However I do not want to use military time. I can get it to work by =a2-a1 but only if it is 8.5 and 17.5. Any ideas how I can do clock in 8:30 clock out 4:30 = 8 hours?

View 7 Replies


ADVERTISEMENT

Calculation Hours Worked?

Jul 3, 2014

I'm trying to make a way to track if I've worked more or less than the 39 hours/week I'm paid for. At the end of each week, I have a total of how many hours and minutes that I've worked .

On column C I have what I should work.

On column D I have what I did actually work

On column E I'd like to convert automatically Columd D to minutes for calculation purposes

Column F to know if I worked more or less than what I should've subtracting C and E

Column G to have an ongoing tally to know if I need to work more or less

Column H and I could probably be the same thing. Ideally what I'd like is to have a formula pull the information from column G and put it into workdays, hours, and minutes with 1 workday being 7 hours and 48 minutes.

Since I tend to work too much, I'd like to know if I've worked 3 days too much during 1 month, I can take 3 days off the next month to get everything zeroed back to where I don't owe the company anything and vice versa.

View 6 Replies View Related

Overtime Calculation For Time Worked Over 8 Hr Per Day Or Over 40 Hours Per Week?

Aug 4, 2013

My overtime pays is anything exceed over 8 hours per day or over 40 hours per week. Right now I can only calculate overtime by either over 8 hr/day or over 40 hr/ week. I need a way to combine both.

View 9 Replies View Related

Convert Hours Worked In Week To Hours Worked In Month With Formula?

Feb 21, 2013

Is there a way to conver a persons time spent (given in weeks) to adjust/convert to show per month. Attached is the sheet. Do note that week 2/25 - 3/1 is a combination of Jan and Feb so hours should be logically divided into jan and feb...

Name 2/18 - 2/22 2/25 - 3/1 3/4 - 3/8 3/11 - 3/15 Feb mar
Tom 40 10 0 20 ?? ??
name
2/18-2/22
2/25 - 3/1
3/4 - 3/8
3/11-3/15
Feb
Mar

tom
40
10
0
20
??
??

View 3 Replies View Related

Calculate Hours Worked With Lunch / Overtime / Holiday / Vacation And Saturday Hours?

Jan 13, 2014

Lunch is not paid. Holiday and vacation hours get calculated at the regular pay rate. Overtime is anything in excess of 8 hours per day and/or in excess of 40 hours per week and/or over 5 working days per week. Saturdays for most the employees will be overtime because it will be their 6th workday of the week; but it will be regular time for one employee as it will only be his 5th workday of the week.

For accounting and payroll purposes, we need the totals to display in both hour and decimal format.

So far, I have Lunch, Regular and Overtime hours figured out, but I still need to work with Saturday, Vacation and Holiday hours. Also, currently, the time in and out has to be typed in with the colon and AM or PM. Is there another way to input the info without having to type in those items? I'm trying to make it as user friendly as possible.

View 2 Replies View Related

Adding Hours Worked Minus Lunch Break IF Over 5 Hours?

Dec 15, 2013

I'm attempting to make a simple time sheet for a handful of employees. I'd like to enter the clock in time and clock out time for each day. The end cell should be the running total for the week. The tricky part for me is having the formula subtract an hour for each day that is over 5 hours.

View 3 Replies View Related

Calculating Actual Hours Worked Only In Core Hours?

Aug 11, 2010

I have been working on a timesheet but the problem I have come across is calculating actual hours worked only in the core hours and any work outside the core hours is calculated in the outside hours column. A standard work day is 7.6 hours working between 8.30am and 5.00pm. However if someone was to commence work either before 6am or after 8pm this is outside of core hours. I have attached an example of my timesheet for you to see what I am talking about.

View 3 Replies View Related

Time Scheduling: Take Out A 30 Min Break If The Hours Worked Is Over 6 Hours

Jan 13, 2009

I am making a schedule and I would like it to take out a 30 min break if the hours worked is over 6 hours.

I have so far

A B

1 11:00 7:30

=24*(B1-A1)

Gives me 8 hours, I would like it to subtract the 30 minutes only ifthe sum is over 6 and not alter the sum if it is under 6.

View 9 Replies View Related

Pivot For Hours Worked Sum

Sep 24, 2012

Timekeeper to tally total hours worked by employee. When doing a pivot for sum total hours worked for FY13 it does not calculate correctly. I understand they formatted that column/custom h:mm but when I change the 8:00 hours to a number I come up with 0.33 .

I am attaching a sample file : sample time.xlsx

I just want them to get a running total of hours worked/pay.

View 5 Replies View Related

Worked Hours Between Two Periods

Feb 10, 2010

I'm trying to calculate the total hours worked for two given periods over a shift , which can span two consecutive days ie. start 15:45 and finish at 00:15 the next day. Hours worked between 6am and 6pm are paid at standard rate, whilst hours worked between 6pm and 6am attract penalty rates. Hours are cacluated in 24hr time

I have attached a copy of the timesheet that we use so you can see exactly what I'm trying to achieve, and included most of the shifts that we have.

View 14 Replies View Related

Calculating Hours Worked

Jan 1, 1970

I can do the timesheet formula for adding the hours worked as follows:

Start Finish Total
08:45 17:15 8.5

However, it doesn't work when I fill in a whole week work of hours in this format:

Start Finish Total
08:45 17:15 08:30

It works on a daily basis, but when total hours exceeds 24, the formula get's all mixed up - how to I format the total column to account for every 5 minutes worked, which you can't do when converting to decimal??

View 14 Replies View Related

Calculating Hours Worked For 3rd Shift

Nov 27, 2012

Weekly Timesheet.xlsx

This spreadsheet calculates hours worked great for first and second shift but when you enter times for third shift it goes all whacky with the outcome.

View 10 Replies View Related

Track Hours Of Overtime Worked

May 9, 2008

I am creating a spreadsheet that will track hours of overtime worked and within the spreadsheet there are several separate departments listed.

I have made it dynamic so that the summary spreadsheet will update as employees are added. I’m using a macro and some complicated helper cells to be able to sort the employees based on their total OT hours worked.

View 13 Replies View Related

Converting Time To Hours Worked

Mar 15, 2012

Is there a function or a macro to calculate number of hours worked from a single cell value.

For example, cell A1 has "1600 - 1715" and need it to convert to "1.25" on cell B1

View 6 Replies View Related

Formula To Calculate Hours Worked

Feb 24, 2009

I have this spreadsheet and in it the time is changed from military time to regular and then I use a formula to calculate hours worked. On some of these the total is off by one minute. Does anyone know how to fix this?

I don't know how to paste the spreadsheet so you can see formulas,

View 9 Replies View Related

Macro To Calculate Hours Worked

Feb 1, 2007

I need to develop a work sheet for agency booked people to count the number of hours worked by them on daily basis. Agency can clock in at three different times and clock out at 6 different times. i tried but could not even develop logic to calculate the total earned hours. i attached the sheet for reference.

View 5 Replies View Related

Formula To Add Total Hours Employee Worked For Each Day?

Dec 21, 2013

Refer to the attached sheet which is Daily Schedule for employee. I need a formula to add hours worked on single day in cell C2 for Monday, E2 for Tuesday, G2 for Wednesday, and so on.

Every day we have Clockin_Clockout info for each employee as shown for employee a & b.

FYI : I am using below formula to add employee hours for the week as (formula in cell R4).

[Code] .....

View 14 Replies View Related

How To Calculate Hours Worked Using 24hr Clock

Jan 28, 2014

Attached sheet, I am struggling with the formula that will add up the hours overtime worked per day when I enter start and finish times.

Standard working hours are :

mon to thurs 8 hrs per day 8m to 16.30 (with 30 mins unpaid break)
Friday 6 hrs per day
Saturday all hours are overtime

Hours Commited sheet.xlsx‎

View 4 Replies View Related

Subtracting Break From Total Hours Worked

May 21, 2009

This is probably a very simple problem that has me going around in circles. I am attempting to set up a time roster, where I simply want to check:

If "end-time" minus "start-time" is greater than 4:00 (hrs), then deduct 00:30 (minutes) and place that result in another cell.

If it is not greater than 4:00 (hrs) then leave unchanged. I have read thru countless examples on the Forum - but I think that such great learning is driving me mad. Although I do believe that I have the correct format [h].mm - but attempts with IF's have got me confused. This is one of those "Looking down the tunnel towards the flickering light" moments.

View 5 Replies View Related

Productivity Formula: Calculate Worked Hours

Nov 6, 2009

i m trying to work out the productivity of employees based on how many hours they work (Time in Back Office). How many pieces of work they complete(Back Office items Completed) if 1 piece of work should take 7 mins. the item in red is what i cant seem to figure out.

View 5 Replies View Related

Calculate Hours Worked, Minus Weekends

Nov 11, 2009

to calculate how long a ticket is open in our system before being resolved. I don't want to count weekends, and if the ticket is 'suspended', I don't want to count that either. There is also the factor that the ticket 'un-suspend' date may be later than the ticket 'closed' date. Which is the bit that's throwing me.

So, I have the following fields

Ticket Open, Ticket Closed, Ticket Suspended Date, Ticket Unsuspended Date

A sample ticket might be (using above fields)

02/11/09 09/11/09 04/11/09 30/11/09

That 'should' equal two days (16 hours) as the Unsuspend date falls after the close date so it was suspended from the 4th until closure.

Now I want to know, in hours (8 hour day) how long that ticket took to resolve (i.e close), remembering you can't count the time it was suspended, or any time that fell over a weekend. Also not all tickets are suspended.

View 13 Replies View Related

If Statement: Calculates 7.25 By The Hours Worked No Matter What Comes Up In F2

Dec 15, 2009

The whole document works but the last one i need. I'll post it all just in case i have an error elsewhere.

Start Time -- Stop Time -- Break -- Total -- Hours Worked -- Average -- Pay
6:00 -------- 3:00 ------- Yes ---- 1600 -- 8.00 ----------- 200 ------ $xx.xx

E2 Formula for time: =IF(C2="Yes",(((A2*24+12)-(B2*24+24))+1),((A2*24+12)-(B2*24+24)))

F2 Formula for average: =D2/E2. and now for the problem one. G2 Formula for pay: =IF(F2<165, E2 * 7.25, IF(F2<180, D2 * 0.07, IF(F2<190, D2*0.08, D2*0.09)))

Just to break that formula down more:
0 - 164 = 7.25 * Hours Worked
165 - 179 = 0.07 * Total
180 - 189 = 0.08 * Total
190+ = 0.09 * Total

it only calculates 7.25 by the hours worked no matter what comes up in F2

View 5 Replies View Related

Trying To Add Total Hours Worked In Current Month

Jan 22, 2009

I'm trying to figure out what is wrong with this formula. =(SUMIF(Q14:Q4995, "<="&EOMONTH(TODAY(),0),W14:W4995))-(SUMIF(Q14:Q4995, "<="&EOMONTH(TODAY(),-1)+1,W14:W4995)). I've got a cell that adds Total hours worked which pulls from the same column of entered data as the formula above and that cell works. My hours for the month however just shows up as zero. If I try and edit the formula or even just highlight it to copy it and then tab out of the cell this shows up...

1/0/00

If I undo the highlight and tab it will go back to showing zero. I've checked my dates that I entered and they are correct. I'm at a loss as to how to fix this formula.

View 4 Replies View Related

Converting Hours Worked To Number Of Employees?

Mar 30, 2012

I need to create a formula that assumes 40 hours = 1 FTE (full time employee). As an example if I have a total of 100 hrs I need to know how many employees to hire. So in this case it would be 2.5.

View 1 Replies View Related

Hours Worked Based On Multiple IN / OUT Times Per Day

Feb 26, 2013

In a single employee Timesheet spreadsheet:

....................Mon.....Tue.....etc.
In:................6:65.....6:71
Out:............12:07....12:05
In:..............12:62....12:41
Out:............15:66....15:73

Hrs Worked:.....8.46......

How to format the cells in the daily columns and what formula to calculate 'Hrs. Worked'?

View 2 Replies View Related

Automatically Give Number Of Hours Worked

Feb 6, 2007

I'm working with a spreadsheet that works out how many hours someone has worked on a given shift.
In cell C4 I have the formula =E4-D4+IF(D4>E4,1)
In cells D4 & D5 I have an entered number in time format (custom hh:mm)
The problem with this is that when a time is entered in either D4 or E4 it automatically gives me a number of hours worked (upto midnight) without any input in the other.

Aim: Not to show the number of hours worked in cell C4 until hours in both cells D4 & E4 have been entered. NB. Sometimes the start times are 20:00 until 08:00 (night shift) hence answer 10:00.

View 9 Replies View Related

Formula To Calculate Pay Based On Hours Worked

Jul 21, 2006

i am trying to make an excel spreadsheet so i can keep track of my hours and pay at work... i know how to do mult and add but i wanted to know how to do the 2 together.... for example

Hours ST OT Total Hrs Gross Pay

8 2 10 ?

i would like help figuring out the gross pay if say for example my st time rated is 21.21 an hr, and the ot rate is 31.82 how can i get the 8 times 21.21 = 169.68 and the OT 2hrs times 63.64 to show up in the gross pay as a total of 233.32 - what would the formula look like?

View 3 Replies View Related

Calculate Hours Worked When Times Are Spread

Sep 5, 2006

I got a problem with a time calculation, if it's even possible.

I want to calculate the amount of hours that have been woork in a slot.

Example:
First slot is from 08:00am till 17:00pm, time cost 100%
Second slot is from 1700am till 24:00, time cost 110%
Third slot is from 24:00 till 08:00 am, time cost 120%

I'm working from 08:00am till next day 01:00am
So my hours are:
9 in slot 1,
7 in slot 2,
1 in slot 3.

Is this possible to calculate in Excel?

I got a file attached with a sort of layout.

View 8 Replies View Related

Calculating Hours Worked With Overtime Clause

Jul 23, 2007

I need to worked out Hours worked in a timesheet. This was the easy part, the hard part is the clause tha HR threw in, which is:

If you have worked and 8 hour day WITH 1 hr lunch then you qualify for overtime.
if you work a 8 hr day and work through your lunch (1 hour) (so equivelant to 9 hrs) you still do NOT qualify for overtime there for Overtime = 0.

This is cause some people work though their lunch to get overtime, but legally they have to have a break so we are not paying overtime for it. I have basically tried in a formula to replicate this but it works with some data and not with all.
attached is an example, as you'll see the formula works in some cells, but not others.

View 8 Replies View Related

Calculate Hours Worked After Specific Time

Feb 6, 2008

i have a timesheet that we are trying to use. the problem is the column that says shift diff. if an employee works after 6:30pm for 1and 1/2hr, he is entitled to shift hours. shift hours is between 6m and 8am.

As long as he works after 6.30pm but works for at least one and a half hour, he will get the shift.

if work, 9am to 7:30pm, and have break between 2-3pm, should have 1.5hrs shift and 9.5hrs total
if work, 7:45pm-9:45pm, and have break between 8:30-9pm, total hrs work is 1.5 and shift hrs s/b 1.5hrs