Add Additional Formula To Existing Formula To Exclude Weekends And Holidays?
Mar 27, 2014
I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.
View 2 Replies
ADVERTISEMENT
Aug 27, 2009
I have been asked to create a worksheet to calculate the percentage of the utilisation of a number of loan cars per month. Each of the cars may be used on each and every day of the week but the percentage utilisation is to be calculated on working days only. However it is essential to record the name of the driver of the car at weekends and holidays. Column A is populated with the dates of the month. Colum B is populated with the relative days of the week. In column C and subsequent columns I record the name of the driver of a particular car registration. Is there any way that I can count the number of drivers of each car on working days only and not weekends or bank holidays?
View 5 Replies
View Related
May 16, 2014
My aim is to find the end working date for each task, as well as the next working date for the next task. The working days for this employee are only Monday (6hours), Wednesday (6 hours) and Friday (8hours).
D
E
F
G
H
Start Date
Duration
Completed Days
Remaining Days
End Date
4
5/05/14
3
=IF(TODAY()>=H4, E4,IF(TODAY()
View 3 Replies
View Related
Apr 9, 2014
I'm using excel 2010 on a pc. I need to create a calender. So far I have been using the tutorial for the pop up calender. The result I'm looking for is to set up a specific time frame and have the calender provide the "due" date. I would like the due date to exclude weekends and holidays. Would I be able to do this with the pop up calender?
View 3 Replies
View Related
Aug 4, 2014
I have below formula which gives me the due status.
[Code] ......
How can I modify the code so it excludes Saturday and Sunday.
View 7 Replies
View Related
Sep 21, 2009
I am trying to figure out how to take holidays and weekends out of my data.
View 9 Replies
View Related
Mar 21, 2013
I am generating a spreadsheet that focuses on a target opening date. There is about 12 other headings along the top all stating the different phases of construction, permitting, etc. I need to exclude weekends and holidays from most of these columns, and only exclude holidays from about 2 of the columns. I think I am to use the formula for NETWORKDAYS, but not sure how or where to incorporate it.
View 9 Replies
View Related
Dec 14, 2005
I have a schedule of holiday dates through year 2010 off to the side in cells N8-S18 that a workable formula could refer to.
........C...................D..................... ......E.........
1......1............10/25/2005...........10/26/2005
2......2............10/27/2005...........10/29/2005
3......0............10/29/2005...........10/29/2005
4......3............10/29/2005...........11/01/2005
Column C is the duration of the project in days. Column D is the project start date. Column E is the project end date.
As example, in D4 I'm using the formula =IF(C3=0,E3+0,E3+1). I need to include something to make it ignore weekends & holidays.
I don't have much experience in multiple conditions - I tried some things & made a decent mess of it.
View 9 Replies
View Related
Apr 22, 2007
i have a cell with a date in it and cell with number of days in it
problem is i cant count weekends or holidays in the addistion
example b1 has 4/20/07 in it and c1 has 2 in it
i want to add c2 to b1 and compare to cell which could have a date in it or if not compare it to todays date
problem is i cant count weekends or holidays in the addition
so i would want to compare todays date to 4/24/07
if todays date is greater then the 2 cells added change color of cell
View 9 Replies
View Related
Oct 10, 2008
I have a report that starts with a desired date and generates dates backwards on when certain releases should come out. I would like the code to see the date, move it back a week, check to make sure it's not a weekend or holiday, then post it in the cell below. If it does happen to land on a weekend, it should then be the Friday before the weekend. If it is a holiday, it should be the date before the holiday, as long as it is not a Sunday (or another holiday).
Attached is the workbook that I'm using. I'm starting with the desired date 'B7' and using the Holidays in a seperate worksheet. I know that in the current example, nothing will land on the weekend, unless the holiday pushes it back to one.
View 4 Replies
View Related
Jun 21, 2006
I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.
View 2 Replies
View Related
Feb 26, 2014
Is there a way to autofill dates in excel to exclude weekends and bank holidays?
View 6 Replies
View Related
Dec 5, 2013
I am trying to run a macro to put in the Month, Day, Year on each tab but I want it to exclude holidays and weekends. I am not a techie or anything but I would like to know how to do this. I have tried various vb codes but they don't exclude the weekends/holidays.
View 3 Replies
View Related
Feb 12, 2010
I've been reading up on Excel's date and time functions and can't really figure out the best way of doing this.
I have a total amount of time that a machine should take to finish a task. I'd like to enter a date and time into a cell (Start Date) and have another cell return the date and time that the machine should be done with the task excluding weekends, and holidays (End Date). This would be based on a certain number of "working hours" (hours in the workday minus break periods) that would be calculated in another cell.
View 9 Replies
View Related
Jan 17, 2010
I am trying to compare values from this week to last week with the exception that will overlook holidays. ie, from Monday to last Monday. But I am running into an issue if there is a holiday in the week as my formulas are looking for the value 5 days prior to the current day.
View 5 Replies
View Related
Mar 16, 2009
I would like to find out if a job took more than 24 hour cycle time (eg. 6:00 am to 5:59:59 AM next day). data:
A1 = received date & time (format "m/d/yyyy h:mm")
B1 = completed date & time (format "m/d/yyyy h:mm")
my formula is '=if(B1-A1>"24:00"+0,"Yes","No"). The problem with the formula is that it doesnt exclude weekends nor public holidays. I couldnt formulate a solution using networkdays function......
View 3 Replies
View Related
Apr 7, 2014
I am trying to create a schedule that includes weekdays only. Is there a formula or set-up step to do that?
Currently I have 3 columns:
Start date Action date Finish date
The Action date column has the formula: that cell (say C4) minus number of days that action requires (say 10), but when 10 days fall on a weekend, I need to change to the next work day instead.
View 14 Replies
View Related
Aug 12, 2013
I have a worksheet of each month, column for each day. If today is Monday, we want to enter data for the previous business day. In this case, it will be Friday. I would like to have Friday's date (entire column if possible) to be highlighted in white bold font with maroon fill-in. So, whoever needs to enter Friday's data would know right away when he/she opens up document which column to work on. It works Monday - Thursday but not for Friday.
8/1/20138/2/20138/5/2013
ThursdayFridayMonday
Total English-Speaking Staff646464
Vacation Scheduled (hours)45.5080.0056.00
Vacation Unscheduled (hours)24.500.000.00
Sick Leave Scheduled (hours)37.5035.0025.00
Sick Leave Unscheduled (hours)73.0069.2533.75
Training Scheduled (hours)45.000.000.00
Training Unscheduled (hours)0.000.000.00
Meeting Scheduled (hours)0.000.000.00
Meeting Unscheduled (hours)0.000.000.00
Other Scheduled (hours)45.0044.0044.00
Other Unscheduled (hours)0.000.000.00
Total Leave Hours English270.50228.25158.75
Staff Leave Equivalent33.8128.5319.84
Total English-Speaking Staff Available30.1935.4744.16
View 6 Replies
View Related
Dec 9, 2009
I have been trying to count dates in my spreadsheet. The dates are supposed to go back in time (what they do). But I want them to jump over the weekends' dates instead of landing on them.
What I have is Start Date, Req'd Qty, Days it takes to make, Date it is required to start production (which I have a problem with).
A
1 26-Nov [Thursday]
2 1500
3 5
4 'Problem' I used for this cell that formula: =if(A2>0,A1-A3,"") , as I don't want it to show anything if there is no requirements.
It comes back with 21-Nov which is Saturday when I want it to come back with 19-Nov (Thursday) as we only have 5 working days in a week.
View 4 Replies
View Related
Jul 25, 2014
find the difference between 2 dates in excel "date 1 - date 2"..... but I'm not quite sure as to how one would do it while excluding holidays!
View 8 Replies
View Related
Aug 12, 2007
This task joins a string together based on a number of characters per cell in the range.
I want to isolate one range, Col N, and add an IF condition to it.
There may be other issues preventing this from happening, e.g. the number of IF that exist in the complete formula. I will isolate the current cell and its requirements and then post the entire formula at the end for reference....
View 9 Replies
View Related
Jan 15, 2014
MLK day is the 3rd in January. I have a cell with the current Year 2014, which becomes input in the formula.
View 3 Replies
View Related
Feb 27, 2014
I have formula for working days which excludes holidays :
[Code] .....
Code works but I have monthly worksheet and macro for adding days in month. This formula's end date is in AI2 cell, which corresponds to 31th day of the month. Problem is that I get #REF error across all sheet when I delete last day columns, in month which have less than 31 days.
I know that this is the cell reference error because cell AI2 is deleted, but is there any solution for changing networkdays formula or replace It with something else that will work same, with range maybe ?
For now I just hide columns, which is o.k., but I would rather delete columns...
View 7 Replies
View Related
Sep 18, 2008
when the user enters the letter Y in a cell within a set column a macro kicks in and enters a VLOOKUP formula in a cell 1 row above and 4 columns to the left by using ActiveCell.Offset (-1,-4).
This seems to work fine however when I try and get the coding to copy and paste special as values it just seems to ignore it?
View 9 Replies
View Related
Aug 16, 2006
my sheet has departure and arrival dates and each row can be for a transaction in a different country (there is an additional column with a 2 character ISO country code like GB, DE, FR,..)
I need to calculate networkdays but not every country observes the same holidays.
Networkdays function seems to allow a one dimensional list of holidays and I am looking for a 2-dimensional solution.
View 4 Replies
View Related
Apr 3, 2014
In my attached spreadsheet example below, in the Rollup Data sheet, I have a formula (Cell: C17) that will give me the actual cost totals that has been invoiced on WBS Element (DWRRI-BW096-231) for a total of $35,004.81.
What I need the formula do is run a redundant check procedure on my new WBS Element (DWRRI-BW096-231) actual cost total formula in the Rollup Data sheet (Cell: C17) against/vs. what the SAP system provides in the raw SAP Excel export contained in the PTD-Actual Cost sheet for the WBS Element (DWRRI-BW096-231) actual cost total of $35,004.81 (Cell: F9) that's highlighted in the yellow row.
In the Rollup Data sheet (Cell: C18), I need this formula to perform a similar function the as the previous formula above it (Cell: C17), but it this formulas function (Cell: C18) would have a separate operation that would only look for and return the single/sole WBS Element (DWRRI-BW096-231) actual cost total contained in the PTD-Actual Cost sheet (Cell: F9).
In the Rollup Data sheet I could then compare my two WBS Element (DWRRI-BW096-231) actual costs totals, the first from the automated addition of all the individual matching WBS Element actual costs into an actual cost total (Cell: C17), the second (new formula I'm requesting) from the matching and return function of the single/sole WBS Element actual cost total (Cell: C18).
So, if the two separate WBS Element actual cost totals (Cells: C17 vs. C18) both equal $35,004.81, the formula in C17 is a success and has correctly identified and added all the actual costs contained in the PTD-Actual Cost sheet, but if the two separate WBS Element actual cost totals (Cells: C17 vs. C18) both do not equal $35,004.81, the formula in C17 failed for some reason and has not correctly identified and added all the required actual costs contained in the PTD-Actual Cost sheet.
How to Add Total $ Value Formula into an Existing SUMIFS Formula.xlsx
View 2 Replies
View Related
Dec 19, 2008
I currently use the following formula: =workday(H21,H23,J20:J34) which calculates my date based the date entered in cell H21. While testing I realized that I needed to add another variable to the formula for a specific scenario. When my Date in H21 is less than todays date I require another workday formula to be calculated. How can I add this if statement to the existing formula?
View 2 Replies
View Related
Dec 22, 2012
I'm trying to add either a new condition to a formula or modify existing formula, so blank cells can't be taken as a number like 0 Here is the formula =IF(N14>0,1,0)
***This is what I do with formulas with similar problems =IF(COUNT(Y14,A14)=2,Y14/A14*100,"")
unfortunately the above condition its already a condition by itself so I don't know what to do whether to modify condition or add a new condition which I don't know how to do.
View 9 Replies
View Related
Feb 7, 2007
How do create a formula that will only execute this formula:
=COUNTIF($F$7:$F$106,"0")
for the rows in the range g7:g106 that are equal to 12 or 13 or 14 or 15
example
f7=0
f8=1
f9=0
f10=0
g7=12
g8=12
g9=17
g10=14
result = 2, because f7 and f10 are the only matches
View 9 Replies
View Related
Aug 8, 2006
I'm at my wits end trying to make a workday formula work, but am having no luck. I've searched the other posts, but did not quite find a match. I'm trying to subtract a number of days from a workday function, but it seems to bypass ignoring the weekends (as is supposed to be done automatically with Workday). Here's the formula I'm trying to use:
=WORKDAY(H5,L5,' Reference Info'!$E$110:$E$117)-(I5/8)
I5/8 is a column with hours - this just calculates a number of days to subtract based on the number of scheduled hours.
The formula will calculate, but it still ignores weekends. I've tried burying the I5/8 within the parenthesis, moving it around in the formula,
View 7 Replies