Formula To Calculate Holidays?
Jan 15, 2014MLK day is the 3rd in January. I have a cell with the current Year 2014, which becomes input in the formula.
View 3 RepliesMLK day is the 3rd in January. I have a cell with the current Year 2014, which becomes input in the formula.
View 3 Replies1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
I'm trying to run the code below to add functions to a couple of columns untill the value of the cell is equal to "End". I am recieving the error "Object variable or With block variable not set (Error 91)" and I'm not sure why. I have set my WITH up and I have defined the object. Any thoughts would be greatly appreciated. Thanks.
Option Explicit
Private Sub CommandButton1_Click()
Dim shtXL As Excel.Worksheet
Dim wbkXL As Excel.Workbook
Set shtXL = wbkXL.ActiveSheet
With shtXL
Do Until ActiveCell.Value = "End"
.Range(.Range("W2"), _
.Range("A65536").End(xlUp).Offset(0, 1)).FormulaR1C1 = _
"=Workday(P$2,V:2,Z$2:Z$11)"
.Range(.Range("X2"), _
.Range("A65536").End(xlUp).Offset(0, 1)).FormulaR1C1 = _
"=Workday(S$2,V2)-1"
Loop
End With
End Sub
I need to calculate the number of days between 2 dates including holidays and weekends. That means I cant use NETWORKDAYS as it excludes weekend.
View 9 Replies View RelatedI am working on a sheet right now where I want to put the day a certain number of days in the future but I want to skip only Holidays, or days in a list on another part of the sheet, but count the weekend days.
All the formulas and post I have read is about someone wanting to skip weekends too. I did find a workdays formula where you and pick what you want to be considered as the weekend but I just want to skip holidays.
Example:
Day is Dec-31-2013 7 days in the future is Jan-7-2014
I want it to be since Jan 1 is a Holiday the answer will be Jan-8-2014
I want to create a formula that will do the following Each worker is entitled to 21 days holiday per year this will run from 8 Jan 08 to 7 Jan 09. But if a worker starts say 15 Apr 08 he would be entitled to less than 21 days. I would just like to be able to put his start date in a cell and then automatically generate how many days holiday he would be entitled to from 15 Apr to 7 Jan.
View 2 Replies View RelatedI would like to find out if a job took more than 24 hour cycle time (eg. 6:00 am to 5:59:59 AM next day). data:
A1 = received date & time (format "m/d/yyyy h:mm")
B1 = completed date & time (format "m/d/yyyy h:mm")
my formula is '=if(B1-A1>"24:00"+0,"Yes","No"). The problem with the formula is that it doesnt exclude weekends nor public holidays. I couldnt formulate a solution using networkdays function......
I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.
View 2 Replies View RelatedI have formula for working days which excludes holidays :
[Code] .....
Code works but I have monthly worksheet and macro for adding days in month. This formula's end date is in AI2 cell, which corresponds to 31th day of the month. Problem is that I get #REF error across all sheet when I delete last day columns, in month which have less than 31 days.
I know that this is the cell reference error because cell AI2 is deleted, but is there any solution for changing networkdays formula or replace It with something else that will work same, with range maybe ?
For now I just hide columns, which is o.k., but I would rather delete columns...
I have been asked to create a worksheet to calculate the percentage of the utilisation of a number of loan cars per month. Each of the cars may be used on each and every day of the week but the percentage utilisation is to be calculated on working days only. However it is essential to record the name of the driver of the car at weekends and holidays. Column A is populated with the dates of the month. Colum B is populated with the relative days of the week. In column C and subsequent columns I record the name of the driver of a particular car registration. Is there any way that I can count the number of drivers of each car on working days only and not weekends or bank holidays?
View 5 Replies View Relatedmy sheet has departure and arrival dates and each row can be for a transaction in a different country (there is an additional column with a 2 character ISO country code like GB, DE, FR,..)
I need to calculate networkdays but not every country observes the same holidays.
Networkdays function seems to allow a one dimensional list of holidays and I am looking for a 2-dimensional solution.
I am using this formula to calculate a set of PH(Public Holidays) that have passed from a period of 1/4/2009 to 31/3/2010.
=IF(TODAY()>='Team Schedule'!D5,1.5,0)+IF(TODAY()>='Team Schedule'!D6,1.5,0)+IF(TODAY()>='Team Schedule'!D7,1.5,0)+IF(TODAY()>='Team Schedule'!D8,1.5,0)+IF(TODAY()>='Team Schedule'!D9,1.5,0)+IF(TODAY()>='Team Schedule'!D10,1.5,0)+IF(TODAY()>='Team Schedule'!D11,1.5,0)+IF(TODAY()>='Team Schedule'!D12,1.5,0)+IF(TODAY()>='Team Schedule'!H2,1.5,0)+IF(TODAY()>='Team Schedule'!H3,1.5,0)+IF(TODAY()>='Team Schedule'!H4,1.5,0)-4.5
From what u can see here, its a massive formula.... but I am pretty sure that there is a shorter way to key in the formula
*Note*
'Team Schedule'!D5-D12 and 'Team Schedule'!H2-H4 are PH. disregard the 4.5 that is in the formula as it is used for other purposes. Every PH that has passed will credit a 1.5 into the cell.
I have this formula for determining the numberof days in the current month, excluding today.
=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY())-1
Now I need to exclude the holidays.
I'd rather not add another named list or table so I thought I'd use an array constant but can't get it to work. This is what I added:
{=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY(),{DATE(2007,10,10);DATE(2007,10,11)})-1}
Okay, I used oct 10 and 11 as an example to insure the formula is working. But it doesn't work and I can't figure out why.
I am trying to figure out how to take holidays and weekends out of my data.
View 9 Replies View Relatedi need a formula for which calculate all cell (calculating years months and days formula). FIND ATTACHED .xls file i need a answer in cell highlited in yellow color.
View 3 Replies View RelatedIf I have a formula which adds the value of each day of the week and divides by 7 to get an average per day, how do i fix it to get an average if their is a holiday so their would only be 6 days without changing the formula as the holidays could change from week to week by province.
=(a+b+c+d+e+f+g)/7 what happens if "e" is a holiday and I need to divide by 6, or in the case of xmas if "d and e" are holidays and I need to divide by 5?
I have written a workbook to show when a certain days order requirement needs to be submitted to our supplier, using WORKDAY and referring to a named range of holiday dates. This resulted in the correct day and dates being shown against the date on which the order needs to be placed, but had the same date down for Fridays, Saturdays, and Sundays, together with any holidays. I have got around this by using the fill option workdays only, so Saturday and Sunday are not listed. I wish to find a way of formatting, ie greying out any bank holidays to avoid confusion.
I have managed to get the desired effect by using
=MATCH($B3,holidays,0)>=1,
but think there should be a better way of doing this.
I am generating a spreadsheet that focuses on a target opening date. There is about 12 other headings along the top all stating the different phases of construction, permitting, etc. I need to exclude weekends and holidays from most of these columns, and only exclude holidays from about 2 of the columns. I think I am to use the formula for NETWORKDAYS, but not sure how or where to incorporate it.
View 9 Replies View Relatedhow to to get a continuous number in a cell without the increase in holidays that is Sunday etc.,
View 1 Replies View RelatedI have a schedule of holiday dates through year 2010 off to the side in cells N8-S18 that a workable formula could refer to.
........C...................D..................... ......E.........
1......1............10/25/2005...........10/26/2005
2......2............10/27/2005...........10/29/2005
3......0............10/29/2005...........10/29/2005
4......3............10/29/2005...........11/01/2005
Column C is the duration of the project in days. Column D is the project start date. Column E is the project end date.
As example, in D4 I'm using the formula =IF(C3=0,E3+0,E3+1). I need to include something to make it ignore weekends & holidays.
I don't have much experience in multiple conditions - I tried some things & made a decent mess of it.
I would like to highlight the holidays (for Belgium) through conditional formatting if possible or something else.
Exemple:
If D1 (= an holiday)
than highlight in grey D1:D34
How to proceed?
i have a cell with a date in it and cell with number of days in it
problem is i cant count weekends or holidays in the addistion
example b1 has 4/20/07 in it and c1 has 2 in it
i want to add c2 to b1 and compare to cell which could have a date in it or if not compare it to todays date
problem is i cant count weekends or holidays in the addition
so i would want to compare todays date to 4/24/07
if todays date is greater then the 2 cells added change color of cell
I have it like this
In column A is start of holidays
In column B is end of holidays
(one date written in A and one in B, and so on)
In C and D columns are start and end dates
Now I would like to check if start and and end dates of holidays, are between those dates in C and D
22/05/2006 24/05/2006
23/05/2006 24/05/2006
Check if first range of dates is between second one. Actually if holidays are between start and end date then check how many days are actually holidays in range of start and end dates
I have date range, create and fixed date as follows:
Create Date
Fixed Date
10/1/2013 17:36
10/25/2013 20:33
I have list of holidays as bellow:
1/1/2013
3/29/2013
4/1/2013
5/1/2013
[Code] .....
I need a result which shows how many holidays w/in the date range. The result i should be 1.
I've been trying to automate the calculations on timesheets and having some trouble. I've attached a rough copy of part of the sheet to this post.
Here's where I'm struggling:
The timesheet has columns for Ins/Outs as well as Reg Hrs (Should never be more than 8), OT 1.5 (Standard 1.5 OT pay for anything over 40 in a week), OT 1.0 (More than 8 hours worked in a day but Vacation/Sick/Holiday/Funeral time keeps it below 40 hours actual work time that week) and then columns for Vacation, Sick, Etc.
Now I'm confident that my Regular Hours works with the following formula:
=IF((((C3-B3)+(E3-D3))*24)>=8,8,((C3-B3)+(E3-D3))*24)
If statement calculates how many hours worked, multiples it by 24 to put it in an hour format and checks whether it's greater than or equal to 8, if so then only show 8 (since any additional hours worked would need to be in the OT 1.5 or OT 1.0 category depending on the circumstances). If false, returns how many hours worked.
However, I am having some issues getting my OT 1.5 and OT 1.0 categories working correctly. The OT 1.5 column needs to check whether the actual worked hours is over 40 without Vacation/Sick/Funeral, etc included. The OT 1.0 column needs to show any additional hours worked beyond 8 each day but less than 40 over the whole week because of holiday/sick/vacation, etc.
So, if I worked 10 hours on Monday and there isn't any sort of paid leave time that week (and I work normal 8 hours the rest of the week), then Monday would show 8 hours in Regular worked and 2 hours in OT 1.5. Here's what I'm currently using for a formula (that isn't working...my latest addition was the OR statement):
=IF(AND((((C3-B3)+(E3-D3))*24)>8, OR(($F$12-$K$12)>40), $K$12=0), (((C3-B3)+(E3-D3))*24)-8, "")
If I worked 10 hours on Monday and there is some sort of Holiday (and I don't actually work over 40 hours that week not including the 8 hours of Holiday pay), then Monday should show 8 hours in Regular time and 2 hours in OT 1.0. Here's what I'm using for this formula (that also isn't working well and I hadn't started working with the OR statement here yet since OT 1.5 wasn't working) :
=IF(AND((((C3-B3)+(E3-D3))*24)>8, $K$12 > 0, $F$12<40), (((C3-B3)+(E3-D3))*24)-8, "")
testsheet.xlsx
I want a formula that counts all days of a month "listed in a column" but excluding sunday.
View 14 Replies View RelatedI am trying to compare values from this week to last week with the exception that will overlook holidays. ie, from Monday to last Monday. But I am running into an issue if there is a holiday in the week as my formulas are looking for the value 5 days prior to the current day.
View 5 Replies View RelatedI have a report that starts with a desired date and generates dates backwards on when certain releases should come out. I would like the code to see the date, move it back a week, check to make sure it's not a weekend or holiday, then post it in the cell below. If it does happen to land on a weekend, it should then be the Friday before the weekend. If it is a holiday, it should be the date before the holiday, as long as it is not a Sunday (or another holiday).
Attached is the workbook that I'm using. I'm starting with the desired date 'B7' and using the Holidays in a seperate worksheet. I know that in the current example, nothing will land on the weekend, unless the holiday pushes it back to one.
I'm trying to count the total days between to dates but minus the fed holidays. I have a list of holidays I can ref. I like how the NETWORKDAYS function works but I need to include the weekends.
View 2 Replies View RelatedI have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.
View 2 Replies View Related