I have a very large Excel spreadsheet that is generated through an Oracle application at least once a month at work. I would like some code (either a worksheet function or a VBA) to check and report the following. If the frequency in column C is "Monthly" or "Weekly" just go to the next row. If the frequency in column C is "Annual", add 183 days to the date in column B; if it is "Semi-Annual", add 92 days to date in column B; if it is "Quarterly" , add 46 days to the date in column B; if the frequency in column C is "2-Year", add 365 days to the date in column B. Once the check has been made; I need the new total or date that was calculated checked against the date the report is being run (system clock date). If the date or total days is less than today, a new worksheet, titled "Late" needs to contain that row of data. If the date or total days is greater than today's date, just go on to the next row. I've attached an example worksheet.
View 9 Replies
ADVERTISEMENT
Jun 4, 2014
I've used conditional formatting to highlight dates which are due this week and next week, but now I need to highlight which dates are overdue.
Each row is a task/job.
I have a 'Due Date' column.
I also have a 'Date Completed' column.
How do I highlight the overdue dates based on their due date (not today's date)?
And once I have entered a date in the 'Date Completed' column, I need the overdue highlight to be removed.
View 3 Replies
View Related
Jul 4, 2006
I have a spreadsheet where I am tracking tasks. I would like to conditionally format the "Completed" cell red whenever the Due Date has passed to easily identify which tasks are outstangin. And I would like that to happen no matther what date someone opens the spreadsheet. (I think I need to use TODAY() here.) Then once the user enters the actual completed date, the cell would go back to white with black font. Below is a sample:
Due Date Completed
5/8/2006 5/8/2006
5/8/2006 5/8/2006
5/12/2006
8/30/2006
This seems like it would be easy to figure out, but I've spent days on it and am not thinking clearly any more.
View 2 Replies
View Related
Jan 31, 2008
I'm trying to build up a spreadsheet with the info below to follow up the due and overdue invoices. My point is to highlight the whole row for an unpaid invoice at the due date.
Here's the basic structure of the document:
A colum: invoice ref
B : name of customer
C : Invoice date
D : Due date
E and F: Amount in EUR and USD
G : Paid (Yes/No)
1. I'd like to highlight the whole row in red when the invoice is due/overdue AND unpaid (G = No). That means 2 conditions.
2. When invoices are paid (when G = Yes), the row should be green.
3. Highlight the whole row in orange when the invoice is unpaid and due in 10 days.
View 7 Replies
View Related
Aug 18, 2007
to set a conditional format and include a function code in it as well?
I want a spreadsheet to change the color/font of a cell/column based on a comparison of a "start date" cell and a "due date" cell. This is to automate the process of highlighting items that have gone past the due date in the second cell. I was trying to do this by looking at the "now()" function and comparing it to the due date.
View 9 Replies
View Related
Jun 27, 2006
I am trying to set up a spreadsheet to track certification expiration dates and things of that nature at my volunteer fire department. At my career job, we use specialty software like Firehouse, but that is way too expensive so I must settle for Excel..or maybe Access.
Basically, I need a formula that will look at todays date and compare it to the date in a given cell and then somehow differentiate thise which are expiring at a given intercal.
For example, if someones EMT was expiring in 6 months it would turn yellow, then at 3 months turn blue, then red at 1 month then black if it expires.
It don't necessarily have to be just like that, just some way to differentiate depending on the how close to expiration it is.
View 3 Replies
View Related
Oct 26, 2012
I have a column CF which has to calculate the due date based on start date in column X and end date in column Y.
This is achievable however; I have dropdown columns in CE which has below option.
Below is the requirement.
If user select "Should Pay" from drop down in column CE, then in column CF the due date has to be Start date + 7 days
If user selects "Not to Pay" from drop down in column CE, then in column CF the due date has to be N/A or Blank
If user selects "Has Time to Pay" from drop down in column CE, then in column CF the due date has to be Start date + 9 days
If user selects "Misc" from drop down in column CE, then in column CF the due date has to be (End date - Start Date)/8+7
if this can be attainable either via formula or VBA.
View 4 Replies
View Related
Oct 31, 2013
We want to count the numbers of days between two dates however of 2nd date is null...count till todays date
If ActivityType is "E" and DDate is null Count number of days from EDate till Today().
If ActivityType is "D", Count number of days between EDate and DDate.
Column F is the desired result, Number are asuming todays date is 10/31/2013
[Code]....
View 5 Replies
View Related
Feb 28, 2008
I'm trying to do a sumif based a range of dates but keep getting a "-" for the result.
In the past when using dates I've had to value the dates in order for it to work. I can't seem to figure out the formula this time around - any thoughts? See attached for sample - my 'broken' formula is in cell C29.
View 4 Replies
View Related
Jul 18, 2012
I am trying to run an array formula to match two dates on two seperate sheets as close together based on another cell. Below is what I currently have on some made up values. I am entering it as an array and ideally I would like it to run down the cells changing the reference A2 depending on which cell it is then to then enter this into a macro.
The formula I am currently using is:
=INDEX(Trees!B$2:B$75,MATCH(MIN(INDEX(ABS(IF(A2=Trees!A$2:A$75,(Trees!B$2:B$75-B2))),0)),INDEX(ABS(IF(A2=Trees!A$2:A$75,(Trees!B$2:B$75-B2))),0),0))
Sheet 1 (Named: Main)
Number
Date
Formula
1
15/06/2012
[Code] ....
Sheet 2 (Named: Trees)
Number
Date
1
05/06/2012
[Code] .....
View 2 Replies
View Related
Apr 29, 2014
i have with noting the most recent date of a test and also the one prior to the most recent dependant on location and test type. I require most recent and previous test info to enable a comparrison to be made. All other dates are not required but need to be kept as historical data and can't be deleted.
Is there anyway i could get column E to auto populate and amend itself as more test dates and locations are added to the list?
View 1 Replies
View Related
Jul 30, 2008
I have a spreadsheet which lists letters issued, the date issued and the potcode. I need a formula that counts, on a weekly basis, the number of letters issued to postcodes in Sutton and Bexley.
I have a count sheet set up on one worksheet and the list of postcodes applicable to each area are listed on another worksheet. I have been playing around with sumif, sumproduct etc, but these don't seem to work as I am pointing the formula to a list of postcodes and not an individual postcode. For example, the formula for one week needs to tell me, the number of letters issed to Sutton between 26/07/08 - 01/08/08. This is what I tried -
=SUMPRODUCT(('MU63 NC'!$F$2:$F$10>=COUNT!B$2)*('MU63 NC'!$F$2:$F$10<=COUNT!B$3)*('MU63 NC'!$D$2:$D$10=Sutton!$A$2:$A$50))
But I get #N/A - if I change the last refernce to a specific cell instead of a range it works, but this will make the process very lengthy as there are lots of postcodes!
View 5 Replies
View Related
Apr 30, 2013
I have a pivot table and and struggling to group these by month as well as to sort thee in escending order.
Pivot Table  ABC3Row LabelsSum of DebitSum of Credit
413/02/201334367.1822844.19513/03/201326475.492219.66613/08/201230307.613541.2713/09/2012
18898.0318065.4813/10/2012Â 7210.52913/11/201241969.041767.821013/12/201232844.7724041.26
View 3 Replies
View Related
Jun 17, 2007
I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.
View 6 Replies
View Related
Nov 8, 2012
I'm trying to make a simple chart, which maps the value of an investment fund over time. I wanted to use the new 'Table' feature within Excel 2010 to format and maintain the formulae within the Table, and the 'Header' for the table contains the date, which is not at regular intervals.
If I opt not to use the Table feature, I can create a line-chart with ease, and Excel recognises that the Dates are indeed dates and plots the graph correctly. The minute I convert over to a Table, the Date headers are no longer recognised as dates, and are instead plotted as if they were text, at regular intervals.
I've tried multiplying the Date Headers by 1 to force them back to true Dates, but this still does not work. I've also changed the setting on the horizontal axis to Date axis rather than automatic, but still no joy.
View 1 Replies
View Related
May 3, 2009
look at the attached file - it was a CSV file. i want to convert the column of dates to say Mar 14 2009 type date. but it only converts some of them.
note some are on the left and some on the right.
View 5 Replies
View Related
Oct 21, 2011
I am in strange situation where I have a data with Invoice Dates. These dates are in Text. However, when I convert it into reall excel dates. For some reason the dates do not come right. convert my text dates into excel real dates. I did a lot of google search and apply these three methods but all of these gave me strange result I was not expecting. These are the methods I used and the result of each method.
Method 1 : Using Text to Column Wizard (Excel 2007)
I highlighted invoice column and went into text to column wizard. I clikced on Date button, and selected MDY format. Strangely enough, my result was day, month and year i.e. DMY which does not seem right.
Then I press Control ~ on this data as shown in second view.
Inv DateMDY09/22/1122/09/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/2011
control ~ (overview)
Inv DateMDY09/22/114080808/31/114078608/31/114078608/31/114078608/31/1140786
2nd Method - Using formula to convert text date to real dates When I used formula, I get the following result. As you can see, formula is converting text dates into different system dates than the first method.Further strange things is when I take these system dates i.e. 4283 and in 2007 excel format use "Short Date" the same system date gets converted into wrong year as shown in the second view.
Inv DateFormulaFormula Result09/22/11=DATE(MID(B2,7,2),MID(B2,1,2),MID(B2,4,2))428308/31/11=DATE(MID(B3,7,2),MID(B3,1,2),MID(B3,4,2))426108/31/11=DATE(MID(B4,7,2),MID(B4,1,2),MID(B4,4,2))426108/31/11=DATE(MID(B5,7,2),MID(B5,1,2),MID(B5,4,2))426108/31/11=DATE(MID(B6,7,2),MID(B6,1,2),MID(B6,4,2))426108/31/11=DATE(MID(B7,7,2),MID(B7,1,2),MID(B7,4,2))4261
2nd view - system dates are getting converted into 1911
Inv DateFormulaFormula Result09/22/11428322/09/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/1911
Similarly, I tried other methods or copying blanks etch but none seems to convert text dates into real (system dates).
View 4 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
May 14, 2009
Hi Guys, This has been bugging me for a bit now and I just can't sus it...
I have a sample perpetual calender that I have been modifying to fit my own purpose. The calender part works fine.
I have beside that a column for holidays, etc and then a another column for other events.
When I put the date in the holiday or events columns I would like the date to be highlighted in the calender above (different colour depending on which column it came from).
The formula I have been playing with (no success) is:
=MATCH(DATE($R$2,1,C8),$I$41:$I$65,0) - This is the Formula for the 1st column of dates.
The 2nd formula is similar, just changes the column it tries to draw the MATCH(DATE.... from...
Although this formula works fine on the sample spreadsheet. When I enter the formula on my sheet, it doesn't seem to work...
I have attached the spread sheet that I am working on.
View 2 Replies
View Related
Apr 4, 2008
there are a multitude of issues with US date formats when you're not in the US but I've run across one that I can't figure out.
I have a source table that has approx 5000 lines on it, everything looks correct and all the dates are in the correct (Australian) format. However when I use it to make a pivot table, any dates that are before the 12/m/yyyy gets changed to the mmddyyyy format in the pivot table only, all the source dates are still correct.
View 3 Replies
View Related
Nov 14, 2013
I would typically consider myself a decent Excel user, but I haven't been able to solve this one. Maybe it's just the lack of sleep now. I am attempting to combine 4 cells into one where the last cell contains a date. Below is the formula I am using:
=B3&" "&C3&" "&D3&" "&TEXT(E3,"m/d/yy")
It works when all of the cells have values, but the only problem I am having is that some of the dates (in column E) are blank. When this cell is blank the default date that displays is "1/0/00." If I add the typical, " " at the end it says the formula has errors. The need for the TEXT(E3,"m/d/yy") for the cells that contain dates is throwing me off.
View 3 Replies
View Related
Jan 22, 2014
I have a tracking template with a column listing dates, all i want to do is find all the missing dates from that column of dates.
Example:
Column A
1-May
2-May
4-May
5-May
7-May
8-May
10-May
11-May
12-May
14-May
15-May
I want to list the missing dates from this list.
View 4 Replies
View Related
Jan 27, 2006
Basically I have 2 columns each with a list of dates in no particular order (and containing blank cells too), one planned date column and one actual date column.
What I need to do is plot this on a graph, and since the number of dates has no set limit and I dont want to have to plot maybe 100 dates on the x axis, so i want to group them by week before plotting them, i.e. 10 dates for week ending 10th jan, 25 dates for week ending 17th jan etc
I have a pivot table that counts how many of each date occurs, i.e. 10 x 2nd jan, 7x 3rd jan etc etc but it does not split them into weeks.
im sure theres an easyish way of doing it so i can get the 2 lines on the graph for no. of planned dates each week and no. of actual dates each week, i just cant see it.
View 13 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Dec 9, 2013
I have attached an excel sheet for your reference. I have particular debit values that are to be added between the dates. And Dates are also derived by formula based of payment term.
The ones I need to modify is Highlighted in Yellow. The values to be added is in "Customer Statement" and in H Column
These dates also have formula by which there are derived
-------------------------Current Ageing-------------------------
Date Range
Bucket
Amount
Percent
Start Date
End Date[code].....
I am USing =SUMIFS('Customer Statement'!$A:$A,'Customer Statement'!$H:$H,"=" & E11) but does not work.
View 9 Replies
View Related
Feb 4, 2010
In Cells B2:B100, i have dates that which have been entered using a combo box (the dates type is for e.g. 14th March 2010 format)
I want a formula that will count the cells that have dates between 1st April 2010 to 30th June 2010 in cells B2:B100
Also, I would like a formula that counts weekend dates between 1st April 2010 to 30th June 2010?
View 9 Replies
View Related
Oct 15, 2009
I get a spreadsheet every day that has a column of numbers that contains dates that are not in a date format. Is there a way to convert these numbers to a date format? The numbers come from an outside source so I can't modify on the front end. look at the attached spreadsheet with representative data of what I'm trying to ccomplish.
View 2 Replies
View Related
Aug 16, 2006
I have a masive table of dates (the date is created via a if formula)
what i need is so wheni enter 2 dates in 2 cells the system checks all the dates between the two specified and then returns the contents of them to a small area on the page.
Dates To Test 14/08/2026 19/08/2026
Results
14/08/2026
15/08/2026
16/08/2026
17/08/2026
18/08/2026
19/08/2026
Table..............
i dont mind using script or anything like that, i dont have much knowlage of it but do have coniderable understanding of other langages and usually figure it out :D
View 3 Replies
View Related
May 18, 2007
I have a very large spreadsheet that comes out of SAP and it brings out the majority of cell entries as text ie putting a ' at the begining of any number. the problem that i have is with the cells that have a date in them ie '19/04/07. I have tried varioous methods to remove this and turn the cells into date format but to no avail.
Also i do not get the option to convert text to number
View 6 Replies
View Related
Feb 13, 2008
I have a WAY to complicated excel form that I'm going to move to Access but I need to have this working in the interim. The form has a dynamic element, the user can choose the number of items they are ordering and it unhides the required number of text boxes. To keep the scripting down a did a little work-around to update the database using a loop through the form controls:
'Save the main row
MainOrderRow = ActiveCell.Row
LastRow = MainOrderRow + (ExtraOrders - 1) ' Calculate the last row
ExtraOrderNo = 1
For DBRow = MainOrderRow To LastRow
' Save the text box name with the extra order number
k = "txtDescriptionMul" & ExtraOrderNo & ""
l = "txtQuantityMul" & ExtraOrderNo & ""
m = "txtTotalValueMul" & ExtraOrderNo & ""
n = "ComboBoxUnitMul" & ExtraOrderNo & ""...................
View 2 Replies
View Related