Continuous Numbering Excluding Holidays?

Dec 23, 2013

how to to get a continuous number in a cell without the increase in holidays that is Sunday etc.,

View 1 Replies


ADVERTISEMENT

Excluding Weekends And Holidays

Mar 21, 2013

I am generating a spreadsheet that focuses on a target opening date. There is about 12 other headings along the top all stating the different phases of construction, permitting, etc. I need to exclude weekends and holidays from most of these columns, and only exclude holidays from about 2 of the columns. I think I am to use the formula for NETWORKDAYS, but not sure how or where to incorporate it.

View 9 Replies View Related

Networkdays Formula Excluding Holidays

Feb 27, 2014

I have formula for working days which excludes holidays :

[Code] .....

Code works but I have monthly worksheet and macro for adding days in month. This formula's end date is in AI2 cell, which corresponds to 31th day of the month. Problem is that I get #REF error across all sheet when I delete last day columns, in month which have less than 31 days.

I know that this is the cell reference error because cell AI2 is deleted, but is there any solution for changing networkdays formula or replace It with something else that will work same, with range maybe ?

For now I just hide columns, which is o.k., but I would rather delete columns...

View 7 Replies View Related

Display Date, Excluding Weekends & Holidays

Oct 10, 2008

I have a report that starts with a desired date and generates dates backwards on when certain releases should come out. I would like the code to see the date, move it back a week, check to make sure it's not a weekend or holiday, then post it in the cell below. If it does happen to land on a weekend, it should then be the Friday before the weekend. If it is a holiday, it should be the date before the holiday, as long as it is not a Sunday (or another holiday).

Attached is the workbook that I'm using. I'm starting with the desired date 'B7' and using the Holidays in a seperate worksheet. I know that in the current example, nothing will land on the weekend, unless the holiday pushes it back to one.

View 4 Replies View Related

Calculate Number Of Days Excluding Holidays

Oct 7, 2011

I need to calculate the number of days between 2 dates including holidays and weekends. That means I cant use NETWORKDAYS as it excludes weekend.

View 9 Replies View Related

Date Function In Excel Excluding Weekend And Holidays

May 31, 2013

If I am using today's date, example: 5/30. I am looking to populate the next 10 business days.

Example: 5/31, 6/3. 6/4 etc.

I want to exclude weekends and holidays. I believe the following formual works to exclude weekends, but not sure how to incorporate holidays in the mix. =workday(today(),1) for one day after today, and then just keep increasing the number for days out.

View 2 Replies View Related

Calculation Of Business Hours Excluding Sundays And Holidays?

Jan 29, 2014

I want to calculate the time in hours between to dates excluding non-working hours and sundays and holidays.

My office timings: 10:00am to 05:30pm Saturday is working day. Only sundays and holidays to be excluded.

View 8 Replies View Related

Autofill Dates Excluding Bank Holidays & Weekends?

Feb 26, 2014

Is there a way to autofill dates in excel to exclude weekends and bank holidays?

View 6 Replies View Related

Auto Name Tabs With Dates Excluding Weekends And Holidays

Dec 5, 2013

I am trying to run a macro to put in the Month, Day, Year on each tab but I want it to exclude holidays and weekends. I am not a techie or anything but I would like to know how to do this. I have tried various vb codes but they don't exclude the weekends/holidays.

View 3 Replies View Related

Adding Time To A Date Excluding Weekends And Holidays

Feb 12, 2010

I've been reading up on Excel's date and time functions and can't really figure out the best way of doing this.

I have a total amount of time that a machine should take to finish a task. I'd like to enter a date and time into a cell (Start Date) and have another cell return the date and time that the machine should be done with the task excluding weekends, and holidays (End Date). This would be based on a certain number of "working hours" (hours in the workday minus break periods) that would be calculated in another cell.

View 9 Replies View Related

Calculating Lead Time Between Two Dates / Times - Excluding Holidays And Weekend

Apr 18, 2013

Calculating Lead time (in hours) between two dates/times, excluding holidays and weekend

Start Time
End Time
Lead Time

12/26/2012 15:50
1/2/2013 12:38:00
??????????

View 4 Replies View Related

Non-Continuous For Loop

Apr 22, 2006

Here is what I want to do:

Sub test()
Dim num As Integer
For num = 10 To 20 And num = 30 To 40 And num = 50 To 60
msgbox num
Next
End Sub

Rigth now I have to do this:

Sub test2()
Dim num As Integer
For num = 10 To 20
msgbox num
Next
For num = 30 To 40
msgbox num
Next
For num = 40 To 50
msgbox num
Next
End Sub

View 4 Replies View Related

NETWORKDAYS And Holidays

Oct 23, 2007

I have this formula for determining the numberof days in the current month, excluding today.

=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY())-1
Now I need to exclude the holidays.

I'd rather not add another named list or table so I thought I'd use an array constant but can't get it to work. This is what I added:

{=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY(),{DATE(2007,10,10);DATE(2007,10,11)})-1}
Okay, I used oct 10 and 11 as an example to insure the formula is working. But it doesn't work and I can't figure out why.

View 9 Replies View Related

How Do I Take Out Holidays And Weekends

Sep 21, 2009

I am trying to figure out how to take holidays and weekends out of my data.

View 9 Replies View Related

Drag Down Top Row Of Formulas For Non-Continuous

Mar 19, 2014

Is there a way to select cells with formulas for a top row and then fill down the formulas for these non adjacent, non-contiguous, etc. columns? I can paste a single formula, but not varying.

i.e. Cells A1, D1, and G1 have my formulas, and I want to identify that they have formulas in the first place and then drag down to let's say A10, D10, and G10. I will not know which columns contains cells before hand, and the given formulas are not fixed

View 9 Replies View Related

How To Rank A List That Is Not Continuous

Nov 17, 2012

I need to rank a list that is not continious. I have used the rank function before but its always been in list of numbers.

How do i get the rank to work for example, I only want to rank on cells: B3, B6, B8, B10

View 3 Replies View Related

How To Stop Continuous Refresh

Feb 17, 2013

I found instructions within this forum to successfully create a macro to start continuous recalcs of my excel spreadsheet to keep now() current.

Sub continuousrefresh()
Application.OnTime Now + TimeValue("00:00:05"), "continuousrefresh"
ThisWorkbook.RefreshAll
Calculate
End Sub

I want to be able to set up another macro to STOP this continuousrefresh macro. I think this should be easy but I am just not getting it.

View 1 Replies View Related

Continuous Cells Without Breaks

Jun 29, 2006

I have attached an example Excel file that shows what I am looking for. I have one sheet with a list of parts in inventory. Each part, we'll call them A-F, has a reorder point and will automatically detect whether or not the B column should say order or not. What I want is a second sheet that will list all the parts that need to be ordered continuosly, without the breaks where parts dont need to be ordered.

View 9 Replies View Related

Average Ignoring Holidays

Jan 11, 2009

If I have a formula which adds the value of each day of the week and divides by 7 to get an average per day, how do i fix it to get an average if their is a holiday so their would only be 6 days without changing the formula as the holidays could change from week to week by province.
=(a+b+c+d+e+f+g)/7 what happens if "e" is a holiday and I need to divide by 6, or in the case of xmas if "d and e" are holidays and I need to divide by 5?

View 7 Replies View Related

Conditional Formatting For Holidays

Jan 5, 2014

I have written a workbook to show when a certain days order requirement needs to be submitted to our supplier, using WORKDAY and referring to a named range of holiday dates. This resulted in the correct day and dates being shown against the date on which the order needs to be placed, but had the same date down for Fridays, Saturdays, and Sundays, together with any holidays. I have got around this by using the fill option workdays only, so Saturday and Sunday are not listed. I wish to find a way of formatting, ie greying out any bank holidays to avoid confusion.

I have managed to get the desired effect by using

=MATCH($B3,holidays,0)>=1,

but think there should be a better way of doing this.

View 2 Replies View Related

Formula To Calculate Holidays?

Jan 15, 2014

MLK day is the 3rd in January. I have a cell with the current Year 2014, which becomes input in the formula.

View 3 Replies View Related

Finding The Rightmost Value For A Non-continuous Range?

Feb 25, 2014

I have a set of data that has repeating column headers. So, on a sheet called "January" I have "Forecast" and "Actual" headers that repeat over and over underneath "Week 1", "Week 2", etc. On a different sheet (called "2014"), I'm trying to write a formula that will produce the latest or rightmost number underneath the "forecast" header. What I want is to be able to input data into the "January" sheet every week so that I have a record of progress and I want the "2014" sheet to show the latest data for every month.

View 5 Replies View Related

Not Sold Continuous Months Count

Mar 27, 2014

Find attached , expected result in on w2 needs to be 9 that I have punched manually : Team(A)01.xls‎

View 14 Replies View Related

Find Continuous Data Range

Apr 19, 2009

find a continuous data range in Column A of a worksheet with a header in A1. But now I'm thinking that I asked the wrong question. Each day I have new data (a series of numbers) that are moved into column A of a spreadsheet. I never know ahead of time how many numbers will be in the data set. And I need to perform a series of calculations on the data. I need to do the following:

1. Find the range of the data set.
2. Perform a series of calculations on the data set.
3. Report the results in a new location.

If #1 is pre-defined, then #2 and #3 are very easy. However, #1 is causing problems. I can find the range as a string:

View 4 Replies View Related

Count Continuous Occurrence Of Each Signs 1-X-2

Oct 22, 2011

Will it be possible to Count continuous occurrence of each signs 1-X-2 and arrange them in corresponding column From Q To AE as shown below in example table: 1

Draw result is shown in cells A2:N11 and result of Count continuous occurrence of each signs 1-X-2 is shown in cells Q2:AE11

For example we take a look row 7 where first sign-2 has occurred 3 times, as

Column Q is for to place result of sign1
And column R is for sign-X
So far count of sign-2, which is 3 times, must be paced in cell S7,
And then count of sign-1, which is 1 time, must be placed in cell T7,
And then count of sign-2, which is 5 times, must be placed in cell V7,
And finally count of sign-X, which is, also 5 times, must be placed in cell X7,

[code]....

View 8 Replies View Related

Indirect With Non-continuous Named Range

Oct 9, 2003

I'm trying to use Indirect in a formula where named range refers to multiple non adjacent cells; e.g. ever other cell {A1, A3, A5... etc}; however, when I use indirect, I recieve a #ref error. Replacing the indirect with the actual named range will make the formula work just fine, or using a named range that a continuous range works fine as well. It seems that indirect doesn't like non continuous ranges. ?

View 6 Replies View Related

Count Continuous Occurrence Of Each Signs 1-X-2?

Jul 31, 2013

Will it be possible to Count continuous occurrence of each signs 1-X-2 and arrange them in corresponding column From Q To AE as shown below in example table: 1

Draw result is shown in cells A2:N11 and result of Count continuous occurrence of each signs 1-X-2 is shown in cells Q2:AE11

For example we take a look row 7 where first sign-2 has occurred 3 times, as

Column Q is for to place result of sign1
And column R is for sign-X
So far count of sign-2, which is 3 times, must be paced in cell S7,
And then count of sign-1, which is 1 time, must be placed in cell T7,
And then count of sign-2, which is 5 times, must be placed in cell V7,
And finally count of sign-X, which is, also 5 times, must be placed in cell X7,

Example table: 1

ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACAD1P1P2P3P4P5P6P7P8P9P10P11P12P13P14
1X21X21X21X21X221X21X21X21X21X
11111111111111
3111XX22X11111X
322
1
51

[code].....

View 1 Replies View Related

Creating Macro For Continuous Averages

Mar 6, 2014

I'm a novice when it comes to macros but was wondering would it be possible to develop one to get continuous averages for a set of data. It's a very big data set with my first observation starting at A1 and last at over A19,000. The data is broken up half hourly so the first average would be from A1:A48 the second from A49:A96 and so on. Can a macro be created to repeat this format rather than me having to continuously highlight the different figures to get an average?

View 9 Replies View Related

Continuous Evaluation Of Time Function NOW()

Mar 4, 2008

1) The following formula returns TRUE or FALSE:

=AND($J$15"",(MOD(SECOND(NOW())-1,6)+10) = COLUMN())

It works fine as long as the w/b is busy doing something!

2) Otherwise if the w/b is not busy, the formula appears to be calculated only ONCE at the current time NOW(), and F9 must be pressed repeatedly to re-calculate the formula despite Tools::Options::Calculation is set to Automatic.

3) Is it possible to have NOW() representing a progressive NOW()?

4) If not, can the above formula be modified such that it is evaluated continually for, say, the next 60 or 120 seconds from the current NOW()?

View 9 Replies View Related

Continuous Plot Update With Scrollbar

Dec 3, 2008

I am using excel2000 on WindowsXP. I have a 2D surface plot pointing to data that can be continuously updated using a scrollbar from the Forms toolbox. For some reason, when I place the plot over the continuously changing cells, the plot does partially update when I scroll, and then fully refreshes once I let go of the scrollbar handle. If I move the plot far from the changing cells, it doesn't refresh at all until I let go of the scrollbar, so I'm forced to use it to page, instead of smoothly scroll. How can I get the whole surface to refresh continuously? Seems some kind of magic "event" logic is at work here....

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved