Dates Before 1900
Sep 3, 2009
I'm an accountant, so I've always dealt with relatively current dates. Now I'm trying to do some geneology work, and I find that I can't put in a date prior to 1900. For example if I input "3/5/1870", it comes out as text. If I input "=date(1870,3,5)", it returns 3/5/3770 -adding 1900 years to my date. I don't need to do anything mathmatically with it, but it would be nice to have it return "March 5, 1870".
View 2 Replies
ADVERTISEMENT
Feb 6, 2014
I have a spreadsheet which was formatted from VB code. Within the sheet there are four date columns where some dates show as 00/01/1900 (due to them having '0' in at the time of running the code). I am trying to run some code to blank out all cells showing the 00/01/1900 date, but the code just isn't touching it. I reverted to simply recording the 'find and replace' function and inserting into my code, but those irritating dates still remain.
Code I have used is as follows:
[Code] .....
View 4 Replies
View Related
Feb 12, 2010
I am indexing dates from one workbook to another.
There are some blanks in the list that I am using, and I need to the blanks to stay as blanks in the sheet that I am indexing to, however they are displayng as 00/01/1900.
View 4 Replies
View Related
Aug 25, 2009
I am working with an Excel file that was created in 2001, has not been updated since.
In the first column on the first tab, is a date field, starting from 12/31/2000.
I try to change this to 12/31/2008, and I get the return date of 01/00/00. When I select the cell, the formula bar indicates 12/31/2008, but the cell shows 01/00/00.
If I change it back to 12/31/2000, it is back to normal. I tried to enter 2/3/2009 in another cell, converting to date format, and the same thing: 0/1/00 (Jan 0, 1900)
This is a US date format.
View 7 Replies
View Related
Feb 4, 2008
I currently have to display a large amount of data on a separate report. I have a master sheet which has columns and cells linked to another sheet, then a further sheet which has cells linked to the master sheet. The problem I am getting is when I link some of the date columns using a formula in the 3rd sheet, as this is looking at a cell that has another formula in on the other sheet it is displaying a date of 00/01/1900 if the value is zero, is there any easier way of getting the data to just display a blank as this is messing up the database it is being exported
View 9 Replies
View Related
Jan 15, 2009
I've conditioned formated some cells so that someone can type a number in and a date will appear in the cell.
Problem is if someone types 20 in the cell.. excel reverts back to Jan-20-1900
How can I get the current month and year when a number is typed in the cell?
Did excel exsist in the 1900?
SOLVED
Solution - I used the if command in A2 like this
View 6 Replies
View Related
Feb 8, 2009
The result of my formula should be blank, but 1/1/1900 appears instead and I can't get rid of it. Does anyone know why or how to fix. I can't just change the font color as it screws up other formulas.
=IF(ISNA((VLOOKUP(VendorTracking!$P10,LeadTimeVlookup,2,FALSE))),"",VLOOKUP(VendorTracking!$P10,LeadTimeVlookup,2,FALSE))
In this case the Vlookup is referring to an apparently blank cell with no formula in it. I googled 1/0/1900 and saw a few references that said formatting a cell with zero in it as a date would cause this result, but there is no zero in this case.
View 9 Replies
View Related
Dec 20, 2006
I have a cell that has a formula in it and is also Excel Dates & Times coded. Hence when the repsective cells are empty and there is no values to be calculated the date "00-jan-00" shows. how to prevent this from showing up allowing for a blank cell to only show?
View 4 Replies
View Related
Jan 30, 2008
I have a old spreadsheet file which I opened up in Excel 2003. It has a few worksheet tabs. 2 worksheet tabs seem identical. I will reference it as Worksheet1 and Worksheet2. In Worksheet1, I enter a date i.e. 1/25/2008 in any cell. It enters as inputted. But in Worksheet2, I enter the same date i.e. 1/25/2008, it appears as 1/0/1900. No matter what date I enter in Worksheet2 in any cell, it always appears as 1/0/1900. Now when I look at cell in the formula toolbar, it sees as a Math Formula meaning, it looks like this: =1/25/2008. How do I correct this Worksheet to recognize any date inputted, not to see it as a Math Formula?
View 4 Replies
View Related
Jan 30, 2009
How do you convert a range of dates in this format: 39843 (i.e today 30th of Jan 2009). To text like: 20080130. Secondly, For the same date, how do you make the weeknum function give answer '05' and not just '5'
View 2 Replies
View Related
Apr 12, 2009
I am trying to reference a cell on another worksheet, the cell is formatted to be a date. when i put in the following formula =Sheet2!A1 and i don't input a date into A1 on sheet 2 the cell containing the formula shows the date 00/01/1900, is there any way of stopping this showing, ideally the cell would be blank until I inputted a date into A1 on sheet 2
View 9 Replies
View Related
May 10, 2010
I have a column of data that requires the cell to be blank if the value is 00/01/1900. The data is linked to another cell. IE: cell E3 is linked to cell $D$3 The cell is formatted for dates in the format shown.
View 7 Replies
View Related
Nov 19, 2009
Three columns.
A - Date last checked
B - Due Date
C - Actual Date checked
Currently column B is formatted to Date and simply has =A+84 and will display a date 3 months in future. However if there is no date in column A, then column B displays a default 1900 date.. Is there a way of making this blank if there is no date in col A?
View 5 Replies
View Related
Apr 30, 2013
I have a pivot table and and struggling to group these by month as well as to sort thee in escending order.
Pivot Table  ABC3Row LabelsSum of DebitSum of Credit
413/02/201334367.1822844.19513/03/201326475.492219.66613/08/201230307.613541.2713/09/2012
18898.0318065.4813/10/2012Â 7210.52913/11/201241969.041767.821013/12/201232844.7724041.26
View 3 Replies
View Related
Jun 17, 2007
I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.
View 6 Replies
View Related
Nov 8, 2012
I'm trying to make a simple chart, which maps the value of an investment fund over time. I wanted to use the new 'Table' feature within Excel 2010 to format and maintain the formulae within the Table, and the 'Header' for the table contains the date, which is not at regular intervals.
If I opt not to use the Table feature, I can create a line-chart with ease, and Excel recognises that the Dates are indeed dates and plots the graph correctly. The minute I convert over to a Table, the Date headers are no longer recognised as dates, and are instead plotted as if they were text, at regular intervals.
I've tried multiplying the Date Headers by 1 to force them back to true Dates, but this still does not work. I've also changed the setting on the horizontal axis to Date axis rather than automatic, but still no joy.
View 1 Replies
View Related
May 3, 2009
look at the attached file - it was a CSV file. i want to convert the column of dates to say Mar 14 2009 type date. but it only converts some of them.
note some are on the left and some on the right.
View 5 Replies
View Related
Oct 21, 2011
I am in strange situation where I have a data with Invoice Dates. These dates are in Text. However, when I convert it into reall excel dates. For some reason the dates do not come right. convert my text dates into excel real dates. I did a lot of google search and apply these three methods but all of these gave me strange result I was not expecting. These are the methods I used and the result of each method.
Method 1 : Using Text to Column Wizard (Excel 2007)
I highlighted invoice column and went into text to column wizard. I clikced on Date button, and selected MDY format. Strangely enough, my result was day, month and year i.e. DMY which does not seem right.
Then I press Control ~ on this data as shown in second view.
Inv DateMDY09/22/1122/09/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/2011
control ~ (overview)
Inv DateMDY09/22/114080808/31/114078608/31/114078608/31/114078608/31/1140786
2nd Method - Using formula to convert text date to real dates When I used formula, I get the following result. As you can see, formula is converting text dates into different system dates than the first method.Further strange things is when I take these system dates i.e. 4283 and in 2007 excel format use "Short Date" the same system date gets converted into wrong year as shown in the second view.
Inv DateFormulaFormula Result09/22/11=DATE(MID(B2,7,2),MID(B2,1,2),MID(B2,4,2))428308/31/11=DATE(MID(B3,7,2),MID(B3,1,2),MID(B3,4,2))426108/31/11=DATE(MID(B4,7,2),MID(B4,1,2),MID(B4,4,2))426108/31/11=DATE(MID(B5,7,2),MID(B5,1,2),MID(B5,4,2))426108/31/11=DATE(MID(B6,7,2),MID(B6,1,2),MID(B6,4,2))426108/31/11=DATE(MID(B7,7,2),MID(B7,1,2),MID(B7,4,2))4261
2nd view - system dates are getting converted into 1911
Inv DateFormulaFormula Result09/22/11428322/09/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/1911
Similarly, I tried other methods or copying blanks etch but none seems to convert text dates into real (system dates).
View 4 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
May 14, 2009
Hi Guys, This has been bugging me for a bit now and I just can't sus it...
I have a sample perpetual calender that I have been modifying to fit my own purpose. The calender part works fine.
I have beside that a column for holidays, etc and then a another column for other events.
When I put the date in the holiday or events columns I would like the date to be highlighted in the calender above (different colour depending on which column it came from).
The formula I have been playing with (no success) is:
=MATCH(DATE($R$2,1,C8),$I$41:$I$65,0) - This is the Formula for the 1st column of dates.
The 2nd formula is similar, just changes the column it tries to draw the MATCH(DATE.... from...
Although this formula works fine on the sample spreadsheet. When I enter the formula on my sheet, it doesn't seem to work...
I have attached the spread sheet that I am working on.
View 2 Replies
View Related
Apr 4, 2008
there are a multitude of issues with US date formats when you're not in the US but I've run across one that I can't figure out.
I have a source table that has approx 5000 lines on it, everything looks correct and all the dates are in the correct (Australian) format. However when I use it to make a pivot table, any dates that are before the 12/m/yyyy gets changed to the mmddyyyy format in the pivot table only, all the source dates are still correct.
View 3 Replies
View Related
Nov 14, 2013
I would typically consider myself a decent Excel user, but I haven't been able to solve this one. Maybe it's just the lack of sleep now. I am attempting to combine 4 cells into one where the last cell contains a date. Below is the formula I am using:
=B3&" "&C3&" "&D3&" "&TEXT(E3,"m/d/yy")
It works when all of the cells have values, but the only problem I am having is that some of the dates (in column E) are blank. When this cell is blank the default date that displays is "1/0/00." If I add the typical, " " at the end it says the formula has errors. The need for the TEXT(E3,"m/d/yy") for the cells that contain dates is throwing me off.
View 3 Replies
View Related
Jan 22, 2014
I have a tracking template with a column listing dates, all i want to do is find all the missing dates from that column of dates.
Example:
Column A
1-May
2-May
4-May
5-May
7-May
8-May
10-May
11-May
12-May
14-May
15-May
I want to list the missing dates from this list.
View 4 Replies
View Related
Jan 27, 2006
Basically I have 2 columns each with a list of dates in no particular order (and containing blank cells too), one planned date column and one actual date column.
What I need to do is plot this on a graph, and since the number of dates has no set limit and I dont want to have to plot maybe 100 dates on the x axis, so i want to group them by week before plotting them, i.e. 10 dates for week ending 10th jan, 25 dates for week ending 17th jan etc
I have a pivot table that counts how many of each date occurs, i.e. 10 x 2nd jan, 7x 3rd jan etc etc but it does not split them into weeks.
im sure theres an easyish way of doing it so i can get the 2 lines on the graph for no. of planned dates each week and no. of actual dates each week, i just cant see it.
View 13 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Dec 9, 2013
I have attached an excel sheet for your reference. I have particular debit values that are to be added between the dates. And Dates are also derived by formula based of payment term.
The ones I need to modify is Highlighted in Yellow. The values to be added is in "Customer Statement" and in H Column
These dates also have formula by which there are derived
-------------------------Current Ageing-------------------------
Date Range
Bucket
Amount
Percent
Start Date
End Date[code].....
I am USing =SUMIFS('Customer Statement'!$A:$A,'Customer Statement'!$H:$H,"=" & E11) but does not work.
View 9 Replies
View Related
Feb 4, 2010
In Cells B2:B100, i have dates that which have been entered using a combo box (the dates type is for e.g. 14th March 2010 format)
I want a formula that will count the cells that have dates between 1st April 2010 to 30th June 2010 in cells B2:B100
Also, I would like a formula that counts weekend dates between 1st April 2010 to 30th June 2010?
View 9 Replies
View Related
Oct 15, 2009
I get a spreadsheet every day that has a column of numbers that contains dates that are not in a date format. Is there a way to convert these numbers to a date format? The numbers come from an outside source so I can't modify on the front end. look at the attached spreadsheet with representative data of what I'm trying to ccomplish.
View 2 Replies
View Related
Aug 16, 2006
I have a masive table of dates (the date is created via a if formula)
what i need is so wheni enter 2 dates in 2 cells the system checks all the dates between the two specified and then returns the contents of them to a small area on the page.
Dates To Test 14/08/2026 19/08/2026
Results
14/08/2026
15/08/2026
16/08/2026
17/08/2026
18/08/2026
19/08/2026
Table..............
i dont mind using script or anything like that, i dont have much knowlage of it but do have coniderable understanding of other langages and usually figure it out :D
View 3 Replies
View Related
Dec 31, 2006
I have a very large Excel spreadsheet that is generated through an Oracle application at least once a month at work. I would like some code (either a worksheet function or a VBA) to check and report the following. If the frequency in column C is "Monthly" or "Weekly" just go to the next row. If the frequency in column C is "Annual", add 183 days to the date in column B; if it is "Semi-Annual", add 92 days to date in column B; if it is "Quarterly" , add 46 days to the date in column B; if the frequency in column C is "2-Year", add 365 days to the date in column B. Once the check has been made; I need the new total or date that was calculated checked against the date the report is being run (system clock date). If the date or total days is less than today, a new worksheet, titled "Late" needs to contain that row of data. If the date or total days is greater than today's date, just go on to the next row. I've attached an example worksheet.
View 9 Replies
View Related