Dates In Excel And Days Remaining In Quarter
Dec 2, 2009
How to determine how many days are remaining in the quarter after I provide it a specific date. Ultimately I am trying to build something where if I enter a date it will break down how much it will contribute for the remaining current quarter and for one full year (on a quarterly basis).
For example lets say I buy gumball machine today and I know that it will contribute X dollars for 2009 and X+1 dollars in 2010. I would like to break it down quarterly and have it say - you will get X for the rest of the quarter in 2009 and X for each quarter in 2010.
View 3 Replies
ADVERTISEMENT
Feb 13, 2013
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
Input Data
Result
Start Date
[Code]....
View 3 Replies
View Related
Oct 7, 2013
How would you calculate the amount of days of a billing period for a consulting engagement by quarter when the engagement could span multiple quarters, be within a quarter or not be in a quarter at all? Project based billing
View 1 Replies
View Related
Sep 1, 2007
I'm basically looking for a forumla that will count each employees total scheduled work days for the month inserted and then depening upon the day it is will show how many days the employee has left to work for the month.
View 9 Replies
View Related
Jul 31, 2013
I am trying to get a formula that will give me the number of days remaining in the week. I have a formaula for number of days until the end of the month and number of days until the end of the quarter, but just need the week.
So if the formula was run today it would show 4 as the result.
View 9 Replies
View Related
Nov 15, 2007
I have a worksheet containing 5 columns. A start and end date, a number of days between these dates, the quarter number of the start date (i.e. 1 to 4) and then the year.
I want to calculate the average number of days per quarter so an average of days in column C, based on the details in column D and E.
View 11 Replies
View Related
Apr 1, 2009
A1, B1, C1 and D4 are cell in Excel worksheet and values are 2, 4 and 6 in A1, b1 and c1 respectively.
A1 B1 C1 D4
2 4 6 C1-Formula is: =sum(A1+B1)
Now I have to write formula for D4-cell:
i.e. =sum(C1/Total days remaining of the month)
Suppose Today is April 01, 2009, C1/should be devided by 30,
Tomorrow will be April 02, 2009, C1/should be devided by 29.
View 10 Replies
View Related
Apr 9, 2009
how i can fix the formula below to show the number of remaining days between the given date and the current date.
View 3 Replies
View Related
Jan 27, 2014
I'm looking for a formula that will return the time left to a birthday, in Month and Days.
View 5 Replies
View Related
Oct 30, 2013
I'm currently trying to set up a sheet ...
When setting up a Direct Debit There are 3 options, the 7th, 17th and 27th. I've put these into a drop down list. I need this list to be slightly dynamic. I must allow 10 working days from the date of the arrangment before I can apply the DD.
To explain further. If someone were to want to set up a DD and spoke to me today. If they then requested the DD be taken on the 7th, I wouldn't be able to set it up until the 7th of December as 10 working days are required. I'd like the list to reflect this. I can do it in OO with a simple if / switch but excel is a strange creature and I'm not sure how to approach the problem.
From that I think I also need to calculate the number of weeks remaining in the current financial year. I think I should be able to do this by using the Today() function and some maths.
View 1 Replies
View Related
Jan 19, 2009
I am trying to create a "daily donut" to track how long it has been since I left for my current deployment, and how much time I have left until I return home. I would like to show exactly how many year(s), month(s), day(s), hour(s), minute(s), and second(s) (like 1 year, 4 months, 4 hours, 5 minutes, & 34 seconds not 1.0 year, 0.33 months, etc.) it has been (again, not 3600 seconds, 60 minutes, 1 hour, etc.), and how many I have left. I have spent many hours trying to figure this out, and I have even tried looking through this forum, but I still can't completely figure this out. I was close in figuring out the date differences in the x amount of years, months, and days format, but it wouldn't account for the time. I.E., 06/03/09 05:00:00 AM - 06/01/08 06:00:00 AM, would show 2 days, instead of 1 day (I'm not sure how to incorporate the time yet).
The variables are:
A1 Date I Left For My Deployment in M/DD/YY HH:MM:SS AM/PM
A2 =Now() Function in Same Date & Time Format as A1
A3 = Date I Get Home from My Deployment in Same Date & Time Format as A1
Any ideas or help? And if possible, I would like to be able to do this using excel's built in functions (not excel add-ons, vb, etc.), so that it would work on government computers.
View 9 Replies
View Related
Mar 13, 2014
What I want to be able to do is,,press the Q key and either Q1, Q2, Q3 or Q4 based on certain parameters appear in that cell.
In column A of my spreadsheet heading 'Quarter', I want to be able to specify which quarter of the year a request was made,,so when I press Q
> if the date is within 01/01/14 and 31/01/14 'Q1' will appear
> if the date is within 01/04/14 and 30/06/14 'Q2' will appear etc,,I'm sure you can workout Q3 and Q4,,
Ive named a cell A1 'TODAY' for reference it has the formula =TODAY() in it and shows whatever the date,,
I have looked at the DATE commands available but I don't think any could do what I need, that's why I was thinking I needed a piece of VB code,,
View 2 Replies
View Related
Oct 21, 2013
I have a list of dates and want to convert them to something like Monday 21st October instead of 21/10/13.
I am sure this is easy but cannot see how to do it. I am on Excel 13.
View 4 Replies
View Related
Feb 1, 2007
My dates are coming up in serial format even though I have the cells formatted to date. It doesn't matter which date format I select they all remain as serial dates.
View 4 Replies
View Related
Nov 22, 2011
I am trying to figure-out how to set up conditional formatting of dates in a column (e.g. Date Submitted) and have these dates, and/or cell, change color as time progresses. I have Excel 2007.
For instance I have an application submitted on 11/20/2011 in a cell. I would like to have the date change color (Yellow) after 30 days have passed.
Then do the same except change to Red after 60 days have passed the date.
I searched the forums and did not find this particular problem. I of course may have missed it too...
My guess was to try "$A$1
View 4 Replies
View Related
Oct 30, 2009
I'm trying to figure out how to identify higher earnings in a quarter and return the max of the quarter of time frame and not the value
I'm simplifying a little ...
View 9 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Mar 14, 2014
I am making process TAT(Turn Around Time) which required following information. In Excel 2007.
1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays
2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays
Note : Any weekend (off days) dates listed in holidays should not effect the query.
View 9 Replies
View Related
Jun 16, 2008
I have been using: =DATEDIF(A1,B1,"md") & " days" to calculate the difference, in days, between two dates in a speadsheet, however, the number of formulae in the spreadsheet now is cumbersome so I'm trying to put it together in VB.
View 2 Replies
View Related
Jun 4, 2014
So, it is for a hotel, I need to know to know between a Check-in and a check-out date, each day (monday, saturday) there is. In depending it is for one night or 12.. I will try to be clear: Depending on the channel of booking and the day of week we have a % of commission different. so I want to put the price in one cell and it is calculate for each date in order at the end I have the right net profit (because the right commission has been applied). Of course to complicate the commissions do not apply in the same order depending the channel and there are fixed costs which are count one time or repeat by the amount of nights. For the these things what i did seems work.
After, my boss would like to link the dates with another excel file which say for each date which "level of price" (price point) is applied and function of this Price Point we have the price applied per room type and offer
But for now, I didn't find anything what can say to me between 2 dates what dates are between...
View 2 Replies
View Related
Jun 18, 2014
How to find the difference between 2 dates in days ,eg,12/10/14 and 14/10/14 = 2 days on a spreadsheet.
View 4 Replies
View Related
Oct 9, 2007
a count formula.
Right, Column A on my sheet is the date that the work was completed. First thing is I need to be able to count how much work was completed per month. (I dont know why we have it all in one big sheet rather than monthly sheets but thats too logical!)
Secondly, column I is the number of days that piece of work took to complete. I need to be able to have a formula that looks at the month the work was completed, then total up the number of days that the work took.
(Example, if I have three bit of work completed in October, 1 took a total of 20 days, 1 took 15 and 1 took 10 it would = 45 days)
I know that this should be possible as I've had Excel doing more complex formulas than this.
View 14 Replies
View Related
May 24, 2007
I have a start date (say 01/04/07) and I need to add a number of days to it to get the start of the next financial period. Unfortunately, I need to ignore a small list of dates (bank holidays, etc).
View 9 Replies
View Related
Nov 10, 2008
I am trying to set up a function to derive a number of days between 2 dates.
Within the table I have an on hire date, and off hire date, and an optional suspend hire date range in 2 other columns - ie. there are 4 columns with dates in.
On hire is in column B; offhire in C; suspend hire in G and recommence hire in H. The optional suspend hire date range will always fall within the main hire date range.
Column I calculates the number of days for the suspend hire period.
My key cut off date is in cell C4.
There are 3 different scenarios I need the function to cover.
1 - if the cut-off date (in C4) is later than recommence hire, calculate the number of days from hire start to cut-off date, less suspend hire period days.
2 - if the cut-off date (in C4) falls within the suspend hire period, calculate the number of days from the hire start to the begining of the suspend hire period.
3 - if the cut-off date (in C4) falls before the suspend hire period, calculate the number of days from the hire start to the cut-off date.
This is the fuction I have written:-
=IF($C$4>H10*($C$4-B10-I10),
IF(AND($C$4>G10,$C$4
View 9 Replies
View Related
Apr 8, 2009
I have a formula in column E: =NOW() for the date.
I need a Formula in Column H from H11:H300 such that:
i) when a date is entered in G11 the number in Cell H11 should be a difference between G11 and D11 as in rows 11, 13, &14 and
ii) Until a date is entered in cell G11 the difference should be between E11 and D11 as in ROW 12
Below is an example of what I want.
D E F G H8 Date Days9DateStatus as of Expected ActualTOTAL10out of order8-Aprin orderin order114-Mar8-Apr14-Mar101210-Mar8-Apr29134-Mar8-Apr6-Apr33141-Mar8-Apr31-Mar30
View 9 Replies
View Related
Apr 13, 2007
vba excel?
I wish to calculate the days between the starting date (column A) and ending date (column B). For the first 7 days are excluding all the holiday and weekend and the rest of it until the ending date are counted.
View 9 Replies
View Related
Jul 3, 2007
I couldn't find a solution to my problem in the forum: Is there are formula that will allow me to calculate number of days between two dates? The date format is eg. 07/06/07
View 3 Replies
View Related
Jul 25, 2007
I have a simple formula to work out the number of dates between to dates
ie: =U6-T6
This works out the days between 9 may and the 31may as 22 days
but i want to show the correct number of days including the 9may so this would be 23 days.
I tried this =U6-T6+1 which was fine but all the empty cells now show the value 1 in them.
View 5 Replies
View Related
Aug 20, 2007
I am trying to create a spread sheet in excel that will show a number of days past due counting from the due dates. see the attached xls file for details.
View 5 Replies
View Related