Create A Graduating Schedule To Figure Fees
Dec 1, 2008
I am using Excel 2007. I want to create a graduating schedule to figure fees. For example, $10 per thousand for the first $500,000. $13 for the next $2,000,000, etc. I have tried to understand the IF function but am not sure if this is the correct one to use.
View 9 Replies
ADVERTISEMENT
Jul 11, 2014
Each row of the spreadsheet from a6:a25 is the planned production of one cellbuilder.
From this sheet I need to produce a work schedule of tasks to be performed by date.
Detailing, batch, cellbuilder number,weather 1st or 2nd graft etc, and the date available (for picking)
I would like the option to choose a daily or weekly schedule.
Is this possible ? and how would I even start to go about it. I just can't visualise how to do it.
View 1 Replies
View Related
Jun 3, 2008
I have three columns. the first column is a list of buyers (19), then second column is a list of suppliers (27) and the three column is the time. each supplier has ranked the buyers and the order they want to meet them.
every meeting is for 20 minutes e.g 1st meeting at 8am then next at 820am.
i can do all of it manually but the schedule becomes too long.
is there a way to make the schedule in a way that it is easily readable by anyone and if I need to add anything, it should not be an issue.
View 9 Replies
View Related
Jul 11, 2013
I am trying to use Excel to generate a game schedule for my fantasy football league. Right now I handle this task manually but I figured there has to be a way for Excel to work it out.
Let's say I have 16 teams playing 16 games. I have a table written out using numbers to represent the different teams. The x-axis has one team number per column while the y-axis has a week number in each row. The intersection of any column with each row shows the x-axis team's opponent for the week. What I want to do is substitute a team name or abbreviation for the team numbers in the body of the table and then generate a formula (or script? - I'm not sure of the correct terminology) to then produce a listing of the games each week. So the output would look something like this:
Week 1
BNS v ROC
NYL v NFB
WBB v TCF
etc...
Each 3 letter abbreviation represents a team name. This would significantly reduce the amount of manual work I have to do since Excel would generate the game schedule as above for each week and then I take that information and dump it into the software I use to run the League.
View 3 Replies
View Related
Feb 20, 2014
I am about to apply for an entry-level job as a scheduler for a company that ships olive oil. But before I decide to actually do this I'd like to see what I'm getting myself into.
It is how Microsoft Excel is used to schedule shipments, monitor inbound shipments and keep track of inventory.
View 1 Replies
View Related
Feb 18, 2013
I've got a spreadsheet with several rows and the numbers within those rows are totalled up at the bottom. Is there a way where i can highlight the cell within the spreadsheet and it takes it off the accumulative total at the bottom? or something similar to this effect? I just don't want to have to remove figures from this spreadsheet and highlighting will be a good way of seeing what has been done
View 1 Replies
View Related
Oct 14, 2009
I learnt that " " & can combine the text and figure. However, when it comes to a negative numbers, i dont know how to maneouver it. Eg, Cell A1 is USD(50,000.00) and the comment in Cell B1 is Cost is USD(50,000.00). So the function in B1 = "Cost is "& what to put here?
View 3 Replies
View Related
May 29, 2008
I am trying to automate something I've been doing manually. Let me explain.
1.) I am givien information about fees associated with a mutual fund product. A sample is reproduced in F4:F8.
2.) Next, this information is entered into the table. See A4:D12.
3.) Finally, from this table, I must calculate the fees associated with various account sizes.
4.) I did this manually in cells G15:G16 for 2 different account sizes.
View 14 Replies
View Related
Nov 2, 2009
See the attached spreadsheet and the comment boxes inserted containing my questions.
View 10 Replies
View Related
Feb 9, 2010
I am an office worker in a (very) small business, and so we use excel as a simple database, which covers our needs easily. In particular, we use a sheet as a register of fees. The question I have involves the creation of a macro to find over-due fees.
The format of the sheet is:
A.Invoice date | B.Reference code | C.Client name | D.$$ cost | E.Due date (always 14 days from invoice date) | F.Payment received date | G.$$ Received
At current, when a fee is overdue, we manually check the list for unpaid fees past the due date and highlight them (generally yellow) and then copy and paste these to a seperate sheet (same book). I believe this could easily be accomplished with a macro, but I am not at all fluent in the coding.
What I believe the macro would require to do is sort through the list (first invoice in row 4), Check ifblank for column B (to make sure a fee exists), then check current date against due date. If 'overdue', check that G=D (received = cost). If not, highlight that row and copy to row 1 of new sheet. then return to fee sheet, move down a row, rinse and repeat untill out of fee's.
If column B is blank, then it might be the 2 row gap left between each month, so it would need to check ifblank for 3 consecutive rows before ending the macro.
If due date is blank (which happens sometimes because we enter drafts into the sheet, and just leave the dates blank until we send them out, but still has a ref code) then it should count as 'not overdue' and move on.
I think it'd be better as an on-click macro rather then an automatic macro, since it only needs to be done at certain times, not every time we fiddle with the sheet a bit. Being on-click, it could even use the same sheet to copy all the overdue's to (rather then create a new sheet every time), as long as it 'select all - delete's it before copying the new things.
Thanks for any help. I signed up just to get this help, so I deeply appologize if I have broken some sort of policy or rule.
View 8 Replies
View Related
Apr 22, 2006
I am attempting to calculate commission (J2) based on the data entered in cell D2
1. The total fees (H2) is a part of the calculation. It represents a value from .5% to a maximum of 3%.
2. If the Loan Description is specifically ‘80/20’ then 80% of the Loan amount is used in calculating the commission. (note: ‘80/20*’ is also a valid entry). Otherwise the total loan amount is used.
D E F G H I J
Loan Dsc. Int. DSCNT% Y-S-P% Fees Loan Amount Commission
80/20 7.52.0 1.0 3.0 $137,403 $4,122.09
I attempted this formula and obviously it’s incorrect:
Calculating Commission (J2)
=IF(H2=" "," ",=IF(D2="80/20",(I2*0.80)*(H2*0.01),I2 * (H2*0.01))
1. If H2 is blank then TRUE enter a blank
2. FALSE: H2 contains a fee rate then calculate the commission Commission Calculation: If the Loan Description is 80/20 then take 80% of the loan amount and multiply it by the rate fee amount (as a percentage) to get the commission. If the Loan Description is NOT 80/20 then use the whole loan amount in the calculation.
View 3 Replies
View Related
Jan 8, 2004
I am trying to build a spreadsheet to calculate referral fees paid to our agents. These are sliding scale fees and I need the formula to consider both the high and low range of the project value. For example we pay a certain percentages for sales in the following ranges:
Up to $5,000,000 (I got this one to work)
$5,000,001 to $7,500,000
$7,500,001 to $10,000,000
$10,000,000+
I assume the best way to do this is with an IF command but I only know how to use it for a single value, not a range. Also, if the statement is not true, then return $0.
View 9 Replies
View Related
Nov 15, 2013
I am looking to setup a formula to calculate a Fee that is based on the number of users of a service in a month, with the rate varying by the number of users. The first million users in a month will bring in $0.40 per user, for users 1-4M it will bring in $0.30 per user, for users 4M-7M it will bring in .20 per user, and for users beyond 7 million it will be .10 per user. So for example, if a user count was 9 million in a month, the calculation would be ($0.40 x 1 million) + ($0.30 x 3 million) + ($0.20 x 3 million) + ($0.10 x 2 million). I know the answer to the problem is obviously $2,100,000 but I can't build the formula that solves that and can handle instances where the user count is capped in one of the individual brackets. (IE if there are 3.5M users)
I've attached an example spreadsheet : Variable Fee Schedule.xlsx‎
View 7 Replies
View Related
Feb 3, 2014
I don't want to appear too expensive or give my products away. If I have a part that costs me £20.00 plus vat i.e £24.00. I have to include carriage £5.00 plus vat i.e £6.00. Ebay fees for car parts including PayPal is 10%. How much would I charge to retain 20% percent after all fees and charges and what formula would I use to make the calculator.
View 2 Replies
View Related
Oct 19, 2007
I have tried searching for it but I must not be entering the correct criteria.
how to figure a person's age if all I have is that person's birthdate?
View 9 Replies
View Related
Apr 27, 2007
i'm doing a process and in column N, i would need to have the following combinations:
A1
A2
C1
C2
H1
I1
so basically, a formula that would figure out the combinations available!
can this be done using a formula?
******** ******************** ************************************************************************>Microsoft Excel - Cost Calculator---V5---Try.xls___Running: 11.0 : OS = Windows XP (F)ile (E)dit (V)iew (I)nsert (O)ptions (T)ools (D)ata (W)indow (H)elp (A)boutK39=
KLMN39A12 40B 41C12 42D 43E 44F 45G 46H11 47I11 48J Cost Calculator
[HtmlMaker 2.42] To see the formula in the cells just click on the cells hyperlink or click the Name box
PLEASE DO NOT QUOTE THIS TABLE IMAGE ON SAME PAGE! OTHEWISE, ERROR OF JavaScript OCCUR.
View 9 Replies
View Related
May 27, 2007
I have a command button (code listed below) which is 1/2 working. I have a column of PID's (numbers) sorted in ascending order which includes multiple rows with the same PID. When the command is executed, I want to insert a new row after the last matched PID (this part of the code works fine),
or
Insert a new row for the non-existent PID but in the correct sorted location (this is what I can not seem to figure out how to get to work).
My data looks like this in the PID column.
PID (my header row in A1)
158
158
159
161
163
163
163
164
I can successfully insert another line 158, or 159, but can not determine where to insert a line for PID 160 (which is not in the list yet)..................
View 3 Replies
View Related
Jul 20, 2007
I have this great code, but I can;t figure out how to add more columns to it.
Private Sub Worksheet_BeforeDoubleClick(ByVal Target As Range, Cancel As Boolean)
If Target.Column = 2 Then
If Target.Value = "Q" Then
With Target
.Value = ""
End With
Else
With Target
With Selection.Font
.Name = "Wingdings 2"
.Size = 22
End With
.Value = "Q"
End With
End If
Cancel = True
End If
End Sub
View 9 Replies
View Related
Aug 4, 2007
I have the following which does what it says it does.
What I can't figure out is, If the used range Starting in row A5 is greater then or less then A50 not to apply the borders.
.Range("A5:M50").BorderAround Weight:=xlHairline
.Range("A5:M50").Borders(xlInsideVertical).Weight = xlHairline
.Range("A5:M50").Borders(xlInsideHorizontal).Weight = xlHairline
View 9 Replies
View Related
Apr 28, 2009
Here is what my table is im working with. The tite "todays date starts in Cell A1 and B1 is =Today().
I need to figure out how to do an if for the over 30,60,90 past due. Here the logic I need to figure out:
in the Over 30 column, the logic of the statement is as follows: If the difference between today's date and the date of the invoice is greater than 30 and equal to or less than 60, the amount goes into this column.(over 30 E3) To get the amount(the ammount in C3) into the Current column, the difference between the two dates must be less than 30. To get into the over 90 column, the difference between the two dates must be greater than 90. You can figure out the over sixty column. And this needs to be copied to the remaining colums
Today’s date: =TODAY() Shop Invoice Date Invoice Amount Current Over 30 Over 60 Over 90 Ludwig's Landromat =TODAY()-72 $432.78 Willie's Washing =TODAY()-107 $565.11 Wash It Here =TODAY()-80 $308.47 Spiffy Wash and Dry =TODAY()-58 $725.37 Water Soap & Hot Air =TODAY()-30 $427.95 Wash it & Dry it =TODAY()-90 $603.91 Acme Wash & Dry =TODAY()-60 $332.35 Totals
View 9 Replies
View Related
Jan 15, 2009
Is there a way to take the values between C2 & D2 and have them automatically post in column F ?
View 2 Replies
View Related
Oct 15, 2008
I make our employee schedule at work, and so in Excel I have eight sheets for one workbook. (Employee schedule, then each day of the week) On each day is a table separating the shifts. Morning, Split and Night.
I was wondering if there was a way for Excel to look at the schedule sheet, and then automatically place each employee and their shift on the following day sheets. (example: Joe has 2-10 on Monday, 10-6 on Thursday and Friday) So the Excel puts Joe underneath Split 2-10 for Monday, and Morning 10-6 on Thursday and Friday.
View 10 Replies
View Related
Nov 15, 2008
I am trying to schedule a macro to run at 11:45 pm every time. I use system scheduler to open the excel file and when I use this command to run the macro nothing happens. The workbook opens fine but the macro does not run. I only wants to run the macro once day even if I open the workbook during the day I do not want it to run.
View 13 Replies
View Related
Oct 16, 2009
We have huge restrictions on hours, and to avoid inputting, then revising the schedule into my companies scheduling module, then having to change it again when the boss looks it over, it's just confusing.
Anyway, I'll get to the point, I want to add the hours up in a row of cells for the week sunday through saturday. Like so:
1100-2100 | 1100-2100 | OFF | 1100-2100 etc... I want it to add these cells hours up and have the total end up in the 8th cell.
Is this possible? I am a new excel user, or at least, setting up my own sheet.
View 10 Replies
View Related
Dec 2, 2006
The table posted above is the schedule for my employee. I need an input box which asks for a date. When the user supplies date, it should look for people who are scheduled for that particular date and who are on leave and put the result in the next worksheet at the last occupied row.
For instance, if I supply the date as 2nd Dec then the next worksheet should be filled with @ row # 2 (Row1 has headings)
EmployeeEmp IDSchedule
A123409:00 PM - 06:00 AM
B123511:30 PM - 08:30 AM
C123602:30 AM - 11:30 AM
E123811:30 PM - 08:30 AM
G124009:00 PM - 06:00 AM
Then if I select 3rd Dec, the next worksheet should be filled with the following data starting fom row number 7 (just below the above data)
A123409:00 PM - 06:00 AM
B123511:30 PM - 08:30 AM
D123705:30 AM - 03:00 PM
G124009:00 PM - 06:00 AM
View 9 Replies
View Related
Feb 9, 2007
Excel is a new program for me sorry to say it but i have been try to figure out how to write a schedule on it and tally the hours for each employee i have them set up in rows right now and i hope i can keep it that way but i am tired of add hours up for each employee every week i'm sure it is really easy but can some one let me in no the little secret
View 9 Replies
View Related
Feb 24, 2009
Have a basic weekly schedule for 300 employees. Need to be able to identify the last day off in previous week so the following week isn't scheduled to work on the 6th or 7th day without a day off. For example, if schedule is Mon - Sun and employee #1 has Mon & Tues off this week, next week Mon would be the 6th day so I wouldn't schedule that person on Monday the following week. Calculate last column "Next Wk Mon" instead of manually figuring it out... Need to be able to identify last day off, count the days from that point to the next monday. It becomes difficult when days off are split...
MonTueWedThuFriSatSunNext Wk
23-Feb24-Feb25-Feb26-Feb27-Feb28-Feb1-MarMon
Emp 1OffOff6
Emp 2OffOff5
Emp 3OffOff4
Emp 4OffOff3
Emp 5OffOff2
Emp 6OffOff1
Emp 7OffOff1
Emp 8OffOff4
Emp 9OffOff2
View 9 Replies
View Related
Apr 6, 2009
Im having trouble with getting a macro to run at a specific time and day (Every Thursday at 7PM).
Here's what I have done so far..
1. I added my excel file to the task scheduler
2. created a class module and place the code below into it.
In testing the workbook opened but it asked if i wanted to enable or disable the macros - how do I get around this? And it does seem to kick off the macro (create_all).
Private Sub Workbook_Open()
If Hour(Now) = 1130 And Weekday(Now, vbMonday) < 7 Then
' TheNameOfYourCurrentProcedureHere
create_all
If Workbooks.Count = 1 Then
Me.Save
Application.Quit
Else
Me.Close True 'save the changes and close the workbook
End If
End If
End Sub
View 9 Replies
View Related
Jun 12, 2009
I am Cuttently creating a schedule in excel for work. the schedule will look like this:
Name.........................Shift
Andrew.......................6-3
Jonathon....................12-7
Kim............................9-5
etc etc
the thing is though this is simple enough but i am trying to use a bar chart to help me show how many people i will have on shift at anytime e.g ...
View 9 Replies
View Related
Aug 27, 2009
which is row D on my excel sheet. I need to fill into another form who works shift D, shift E and shift N. Is there a formula I can use to do this? I have given a small sample of my schedule below.
AB CD 252627ShaunD DDNicoleD EDEmilyE DECathyENEJohnNEN
View 9 Replies
View Related