Calculate Number Of Week And Days Between Two Dates?
Sep 28, 2011Any example of counting the # weeks/days between two dates?
View 1 RepliesAny example of counting the # weeks/days between two dates?
View 1 RepliesI am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.
I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).
The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.
Subtract Days.xls
I'm really looking for something that will subtract week days, not count them.
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
View 2 Replies View RelatedI have a start date formatted as dd/mm/yyyy in cell A5
I have an end date formatted as dd/mm/yyyy in cell E5
In cell F5 I would like the result of the number of days between E5-A5 (Excluding weekends)
In cell G5 I would like the total number of days in the range F5:F25
In cell H5 I would like the total number of working days from A5 to Today
I am using the following formula to get the result in F5 etc
=SUM(INT((WEEKDAY(A5-{2,3,4,5,6})+E5-A5)/7))
I have copied this down and in the blank cells I get #NUM!
In cell F? were there is no date entered in cell E? I get a minus number (which I can hide using conditional formatting), but the minus number obviously has an affect on the result in G5, as cell G5 gives me #NUM! instead of the result for the current numbers in row F
How to create a spreadsheet with what I think will be a very simple formula?
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 7 or less days but more than 1, put a 2 in cell C2.
If date in B2 - date in A2 is 30 or less days but more than 7, put a 3 in cell C2.
If date in B2 - date in A2 is 90 or less days but more than 30, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
OR
Another, maybe simpler, way of saying it is:
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 2-7 days, put a 2 in cell C2.
If date in B2 - date in A2 is 8-30 days, put a 3 in cell C2.
If date in B2 - date in A2 is 31-90 days, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
I'm looking for the formula to calculate the number of winter days between two dates.
Say, that I'm having:
- Winter season start date (say Dec 1st)
- Winter season end date (say, March 1st)
=> All the days which are between these two are considered winter days for any given year.
- Two different dates defining the beginning and the end of my PERIOD. The total length of the period may be more than one year.
HOW do I calculate total number of winter days for the PERIOD?
I'm new here. I've searched these forums in the past for help, but never had to post, i've always been able to find something by searching. However, this time I couldn't find anything that addressed my specific need so I figured it'd be worth a shot.
Alright, I have two sets of dates, and i'm trying to set up a formular that calculates the numbers of days from the first date range that overlap/fall within the second date range.
For example:
In A3 type "1/1/2006"
In B3 type "1/1/2007"
In C1 type "6/30/2005"
In C2 type "6/30/2006"
Now, in C3 i'd like to insert a forumla that tells me how many days in the date range of 1/1/2006-1/1/2007 fall in the date range of 6/30/2005-6/30/2006. Basically for this is should be half the year, however many days that is.
Is this possible with a formula?
I have been using Excel to display, sort and present data in a professional way. I have created a pivot table with two columns below. Column C indicates the start date. Column D indicates the completion date. Blank cells show live data. I need to determine the number of days. 1) That have been - completed - a) That were < 2 Days, b) >2 but less than a week, c) > than a week (all). I have used the following formulas. a) countif(D4:D61, "<3"), b) countifs(D4:D61, ">2", D4:D61, "<=8"). Easy for completed data. My problem is, how do I determine the number of days, live data that following the same queries as above. I have figured out I can use countif to count the number of blanks by - countif(D4:D61, "(blank)") but how to put it all together and what formula should I use. I am trying to use countifs or if statements but am totally lost.
Column C Column D
---------- ----------
06/01/2014(blank)
25/11/2013(blank)
13/12/201314/01/2014
27/12/201317/01/2014
27/12/201310/01/2014
I have two date columns, a start date and end date. Another columns tells me the number of days between these two columns. It may return 45 days which actually straddle 3 different months.
My aim is to identify between this date range how many days in Apr 14. Then in the next column howmany days in May 14 etc
So on the spreadsheet Id have 12 columns for each month of the year. in Apr 14 for each row between the given date range I want it to tell me how many days are actually in April. Id then copy that formula into the May 14 column.
I was calculating the number of days between two dates using the Days360 function. However, now it is not accurate enough for me... Is there a function that is more accurate? based on 365 days and includes leap years... that I could use as I need this calculation to be exact? For example, number of days between April 1st, 2010 and August 31, 2012 is 884, but the days360 function returns 870.
View 4 Replies View RelatedI'm trying to calculate the number of days between dates in column A and B. I've looked at the examples in this site and thought I used the formula correctly, but the cell returns an error message when I type: =DATEDIF(A1,B1,"D")
View 7 Replies View RelatedI have 2 Columns of Holiday Dates (Column A is the "FROM" date; and Column B is the 'TO' date) and Column C is Peoples Names corresponding to the Holiday dates:
ie:
COLUMN 1 ; COLUMN 2 ; COLUMN 3
A1= 2 Jan 13 ; B1= 10 Jan 13 ; C1= Tom
A2= 4 May 13 ; B2= 10 Jun 13 ; C2= John
A3= 7 Jul 13 ; B3= 10 Jul 13 ; C3= Tom
A4= 3 Aug 13 ; B4= 25 Aug 13 ; C4= John
A5= 6 Dec 13 ; B5= 15 Dec 13 ; C5= John.
I am trying to figure out a formula (eg SUMIF) to calculate and summarize the number of Days Holiday based on a person's name (eg Tom's total Number of days Holiday days) based on the above column configuration of Dates and Names.
to calculate no.s of workdays between two given dates,
1.We work 06 days a week (so only Sunday is OFF)
2.What if I have some holiday between the given dates + Sunday OFF
In one column I'll have a list incrementing in 1w,2w,3w,1month and I want to be able to count the number of days that have elapsed till the latest cell. Right now I'm just winging it by saying there's always 31 days in one month using a COUNTA function, but I need it to be accurate.
View 9 Replies View RelatedWithin a user entered range of two dates, I would like to identify the individual calendar date(s) and count the number of Mondays which fall within the specified date range.I will eventually be using the same "Monday" code to find the same data for every day of the week within the dates ranges, but I figured I'd start with Mondays and build from there.
For Example: Date range 1/1/2013 - 1/15/2013 (date ranges could potentially encompass a full business quarter) Within the range, list each of the dates as dates. (used for comparative counting purposes elsewhere in the document)Count the number of Mons, Tues, Weds, Thurs, Fris, and Sats within the date range.Based on the example date ranges above; Mons = 2, Tues through Sats = 3 each.
I am trying to get a formula that will give me the number of days remaining in the week. I have a formaula for number of days until the end of the month and number of days until the end of the quarter, but just need the week.
So if the formula was run today it would show 4 as the result.
I need to calculate the number of days between a string of dates in Column A. There will be blank cells in between the dates and I need to ignore those blank cells. I'm trying to use this formula: =DATEDIF(A13,A15,"d") but it returns an error with a blank cell in the string.
View 4 Replies View RelatedMy sheet looks like this - example:
ID Dates CombinedAverageDaysFromID
0001 2012-02-01 ?
0001 2013-08-10
0001 2013-10-10
0402 2011-01-02 ?
0402 2013-01-05
0402 2013-01-22
0003 2009-02-04 ?
0003 2009-12-04
0003 2010-01-04
0003 2010-03-03
0003 2010-08-02
0003 2012-04-04
0003 2013-01-05
0003 2013-10-03
I need to calculate the average days between the dates for each ID? How do I do this?
i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
I am looking for formula to calculate the dates between two days (excluding the weekends)
I am working in Saudi Arabia and the weekend days over here are thursday and Friday.
I am attempting to get the formula in Column "E" (see attached excel file) to work based off the individual reps 'days off / holidays' (Columns K:P (or more as needed) that they might have. the formula I am using (which works fine) is:
=IF(C2=D2,0, SUMPRODUCT((WEEKDAY(ROW(INDIRECT(C2&":"&D2)),2)={2,3,4,5,6,7})*(COUNTIF($K$2:$S$2,ROW(INDIRECT(C2&":"&D2)))=0)))
My issue comes up when I am coping this formula for say 100+ rows. When I copy the formula to all of the rows, the (COUNTIF($K$2:$S$2) becomes static and does not realize that the row (ie. Row 26 Rep C) has different days off than Rep A. I can manually change the reference for the countif to specify the correct row to their own days but that becomes tedious very quickly. I was wondering if anyone has come across a way to make the countif work based off of that the name in Column B matches the name in Column G then looks 'to the right' and uses the 'days off' that are listed for the corresponding Rep. I have tried a few different ideas but nothing has worked so far.
Daily i import sheets into excel and the sheet name is uniformed to the following
20061017_BNKREC - 20061018_BNKREC - 20061019_BNKREC ..........
just for clarity purposes
[2006] = year, [10] = month, [17] = previous day, [_BNKREC] = report type
I'll be creating a graph to which shows account balance by week, by account.
The data will be coming in daily. i know i will need to create either a dynamic range or copy my data into a new sheet. My head is spinning because i need excel to somehow (either in a formula or VB) determine what WorkingWeek the sheet is in. I dont want to have to keep adjusting formulae or ranges when import a new sheet..
bare with me here as its hard to explain ................
I have two processes that has to run depending of the week number of the year. So even weeks has to run "sub 2" and odd weeks has to run "sub 1".
Weeks with number 1,3,5,7,9,11,13,15 etc has to call "sub 1" and weeks 2,4,6,8,10,12,14,16 etc has to call "sub 2".
The filenames consist of "name_name_YYYYMMDD.xls" (example: SteveSmith_Runningshoes_20140719.xls)
So vba needs to calculate the week number by reading the YYYYMMDD of the filename and then call the correct sub.
I have a drop down box that chooses the week number of the year (This is based off of a series of data from another sheet).
I need some kind of formula that calculates the following Friday based on a week number. Say for this year (2012) The following Friday for "week 1" is 1/13/12.
(This is for payroll information and I'm trying to calculate the pay date based of of data from that week)
Of the 52 weeks in a year, I want to know the week number that a date falls in, e.g. date - 05/08/2013 falls in Week No. 32. What's the formula to get this answer?
View 2 Replies View RelatedMy spreadsheet is set up so that Column A has dates and Column B has a value. How can I calculate the total number of values for each day of the week? I've tried a few formulas but they either didn't work or didn't actually take the value into consideration and just counted all the 'Mondays'. I'm not sure if that's clear enough, but if we're just looking at Mondays to simplify it:
Monday, 1 January 2000: 2
Monday, 8 January 2000: 5
Monday, 15 January 2000: 0
Mondays: 7
We have started a new venture from 5th April & I need to create a template for a year and assign week no against the dates. The week1 will start from 5th April & week 52 will end on 31st March.
Also there will be a summary of the Week No(Starting Date & End Date) against each week at the top of the template. I could put the formula for the summary part but I am unable to figure out how to assign week no against the dates as given below. It is very difficult to assign the week no manually for the whole year & also it is vulnerable to error. a formula across B7:B23 which can deliver the desired result?
Sheet2 ABC1Week NoStart DateEnd Date2Week15-Apr8-Apr3Week29-Apr15-Apr4Week316-Apr22-Apr5 6DateDesired
Result 75-AprWeek1 86-AprWeek1 97-AprWeek1 108-AprWeek1 119-AprWeek2 1210-AprWeek2 1311-AprWeek2 1412-
AprWeek2 1513-AprWeek2 1614-AprWeek2 1715-AprWeek2 1816-AprWeek3 1917-AprWeek3 2018-AprWeek3 2119-
[Code] .........
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
I would like to use vlookup to calculate the number of shift per week for each agent
View 10 Replies View Related