Track Hours Of Overtime Worked

May 9, 2008

I am creating a spreadsheet that will track hours of overtime worked and within the spreadsheet there are several separate departments listed.

I have made it dynamic so that the summary spreadsheet will update as employees are added. I’m using a macro and some complicated helper cells to be able to sort the employees based on their total OT hours worked.

View 13 Replies


ADVERTISEMENT

Calculate Hours Worked With Lunch / Overtime / Holiday / Vacation And Saturday Hours?

Jan 13, 2014

Lunch is not paid. Holiday and vacation hours get calculated at the regular pay rate. Overtime is anything in excess of 8 hours per day and/or in excess of 40 hours per week and/or over 5 working days per week. Saturdays for most the employees will be overtime because it will be their 6th workday of the week; but it will be regular time for one employee as it will only be his 5th workday of the week.

For accounting and payroll purposes, we need the totals to display in both hour and decimal format.

So far, I have Lunch, Regular and Overtime hours figured out, but I still need to work with Saturday, Vacation and Holiday hours. Also, currently, the time in and out has to be typed in with the colon and AM or PM. Is there another way to input the info without having to type in those items? I'm trying to make it as user friendly as possible.

View 2 Replies View Related

Calculating Hours Worked With Overtime Clause

Jul 23, 2007

I need to worked out Hours worked in a timesheet. This was the easy part, the hard part is the clause tha HR threw in, which is:

If you have worked and 8 hour day WITH 1 hr lunch then you qualify for overtime.
if you work a 8 hr day and work through your lunch (1 hour) (so equivelant to 9 hrs) you still do NOT qualify for overtime there for Overtime = 0.

This is cause some people work though their lunch to get overtime, but legally they have to have a break so we are not paying overtime for it. I have basically tried in a formula to replicate this but it works with some data and not with all.
attached is an example, as you'll see the formula works in some cells, but not others.

View 8 Replies View Related

Overtime Calculation For Time Worked Over 8 Hr Per Day Or Over 40 Hours Per Week?

Aug 4, 2013

My overtime pays is anything exceed over 8 hours per day or over 40 hours per week. Right now I can only calculate overtime by either over 8 hr/day or over 40 hr/ week. I need a way to combine both.

View 9 Replies View Related

Track / Calculate Overtime Hours - Daily Basis?

Sep 14, 2006

I'm creating an log to track the total number of hours an employee works in one day and calculate regular and overtime hours worked based on the following criteria: overtime will be >8 hours in one day and >40 hours in one week.

Right now I have it 'mostly' figured out, but under certain conditions, it calculates more than 8 hours in one day for straight time. Is there a way to set a maximum value for the straight time cell and have the difference be added to the overtime cell?

View 6 Replies View Related

Convert Hours Worked In Week To Hours Worked In Month With Formula?

Feb 21, 2013

Is there a way to conver a persons time spent (given in weeks) to adjust/convert to show per month. Attached is the sheet. Do note that week 2/25 - 3/1 is a combination of Jan and Feb so hours should be logically divided into jan and feb...

Name 2/18 - 2/22 2/25 - 3/1 3/4 - 3/8 3/11 - 3/15 Feb mar
Tom 40 10 0 20 ?? ??
name
2/18-2/22
2/25 - 3/1
3/4 - 3/8
3/11-3/15
Feb
Mar

tom
40
10
0
20
??
??

View 3 Replies View Related

Adding Hours Worked Minus Lunch Break IF Over 5 Hours?

Dec 15, 2013

I'm attempting to make a simple time sheet for a handful of employees. I'd like to enter the clock in time and clock out time for each day. The end cell should be the running total for the week. The tricky part for me is having the formula subtract an hour for each day that is over 5 hours.

View 3 Replies View Related

Calculating Actual Hours Worked Only In Core Hours?

Aug 11, 2010

I have been working on a timesheet but the problem I have come across is calculating actual hours worked only in the core hours and any work outside the core hours is calculated in the outside hours column. A standard work day is 7.6 hours working between 8.30am and 5.00pm. However if someone was to commence work either before 6am or after 8pm this is outside of core hours. I have attached an example of my timesheet for you to see what I am talking about.

View 3 Replies View Related

Time Scheduling: Take Out A 30 Min Break If The Hours Worked Is Over 6 Hours

Jan 13, 2009

I am making a schedule and I would like it to take out a 30 min break if the hours worked is over 6 hours.

I have so far

A B

1 11:00 7:30

=24*(B1-A1)

Gives me 8 hours, I would like it to subtract the 30 minutes only ifthe sum is over 6 and not alter the sum if it is under 6.

View 9 Replies View Related

Sum Overtime Hours

Mar 19, 2009

I have a report given to me formatted as general. These are overtime hours for 5000+ associates. The time is shown as 4.52 being 4 hours and 52 minutes.

If I sum 4.52, 5.1, .18... I get 9.8 when in fact it is 10hrs 20m. I need this to display as 10.2

In fact I have done it in the past but lets just say im ready for the weekend.

View 9 Replies View Related

Calculate Overtime Hours

Aug 6, 2008

I am trying to get my time sheet to work out right but for some reason the formulas are a little more then what I can do. My time sheet is set up on a weekly bases. I have a regular time line, an overtime line and a total time line. an example I have is I work 12 hours a day I need an 8 to show up in the regular hours, 4 in the overtime and 12 in the total hours.

View 5 Replies View Related

Sum Formula - Calculating Overtime Hours

Feb 20, 2014

Example: In cells A1:A10 random number between 0 & say 20, need to sum ABOVE 8 = (calculating overtime hours)

E.g.
A1 = 0
A2 = 8
A3 = 8
A4 = 10 (giving 2)
A5 = 12 (giving 4)
A6 = 5
A7 = 13.5 (giving 5.5)
A8 = 8
A9 = 0
A10 = 16 (giving 8)
A11 = (Total overtime above 8 hours) 2+4+5.5+8 = 19.5

Need to be able to increase rows and drag across.

View 3 Replies View Related

Calculating Overtime Hours On Timesheet

Nov 30, 2012

I thought I had everything worked out with this timesheet but I've discovered one more problem.

Weekly Timesheet.xlsx

The total overtime hours needs to show that anything over 40 hours in the Total Regular Hours cell is overtime. And it also needs to show only up to 40 hours in the Total Regular Hours cell.

View 8 Replies View Related

How Can I Get Excel To Work Out My Hours And Overtime

Jan 31, 2009

I charge £45 per hour with a couple of conditions - minimum 8hr day and then 1.5T after 12hrs.

Is it possible to have a table where I put in my hours and then Excel tells me how much I should charge?

View 9 Replies View Related

Calculate Overtime From Daily Hours For A Whole Week

Feb 13, 2014

calculate overtime hours from daily time entries.
Normal hours are 7.6 per day
Time 1/2 is hours over 7.6 but no more than 2 hours
Double Time is all hours over that.

I have the spreadsheet with the days of the week in one row and at the end I have 1 cell for Normal Hours, Time 1/2 and Double Time. I need a formula that will work out overtime off each day and add for all days of the week and enter data into one cell. So all normal hours are in Normal hours and Time 1/2 and Double time are automatically calculated once hours are put in per day manually.

WedThurFriSatSunMonTuesTotal Normal HoursTime 1/2Double Time 10101068

View 5 Replies View Related

Calculate Timesheets Including Hours At Overtime

Mar 20, 2009

I'm trying to calculate timesheets including hours at overtime.
A1- Start time, B1- Lunch Start, C1- Lunch finish, D1- Finish
In E1 I want standard rate hours 'up to 8'
In F1 I want the remaining hours.
I have tried IF rules and realise these are wrong.

View 8 Replies View Related

Calculate Employees Work Hours For Overtime?

Apr 15, 2014

I have to calculate employees work hours for overtime.

in the timesheets:

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 13:00 <----- total for cell D2,D3, and D4 is more than 40

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 5:00 Regular <----- to make 40
5 A123 4/14/14 TRT 8:00 Overtime <----- 13-5=8, so i have to write down 8 here for overtime

How can I do this?

I want to make a command button for macro to perform this.

View 2 Replies View Related

Pivot For Hours Worked Sum

Sep 24, 2012

Timekeeper to tally total hours worked by employee. When doing a pivot for sum total hours worked for FY13 it does not calculate correctly. I understand they formatted that column/custom h:mm but when I change the 8:00 hours to a number I come up with 0.33 .

I am attaching a sample file : sample time.xlsx

I just want them to get a running total of hours worked/pay.

View 5 Replies View Related

Calculation Hours Worked?

Jul 3, 2014

I'm trying to make a way to track if I've worked more or less than the 39 hours/week I'm paid for. At the end of each week, I have a total of how many hours and minutes that I've worked .

On column C I have what I should work.

On column D I have what I did actually work

On column E I'd like to convert automatically Columd D to minutes for calculation purposes

Column F to know if I worked more or less than what I should've subtracting C and E

Column G to have an ongoing tally to know if I need to work more or less

Column H and I could probably be the same thing. Ideally what I'd like is to have a formula pull the information from column G and put it into workdays, hours, and minutes with 1 workday being 7 hours and 48 minutes.

Since I tend to work too much, I'd like to know if I've worked 3 days too much during 1 month, I can take 3 days off the next month to get everything zeroed back to where I don't owe the company anything and vice versa.

View 6 Replies View Related

Hours Worked Calculation ....

Dec 2, 2008

I am trying to create a spreadsheet that auto calculates my emp. time.

However I do not want to use military time. I can get it to work by =a2-a1 but only if it is 8.5 and 17.5. Any ideas how I can do clock in 8:30 clock out 4:30 = 8 hours?

View 7 Replies View Related

Worked Hours Between Two Periods

Feb 10, 2010

I'm trying to calculate the total hours worked for two given periods over a shift , which can span two consecutive days ie. start 15:45 and finish at 00:15 the next day. Hours worked between 6am and 6pm are paid at standard rate, whilst hours worked between 6pm and 6am attract penalty rates. Hours are cacluated in 24hr time

I have attached a copy of the timesheet that we use so you can see exactly what I'm trying to achieve, and included most of the shifts that we have.

View 14 Replies View Related

Calculating Hours Worked

Jan 1, 1970

I can do the timesheet formula for adding the hours worked as follows:

Start Finish Total
08:45 17:15 8.5

However, it doesn't work when I fill in a whole week work of hours in this format:

Start Finish Total
08:45 17:15 08:30

It works on a daily basis, but when total hours exceeds 24, the formula get's all mixed up - how to I format the total column to account for every 5 minutes worked, which you can't do when converting to decimal??

View 14 Replies View Related

Add Overtime Hours Bases On Reason Code And Whether Cash Or Time

May 31, 2013

How can I total overtime based on a "Reason Code" and whether the employee chose "Cash" or "Time" compensation?

View 2 Replies View Related

Calculating Hours Worked For 3rd Shift

Nov 27, 2012

Weekly Timesheet.xlsx

This spreadsheet calculates hours worked great for first and second shift but when you enter times for third shift it goes all whacky with the outcome.

View 10 Replies View Related

Converting Time To Hours Worked

Mar 15, 2012

Is there a function or a macro to calculate number of hours worked from a single cell value.

For example, cell A1 has "1600 - 1715" and need it to convert to "1.25" on cell B1

View 6 Replies View Related

Formula To Calculate Hours Worked

Feb 24, 2009

I have this spreadsheet and in it the time is changed from military time to regular and then I use a formula to calculate hours worked. On some of these the total is off by one minute. Does anyone know how to fix this?

I don't know how to paste the spreadsheet so you can see formulas,

View 9 Replies View Related

Macro To Calculate Hours Worked

Feb 1, 2007

I need to develop a work sheet for agency booked people to count the number of hours worked by them on daily basis. Agency can clock in at three different times and clock out at 6 different times. i tried but could not even develop logic to calculate the total earned hours. i attached the sheet for reference.

View 5 Replies View Related

Formula To Add Total Hours Employee Worked For Each Day?

Dec 21, 2013

Refer to the attached sheet which is Daily Schedule for employee. I need a formula to add hours worked on single day in cell C2 for Monday, E2 for Tuesday, G2 for Wednesday, and so on.

Every day we have Clockin_Clockout info for each employee as shown for employee a & b.

FYI : I am using below formula to add employee hours for the week as (formula in cell R4).

[Code] .....

View 14 Replies View Related

How To Calculate Hours Worked Using 24hr Clock

Jan 28, 2014

Attached sheet, I am struggling with the formula that will add up the hours overtime worked per day when I enter start and finish times.

Standard working hours are :

mon to thurs 8 hrs per day 8m to 16.30 (with 30 mins unpaid break)
Friday 6 hrs per day
Saturday all hours are overtime

Hours Commited sheet.xlsx‎

View 4 Replies View Related

Subtracting Break From Total Hours Worked

May 21, 2009

This is probably a very simple problem that has me going around in circles. I am attempting to set up a time roster, where I simply want to check:

If "end-time" minus "start-time" is greater than 4:00 (hrs), then deduct 00:30 (minutes) and place that result in another cell.

If it is not greater than 4:00 (hrs) then leave unchanged. I have read thru countless examples on the Forum - but I think that such great learning is driving me mad. Although I do believe that I have the correct format [h].mm - but attempts with IF's have got me confused. This is one of those "Looking down the tunnel towards the flickering light" moments.

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved