Apr 9, 2009how i can fix the formula below to show the number of remaining days between the given date and the current date.
View 3 Replieshow i can fix the formula below to show the number of remaining days between the given date and the current date.
View 3 RepliesA1, B1, C1 and D4 are cell in Excel worksheet and values are 2, 4 and 6 in A1, b1 and c1 respectively.
A1 B1 C1 D4
2 4 6 C1-Formula is: =sum(A1+B1)
Now I have to write formula for D4-cell:
i.e. =sum(C1/Total days remaining of the month)
Suppose Today is April 01, 2009, C1/should be devided by 30,
Tomorrow will be April 02, 2009, C1/should be devided by 29.
I'm basically looking for a forumla that will count each employees total scheduled work days for the month inserted and then depening upon the day it is will show how many days the employee has left to work for the month.
View 9 Replies View RelatedI have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.
For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.
I want to have a column that will show the length of employment for a list of employees. I have a column for each employee already listed as their hire date. What I want to do is have the next column indicate how many days that employee has been on board.
I know about the =Today() and =NOW() and would assume I need to use this somewhere this way every time the spreadsheet is opened it would update the length of employment.
i'm working with a macro i'm putting together that basically needs to add 5 days to the current date to insert it into a cell on the data sheet. my current code is like this:
'Insert Date Information
Dim vDate As Date
Range("D2").Select
ActiveCell.FormulaR1C1 = Format(Now, "mm.dd.yy")
vDate = ActiveCell.Text
' Get Date info
Dim vDate2 As Date
vDate2 = Application.InputBox(Prompt:="Type in the due date for the location." & Chr(13) & _
& Chr(13), Title:="File Name")......................
I've got a spreadsheet that gets its information from outside of Excel. The Date comes across as a number stored as text. I need to some how calculate the amount of days between this imported date (Settlement Date) and Today's date.
View 4 Replies View RelatedI currently have a sheet that shows monthly tasks and their due dates. There is also a control that when clicked, resets the due date to the following month of the same day.
What I would like to do is setup some type of reminder such as either flash the due date cell if possible or change the fill color. It should do this when the system date is = to or 4 days before the due date.
The only way I can see doing this is using VBA, which I do not know very well.
How do I get cell B1 to show only the date that corresponds with the current date?
ex.
A1
15-Nov
26-Nov
29-Nov
2-Dec
4-Dec
4-Dec
5-Dec
6-Dec
If I enter 12/2, in one of the rows in column A it will display today dates in cell B1 since today is 12/2, but when tomorrows comes, since there is not a 12/3 date in column A, B1 cell will be empty, but when 12/4 comes, cell B1 will show 12/4 since that is a 12/4 date
I am trying to get a formula that will give me the number of days remaining in the week. I have a formaula for number of days until the end of the month and number of days until the end of the quarter, but just need the week.
So if the formula was run today it would show 4 as the result.
I have a similar issue, but it's with a date field. Every day, I go in and check the current day to show the current days data(on a Pivot table). Is there a way to modify this code so the AutoFilters update and "check" up to the current day?
View 2 Replies View RelatedHow to determine how many days are remaining in the quarter after I provide it a specific date. Ultimately I am trying to build something where if I enter a date it will break down how much it will contribute for the remaining current quarter and for one full year (on a quarterly basis).
For example lets say I buy gumball machine today and I know that it will contribute X dollars for 2009 and X+1 dollars in 2010. I would like to break it down quarterly and have it say - you will get X for the rest of the quarter in 2009 and X for each quarter in 2010.
how to make a date automatically show up in the current year.
For example, if A1 = 6/2/2005, and I want B1 to equal that same month and day, but 2011... How can I do that?
I know =6/2/2005 + 365*6 would work, but the date in A1 will vary... so it has to be a way of showing ANY date with ANY year with the same month/day but current year.
I have a little problem (but for me is like a break); I want, when I change some in a cell, in the other cell, show me current date. I try with "today()", but , next day when I open that workbook, in that cell, show me the date coresponding with the next day (normaly).
How ,I can rezolve this? I want to blocked that cell, only view, but no acces for change enithing.
I'm looking for a formula that will return the time left to a birthday, in Month and Days.
View 5 Replies View RelatedI am trying to write a formula that will have the cell display todays date if it is after 2:00PM, and if it is before 2:00PM I need the cell to display Today()-1. I have tried several iterations and I'm stumped.
View 5 Replies View RelatedI would like to be able to track progress of various tasks/occurences by allowing users of a spreadsheet to just click in the appropriate column and in doing so, it would fill in the current time and date. I.E. Column headings would read, "Item Sent to Review", "Item Received From Review", "Item Sent to Specialist", etc. and I want users to be able to double click in a given column to populate with current date/time information,
View 7 Replies View RelatedI would like to have a student's current overall grade be automatically calculated and displayed as I enter the test scores and extra credit points over the semester, first in percent and then in letter grade.
I have it set up so that the percent is calculated based on the total number of points likely to be obtainable at the end of the semester. But if they have only taken two tests and one extra credit assignment, it takes the total of those and divides it by the semester's total possible, instead of just the two tests and extra credit total possible. (ps: I do not know how many extra credit columns or number of possible points I will have this early in the semester)
Also, how then do I set up a formula to translate that percentage into a letter grade based on A=90-100, B=80-89, etc.?
I'm currently trying to set up a sheet ...
When setting up a Direct Debit There are 3 options, the 7th, 17th and 27th. I've put these into a drop down list. I need this list to be slightly dynamic. I must allow 10 working days from the date of the arrangment before I can apply the DD.
To explain further. If someone were to want to set up a DD and spoke to me today. If they then requested the DD be taken on the 7th, I wouldn't be able to set it up until the 7th of December as 10 working days are required. I'd like the list to reflect this. I can do it in OO with a simple if / switch but excel is a strange creature and I'm not sure how to approach the problem.
From that I think I also need to calculate the number of weeks remaining in the current financial year. I think I should be able to do this by using the Today() function and some maths.
I was wondering if anyone knows how I could enter a date in one cell, then another date in a second cell and in a third cell have it have it so it minuses the first date from the second and calculates the difference outputted in number of days.
Example: 04/31/08 - 04/01/08 = 30 (days)
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
Basically, I'm doing a recorded macro for work where I take an export and manipulate the data to show differences between sales from last year and this year. Also comparing this months projected sales to avg of last 6 months and also against last years this month.
The problem I'm running into is in automating the this month sales for mid-month exports. I can do it individually but I can't find a formula that will do it. Data is in one cell per month, so ex. 130 sales this month so far. I need to have it convert that to projected sales for total month based on what day it currently is.
I am creating an IF formula that will produce the current date in one cell if another item has been entered in another cell.
For example
cell g (accounts) is blank, cell H (date found).
Once the correct account is entered into cell g the date will autofill in H.
The formula i was using is =IF(G1"",TODAY(),"")
I want a formula to add the number of days to the date
Such as 90 or 180 days for this date 01/01/2014
The portfolio team uses data that is refreshed every Monday. Write a formula to obtain the current week's Monday's date.
View 3 Replies View RelatedI am looking for a formula that looks at a date and could add business days to it.
for example:
If the date in a field is Monday, 15-dec-08 and my formula is to add 5 Business days (mon-fri) to it not including that date. The desired result would be Monday, 22-dec-08 but my formula gives me 20-dec-08
I am creating a tracking spreadsheet and I will need to f/u on a process 30/60/90 days out from a particular date. Example: CPAP Therapy began 1/22/09 and I need to follow-up by 2/22/09. How do I create formula to add 30/60 or 90 days out from the setup date?
View 6 Replies View RelatedHeres what I am trying to do:
I have a due date of 30/10/2007 in cell A2, I would like the cells in row 2 to change to the colour green 15 days before the due date (15/10/2007) and then I would like Row 2 to change to the colour Amber 10 days before the due date (20/10/2007).
This is what I was trying to do but it is not working for me:
____A_______________B__________C
1___Due Date________15__________10
2___30/10/2007______=a2-b1______=a2-c1
The Formula in B2 and C2 work fine.
I was then thinking that I could put a formula in Conditional formatting that says something like
If todays date is equal to b2 then Green else do nothing or If todays date is equal to c2 then Amber else do nothing
I can't figure out the formula for that though.
formula that can automatically use the current month date to extract information from other cells on my spreadsheet.
For example: This formula should be located in cell C6. Cells D6, F6, H6, J6, L6, N6, P6, R6, T6, V6, X6, and Z6 (these cells correspond to the months of the year, January to December respectively) contain the values I need. The month names are labeled above in row five.
Let's say the current month is March, I need the formula in C6 to automatically know that it is the month of March and to pull the information from cell H6 (which is the March cell). Then when April comes along, it will know that it is April and to only pull the information from cell J6; and so on until the end of the year.
My dates are coming up in serial format even though I have the cells formatted to date. It doesn't matter which date format I select they all remain as serial dates.
View 4 Replies View Related