20% +/-
3.14%
0.63%
or
6.28%
1.57%
2.51%
[code].....
basic math, but I don't understand why the results are different.
View 3 Replies
View Related
May 28, 2014
How to show progress bar for both percentage completion and time left.
The code below is already created with percentage completion. Just to add time left.
[Code] ........
View 6 Replies
View Related
Aug 16, 2012
I have a macro that runs through about 40,000 records which can be quite time consuming. I currently have a status bar that shows the percent of work complete, but I'd like to add something that shows an estimate of how much time is remaining and how much time has passed. Below is the first loop in my code that uses the progress bar. You'll see that I modified the progress bar to include "Label 2" which shows the current record of the total record count, I'd like to add "Label 3" to show something like "2:30 elapsed, 1:15 remaining".
I'm using Excel 2010 on Windows 7 (64 bit).
HTML Code:
Sub IdentifyGS()
POData.Activate
For CurrentRow = 2 To LastRow
[Code] .......
View 9 Replies
View Related
Mar 16, 2009
I want to use a msgbox as a progress indicator for a routine in an application. I cant figure out how to do this.
View 5 Replies
View Related
May 12, 2014
I have some vba code that currently copies a status table out of a worksheet, into a temp file for an email. The status table in excel has a column D which can have different status. I want to select everything in the table except rows that are 'Descoped'. Currently my code looks like:
Set rng2 = Sheets("Execution Status").Range("B2:F420")
This picks up everything without looking at the status. I want to change it so it doesn't pick up the rows where Column D contains 'Descoped'.
In pseudo code I would describe it as:
Set rng2 = Sheets("Execution Status").Range("B2:F420") where value in D5:D420 is not equal to 'Descoped'.
I have tried:
Set rng2 = Sheets("Execution Status").Range("B2:F420").Value "Descoped" and nothing gets selected.
View 1 Replies
View Related
Mar 28, 2014
Im consolidating datas from muliple excel files to single data base excel file.Am having macro and it is working fine for me.But when am loading data to data base file the excel files are vibrating.To avoid this issue i want to Set the progress bar which should indicate the progress of the data loading.
View 12 Replies
View Related
Jul 1, 2007
I'm using a mostly recorded macro to do some rather lengthy formatting in a workbook. The formatting is lengthy enough that I don't want people to think the PC is hung. So I'd like to use the progress bar. I'm trying to trim the code down to just the bare essentials for running the progress bar during the macro procedure (and so I can better understand what's happening in the code). The attachment shows what I've done so far. When I press the "Format Workbook" button then I have to press another button ("Run Progress Meter") to really launch the progress bar.
View 5 Replies
View Related
Mar 10, 2014
I have a macro that takes about a minute to run. I would like to add a progress bar to appear once the macro starts running. There are no loops in the macro. What are my options?
View 3 Replies
View Related
Aug 28, 2007
I have a macro that runs when the file is opened and takes some time. I turn off the screen updating to speed the process. I want a msgbox, or something, to tell users that file is processing information that does not require a response to continue the code.
View 8 Replies
View Related
Apr 1, 2008
I am getting compile error for following code saying sub or function not defined with updateProgress getting highlighted
UserForm2.LabelProgress.Width = 0
UserForm2.Show vbModeless
MsgBox "get_blades (lookinname)"
UpdateProgress 0.25 ' 25%
Range("T3").Select
MsgBox "sort_data"
UpdateProgress 0.5 ' 50%
MsgBox "Get_Nom"
UpdateProgress 0.75 ' 75%
Range("a2").Select
MsgBox "get_info"
UpdateProgress 1 ' 100%
Worksheets("sheet2").Activate
Range("a1").Select
Unload UserForm2
View 2 Replies
View Related
Aug 12, 2008
I'm running a simulation that utilizes the Data Table function. The table itself is quite large (280 elements in the row, 10K in the column). It currently takes about an hour to run. (Full disclosure: I did this instead of a couple of "for" loops because I have to consolidate/manipulate a bunch of data from several sheets and it seemed to be running slower than a data table). how to write a progress bar for this type of code? I.e. code that does not loop and is just time-consuming?
View 4 Replies
View Related
Jul 6, 2005
I was looking at a previous post to get a progress bar to work while running
a lengthy macro. Below is the post on how to incorporate the progress bar
into your code.
That works fine expect for one thing. There is a cancel button on the progress bar, and when it is pushed the rest of my code continues running. How do I end my code if I press cancel on the progress bar?
Sub Main
Dim PB as clsProgBar
Set PB = new clsProgBar
'if your subs are being called from a userform, hide the form first using
Me.Hide
With PB
.title = "some title"
.caption1 = "Executing, this may take a while"
.caption2 = "Doing task 1"
.show
doevents...................................................
View 14 Replies
View Related
Oct 25, 2008
As i have a pretty "complex" macro, which takes around 20-30 minutes to do (honestly)....
I was wondering if there was a way to create a progress bar just showing me how many % it has done so for?
Or even tell me which sub routine it is up to? (but % would probably be better)
And preferably a pop-up box one?.. not one on the status bar because i have stuff updated on the status bar already...
View 14 Replies
View Related
Jan 14, 2008
I'm running some macros that take a bit of time (1000-2000ms), and would like to give the user some feedback as to what's happening.... Ideally, I'd like to show a msgbox-like pop-up window saying something "processing..." while the macro executes.
I have tried using userforms (based on this post Excel VBA Macro- How to Create a Splash Screen for your Excel Workbook); however they halt background execution...
Is there any built-in functionality similar to .statusbar, but more obvious/visual that would allow this? I'm about to experiment with showing/hiding a textbox shape, but this seems a bit sloppy...
View 2 Replies
View Related
Feb 26, 2008
I have a program that screen scrapes data fom a mainframe emulation program. There are many loops used in order to slow the program down checking for things to load before taking the information. I would like to build some kind of display showing the user what the program is doing and allow them to stop the program if they like. Right now while the program is running everything is frozen and unresponsive.
View 3 Replies
View Related
May 18, 2014
Display progress bar with percentage completion.
The below code just display macro is running without notifying user the percentage of completion.
[Code] .....
View 2 Replies
View Related
Mar 31, 2014
I have a user form we are using to transfer data into an excel spread sheet. When transferring the date from a text field it is formatted as general, I need this to be a date format DDMMYYY. The cell needing formatting is N2
View 5 Replies
View Related
Jan 23, 2007
how to mimic SELECT TOP 90 PERCENT from Access in Excel?
I can't use the percentile function because it interpolates the value if you don't have the right multiple of values in your array.
View 9 Replies
View Related
Aug 9, 2007
I have a spreadsheet that determines what percent increase over a previous quarter. The values can be negative or positive; however, I have one entry that I'm trying to divide zero by a number which results in the #DIV/0! error message. I rather have it say -1000% since that is the value I'm looking for. I now how to deal with a simple division by using an IF statement such as IF(B1,A1/B1,0), but this one is throwing me a curve.
The attached spread sheet is a quarterly percent increase over the last one. In the example, N00377 represents a machine in cell D14 and D17, where cell D17 is the last quarter, and I'm comparing it to cell D14 which should show an increase or decrease in cell F.
View 9 Replies
View Related
Sep 27, 2007
I have a set of data that is meant to distribute a certain number of items to different groups.
I have 10 groups, some will get more than others depending on previous usage. The problem is that I need the percentages to be in whole numbers and the total percentage needs to be 100%. I tried rounding but it doesn't work. Here is an example from one item's line.
Group#,1,2,3,4,5,6,7,8,9,10
Dist %,.1,0,.04,0,0,0,0,0,.87,0
These are rounded and it comes out to be 101%.
View 9 Replies
View Related
Feb 16, 2010
I want to find the percent of increase over last year. If last year was 100 and this year is 500 then the percent would be 500%. However things get tricky if last year was -100 and this year is 500 or if last year was 100 and this year is -500 then it get's screwy and I'm not sure what formula to use to handle any situation.
View 9 Replies
View Related
Jun 18, 2006
This is what I have
Rate Hours =basePay plus 6% plus 7.1% total
$50.00 10 $500.00 $530.00 $567.63 $567.63
What i want to have is one cell that I can Total everything.
I want my spread sheet to display just rate, hours total
I am having troule making the formula to display everything in the total cell
View 4 Replies
View Related
Apr 30, 2007
I need a formula to show percent value in a certain way in cell D1
formula is
C1 = B1-A1
but I am stuck to get the percent syntax in formula bar right.
D1 = PERCENT OF B1-A1
Example1
A1 B1 C1 D1
52.5-2.50-50 % ( RED/NEGATIVE PERCENT)
Example2
A1 B1 C1 D1
2.552.5050% ( BLACK/POSITIVE PERCENT)
Example3
1037.00-70% ( RED/NEGATIVE PERCENT)
3107.00 70% ( BLACK/POSITIVE PERCENT)
Somehow I seem to think I need to use the Value of C1
( which is required btw) to get a percent in D1, but not sure how it
would go in one complete formula in D1
View 9 Replies
View Related