#VALUE! Error With Date Calculations
Jul 9, 2007
I have 2 columns of dates and would like to find the difference in 2 dates in column a and b for example. when I use the formula a2-b2 I get #Value! or # Name? in these cells. The cells appear to be in format dd/mm/yyyy. I tried formatting them to mm/dd/yyyy, but the dates are not changing at all. I have quite a few of these spreadsheets so it won't be practical to retype each cell individually.
View 7 Replies
ADVERTISEMENT
Sep 30, 2013
I have two date columns named "start_date" and "Dead_line".
Both the columns are in the date format. Ex: 9/14/13 9:14 AM
i want the third column to be the "status" column.
if sysdate-dead_line < 30 % of (dead_line - start_date), then the status column should become green. if sysdate-dead_line is between 30 % and 70 % of (dead_line - start_date), then the status column should become amber. if sysdate-dead_line > 70% of (dead_line - start_date), then the status column should become red.
First the dead_line - start_date to be converted to hours, then have to do conditional formatting like mentioned above.
View 2 Replies
View Related
Mar 4, 2009
I need to work out Revenue Rank & Year to Date calculations.
Consider a simple table:
| Partner Name | Year | Month | Revenue |
------------------------------------------
| John Smith | 2008 | Nov | 2000 |
| John Smith | 2008 | Dec | 2200 |
| John Smith | 2009 | Jan | 1898 |
| Mary Smith | 2008 | Nov | 1767 |
| Mary Smith | 2008 | Dec | 1867 |
| Mary Smith | 2009 | Jan | 1953 |
------------------------------------------
etc..etc...
I'm not using Pivot Tables since there are more complex issues around presentation which are preventing me doing this so are using good old formulas..
Revenue Rank is in reference to the Partner in this case. I need to be able to say John Smith is rank x out of xx by summing up his revenues for both:
a) one month
b) a range of 3 months back
How do I work this out? Especially the date calculations when I just have a year and month in separate fields?
View 9 Replies
View Related
Jan 17, 2008
i have a due date column and an adjusted due date column. a proof is allowed to be held 3 days, if it is held longer, the due date is adjusted. for every day over the allowed days that a proof is held, we are allowed 2 more days of production. i want to create a formula that will calculate how many EXTRA days the proof was held, multiply that by 2 and then add that many days to give us the adjusted due date. is there a way to do that?
View 10 Replies
View Related
Sep 22, 2006
I am having problems with calculations to be performed on date format. As in attached excel sheet, Start Date and End Date can be defined by the user. Once the user enters the dates, year 0 onwards are to be populated with values so that: (Also, not sure if I will need a button to initiate the calculations or a direct function will suffice)
year0 start = Start Date,
year0 end = (Start Date +12 months) or (End Date), if End Date is before (StartDate + 12)
year1 start = year0 end,
year1 end = (year0 end + 12 months) or (End Date), if End Date is before (year0 end +12)
year2 start = year1 end,
year2 end = (year1 end + 12 months) or (End Date), if End Date is before (year1 end +12)
year3 start = year2 end,
year3 end = (year2 end + 12 months) or (End Date), if End Date is before (year2 end +12)
year4 start = year3 end,
year4 end = (year3 end + 12 months) or (End Date), if End Date is before (year3 end +12)
year5 start = year4 end,
year5 end = End Date
If the dates are such that all years 0 to year 5 may not be covered, the years not used should be blank.
View 4 Replies
View Related
Dec 31, 2011
I am having a code like :
Code:
ActiveSheet.Select
Dim lFeild_Num As Integer
With Selection
lFeild_Num = .Columns(13).Column - .Columns(1).Column + 1
End With
Application.Dialogs(xlDialogFilter).Show lFeild_Num, ">=", 1, "
View 2 Replies
View Related
Dec 4, 2008
I want a formula to return the last day of the month for a given date in cell C9.
All over the web I see this recommendation:
=DATE(YEAR(C9),MONTH(C9)+1,0)
But every time I use it I get the error #NUM!
I've tried formatting the cell different ways, nothing works. The date in C9 is a valid date, Jan-09, which is actually 1/1/2009.
View 9 Replies
View Related
Apr 3, 2014
I am facing a weird date format error in .csv file for a specific time periods.
I have a file where data is stored on monthly basis from the years 1976 uptil today. I have all the data months in expected format except for the years 1989, 1990 and 1991. These files are created by using Informatica and SAS.
For example:
Expected date format = 1-January 1989
Actual Date Format = 1-Jan-89
This issue doesn't exist when we open the same file in Excel, Textpad and Notepad.
I have attached screenshot of the data (filename: CSV Issue.JPG).
View 7 Replies
View Related
Jun 6, 2008
I haven't had issues with vlookup on other worksheets, but this one is giving me trouble. I have attached the excel file for your consideration.
The lookup value is in cell U2, formatted as a date
The table array is V2:Z19
The column index number is 2 for C3
False lookup
I've tried the formula with and without the text function for the date and I've also tried different formats for the dates in columns V to Z because I know the format of the cells have to match for vlookup. It is very frustrating because this should be simple, but it is messing up.
View 2 Replies
View Related
Oct 13, 2009
I found the following code someware on the forum and have been using it for a while and it has been all good, however when I went to use it today it is coming up with Runtime error 1004 and highlights Range("H1") =MyDate.
View 2 Replies
View Related
Sep 23, 2011
Here is the data I am working with. On another sheet, I want to count the number of entries on Total requests sheet if Column M - Closed < Column Q - End Date. There is other criteria and I have this, which doesn't work: Run-time error '1004' Application defined or object defined error. I think it is due to the part where I'm working with the dates...
======================
ActiveCell.FormulaR1C1 = _
"=COUNTIFS('Total Requests'!R2C3:R" & tot_req_row & "C3,RC1,'Total Requests'!
R2C10:R" & tot_req_row & "C10,""5-Very Low"",'Total Requests'!R2C13',""
View 2 Replies
View Related
Dec 18, 2013
I developed a program which uses Date function in several places. Problem is that on some machine this function is not working and I'm getting compile error.
What is the reason for that. Is this a system setting??
View 9 Replies
View Related
Feb 18, 2013
I have a spreadsheet with a column full of dates
I used the formatting wizard to make all dates the format of dd/mm/yyyy but, now, when I put a date in the column it throws up a number '41313' instead of a date, even if I manually input the date in the same format as above.
Also, I have tried to turn cells back into general number fields, but this doesn't appear to be changing it back to a date format..
There are HUNDREDS of dates I might have lost if I can't get them to start showing as dates again!
View 2 Replies
View Related
Aug 21, 2013
I have an issues with a formulae I have written to measure two factors;
A; How many different countries appear within a certain date range. B; What countries are they.
I tried a unique list, but could not get it to work within a range? I dont particuarly care how the data is pulled through as long as I do it. At the moment I have become stuck in 'Unique Ranges' and have n given up?
The formulae issue is in the tab "Problem_Formulae", the dat in the sheet 1, and the date ranges in sheet 2. Also, just to make life a bit more challenging pivot tables are a no go .
View 6 Replies
View Related
Sep 28, 2011
I have to generate a report using a pivot table, that tells me what work was done on time and what was late. Entering a formula outside the pivot table sees the scheduled start date drop downs as "blank" and says they are late when they are not. I cannot seem to use the value fields when I try to create a calculation field within the table. I use 2010 at work, 2007 at home.
sep 11-17
FGHIJK10Count of WO No.
=IF(G12>=H12, I12," ")=IF(G12
View 3 Replies
View Related
May 26, 2014
I having problem to determine the format value of dates that needs to be inserted in a Userform.
I have the following format in my userform for my Textbox:
[Code] ......
When I select the calendar in my userform that is set as follows:
[Code] .......
And select the first day of the month, it will always add the format as 05/01/2014 but if I select today’s date as example it will add it in the right format: 2014/05/26
I have included a sample to demonstrate the function of the calendar as I have declared it public as d in a module, therefore making the population of my userforms textbox easier to add information on dates.
Calendar.xlsm
If you add 2014/05/01 - 2014/05/26 and 2014/05/06 you will see where the system is having problem with the month and dates I guess the system confuses the two?
I need the format as follows: yyyy/mm/dd
View 2 Replies
View Related
Mar 20, 2012
Formating Date Issue
--
Excel or Access version:Excel 2010
Computer operating system:Windows XP
Sample data:No sample data
Formula(s) right now:Mar-5-2012
Current result(s):Mar-5-2012
My goal:To convert the above text into a date format.
Error message:Can't format the way I want it.
How error occurred:No error message
Generated in:Excel
View 3 Replies
View Related
Oct 1, 2006
I have the following
Private Sub Workbook_Open()
Worksheets("Sheet1"). Range("L5").Value = Date
End Sub
When i try and run the code it returns an error saying: "Compile Error, Cant Find Project Or Library" and it highlights the word "Date"
View 7 Replies
View Related
Feb 9, 2010
if you look at attachment, in Cell J2, if cell I2 is greater than 2 minutes but less than two minutes, the I need the value of I2 in Cell J2 otherwise 0:00:00 then K2 between 3 & 4 Mins and so on.
View 5 Replies
View Related
Jan 27, 2010
I am making a spreadsheet that tells us the following information about prints that we do:
View 6 Replies
View Related
Feb 2, 2010
I have attached a sample file. All the data is inserted into this file via a text file, except one column "G". Someone in this forum was kind enough to help me in being able to include the city name 'G' to a parcel number 'A'. However, the page is constantly trying to complete 'Calculations' and won't let me do anything without first hitting 'Control Break'.
This is fine except that when I try to save the file into .txt, I don't have the option of 'Control Break' and I have to end up closing the file. As the 'real' file has over 100,000 rows, nothing happens very fast. I have tied changing the 'Calculation Options' but that doesn't seem to change anything.
View 7 Replies
View Related
Jul 11, 2012
Is it possible to have an input box for a range of calculations and then in my formulas set the range to anchor + variable ?
Something roughly like:
Range = 20
Product( F13:F & Range_Variable_Cell_Value)
View 2 Replies
View Related
Mar 19, 2007
I'm working working with this spreadsheet that is moving incredibly slow. Every time I enter anything, it takes anywhere from 10 seconds, to a couple minutes to calculate and let me proceed. It is a pretty big file (4.60 MB), but I also work with another spreadsheet that is a little smaller (2.95 MB) that has never taken more than a fraction of a second to calculate anything. What could I do to spead up the spreadsheet?
View 9 Replies
View Related
Sep 15, 2007
My problem is the following:
I'm trying to model straight line depreciation over 5 years for certain investments. This could for example be done like this: ....
View 9 Replies
View Related
Sep 2, 2008
Does anyone know of a site or some code that can make changes to add some items to the status bar calculations?
Such as right now you have Sum, Count, Count Nums, Max, Min... just to name a few.
I'd like to be able to add some other ones down there if it can be done. I'd like to count #N/A's or possibly sum only positive numbers? I can do it with a quick keyboard shortcut and message box with a macro, but I'd like to just be able to highlight a range and have it show up like sum or the others do.
Just thought I'd psoe the question.
View 9 Replies
View Related
Feb 21, 2009
im in the process of designing a userform but it needs to have some calculations in it, and im lost on how to do it if anyone can help
ie
in textbox1 there is a value of 5 and in textbox2 there is a valuve of 10 and in text box 3 i want to appear textbox1 multiplied by textbox2 so 50 should appear
this is a basic example but as soon i have mastered that i can adapt everything else to my userfom
will the above be done automatically as soon as i enter values or would i have to "make the calculation" via a button or something
and also i want to have a enter button or something like that that copies the data that i have put in the various text boxes to the excel spreadsheet and clear the userform cells
phew thats best i can explain any questions just reply to this post as per the norm
View 9 Replies
View Related
Feb 21, 2010
I have inventory... with starting product at a certain cost, received product at a new cost, and used product. I want to assume that we are using FIFO.
What I need is a total cost (what I have paid) for what is sitting in my freezer.
Column A is START (5)
Column B is RECEIVED (6)
Column C is USED (2)
Column D is END (9) or (A1+B1-C1)
Column E is OLD COST ($12.20) cost per unit of those 5
Column F is NEW COST ($13.50) cost per unit of the 6 i got in
So I need in Column G a FIFO formula for total cost of what I have in the fridge.
View 8 Replies
View Related
Mar 19, 2007
can i hide all calculations inside my excel document? I wish to provide some excel worksheets but must protect the calculations performed for privacy reasons. I would still like to enable clients to sort tables, change pivot tables, etc but not to see what calculations are used.
View 3 Replies
View Related
Oct 4, 2007
I dont know if that is the correct title to use but here goes. I am trying to help my friend with some work that he is struggling with.
We have a model where we can change the % of the Service Level in field E8 and it will tell us the number of people required within field E17. Is their a way we can reverse this by creating another spreadsheet where we could put in the number of people we have for it to tell us the service level that would reach?
View 9 Replies
View Related
Jan 19, 2008
I have a Userform set up and I have a combo box which I have filled with options using the With Combobox.add method with 5 choices; Minutes, Hourly, Weekly, Monthly & Yearly.
I want these choices if slect to represent a value to make this easier say if minutes is slected the value would be 1, hours would be 2 etc..
I want this choice to be stored as a variable say time, which can then be later used in a calculation which is run when I run my main program based on this selection.
View 4 Replies