Networkdays In Production Schedule
Jul 2, 2009
I have attahced an example of what I need to do. I need to project due dates for each of our 8 departments based on a ship date of the final product. Each of the 8 dept. have a number of operations (ops) and given number of hours for each op. These alocated hours change on every job plus I have 2 outside operations that may or maynot be added to the mix. I don't have a clue on where to even start with this formula.
View 2 Replies
ADVERTISEMENT
Jun 7, 2013
I need to make a spreadsheet on excel which shows the production schedule of a product over 4 days.
Then I need to make a supply ordering sheet which shows how much supplies are needed to do the above task and how much each item in the supply list will cost and when the items would need to be ordered.
View 4 Replies
View Related
Sep 4, 2006
I have created a daily schedule which has a number of factory variables taken into consideration which determine the date and time a particular product should, barring any mechanical problems, come off the machine. (see attached spreadsheet).
The date at the top will be editable by me only so that when I update the production quantities, the “date/time off” column automatically re-adjusts to the remaining quantities.
The formulas are a little long winded, but I have left them that way whilst I try and develop it. I should be able to figure out how to condense them later.
My problem is that the “date/time off” on the right works excellent, but over a 24 hr period.
Ordinarily, we work a 12 hour day (6am to 6pm) with overlapping shifts to cover breaks, and 20 mins warm up at the start of the day for the machine, thus maximising a 12 hour day.
Of course if demand exceeds the allotted time we put on overtime.
Is it possible to specify that normal days are only 12 hours so that if a product exceeds 6pm, it flows into the next day with the balance starting at 6:20am?
And, if the production for the week exceeds the time could I stipulate particular days which we deem are suitable for overtime? Ie, we decide Wednesday is a 14 hour day and not 12.
I had toyed with the idea of creating a 365 day table/calendar, on another worksheet which would have its individual allocated hours in an adjacent column and somehow link them to the date/time off, perhaps by way of a VLOOKUP, but I have been chasing my tail trying to figure out how to implement it.
View 9 Replies
View Related
Dec 17, 2009
I am going to attempt to design a production spreadsheet which does the following:
1.Orders are put on one page of the spreadsheet (Order Tab) The order is put on listing, Customer, Sizes, Qty etc
2.The user is then able to select an order and if possible I would like a pop up calendar to appear in which the user can then select a production date.
3.One the production date has been selected I want it to open up a new tab if one doesn’t already exist and then cut the information from the order tab and then paste it into the production day.
I have provided a spreadsheet of what I want to achieve but I am unsure if this is possible.
View 14 Replies
View Related
Feb 11, 2009
I have two rows with years and production like below:
2009 2010 2011 2012 2013 2014
4 4 4 4 0 0
I want to find last year with production which is 2012. Do any of you know about any function I can use for this?
View 6 Replies
View Related
Nov 20, 2007
I am trying to do parts forecasting.
My customer makes 6 different widgets, all of which use a different number of the same parts (tabA ~ tabZ)
For example, model A has the following:
1 x tabA
2 x tabB
0 x tabC
4 x tabD.
I have a matrix which shows how many of the different parts are in each model. The part number goes down the rows and the model being produced goes across the columns. So this goes from A10:G:21
Now, I have to do a forecast for the next year and I trying to figure out the best way to do it and have each months totals of each part. My forecast has the model numbers going down the rows and the months going across the columns. This is from A1:G7
The way I used to do it is have a line for every part and manually multiply the monthly total by each models per unit and it ends up being a formula that gets longer and longer.
January needs for tabA are (B2*B11)+(B$3*C11)+(B$4*D11) ...
February needs for tabB are (B2*B12)+(B3*C12)+(B4*D12)...
When they have 20 distinct models it gets difficult. Also, there may be mid-season changes to the bill of materials that make it difficult to change.
View 9 Replies
View Related
Sep 10, 2008
I have a production schedule with start and finish dates for each project. To the right of this I have a matrix with "week starting" dates. What I am looking for is a formula that will indicate how many days in each week the project will take. Below are the cells filled in correctly. However, I did this manually. Any idea of a formula? I'm pretty new to this.
WEEK STARTINGSTARTFINISHUNITS PER DAY9/1/089/8/089/15/089/22/089/29/089/10/089/24/0813.4503530
View 9 Replies
View Related
May 21, 2014
I'm trying to use a Select Case to log production time-tables.
I've tried a couple angles - one being Select Case.
Every time I run the Macro I get the default ERROR "Wrong Model Entered...."
[Code] .....
I'm thinking the problem lies within
[Code] .....
but I'm not certain.
View 1 Replies
View Related
Aug 13, 2012
I work for a manufacturing plant where we manufacture one product which is then sold under different names.
The product is made from the same material.
I am looking for a way to match up production to the orders and then subtract the produced quantity from the orders.
Tab 1 - Orders: Column 1 has the items (A1, A2 and A3 are all produced from A), Column 2 has the date when the order has to ship and Column 3 has the ordered volume.
Tab 2 - Production: Column 1 has the raw material, Column 2 has the production date and Column 3 has the amount manufactured.
Tab -1: Orders
Item
Ship Date
Ordered Qty, KG
A-1
8/22/2012
16
[Code] ..........
Tab -2: Production
Item
Production Date
Quantity
A
8/13/2012
140
[Code] ........
View 4 Replies
View Related
Jul 31, 2008
if I want to look up a table named production in Access.
table:
Name: bob,jason,robbert,christy
Dept: bins,cars,cars,sewing
now if i wanted to be able to look up jason then have it populate which Dept he worked in, in cell A1 in my excel spread sheet what code could I use. Just want to look up one area in my access data table then show it in A1 one item at a time.
View 9 Replies
View Related
Apr 24, 2013
I have daily production sheets (Excel sheets) that I fill out every day indicating the day's production totals. The files are named by the day's date. For example today's sheet (4/24/13) would be 042413.xls. However, I would like to be able to pull certain pieces of information into another separate spreadsheet. For example, my boss asked me how many of a certain product we made over the last month. So, I'd like to pull the product info, the date made, and quantity made into another sheet. And I'd like to be able to do this automatically for a date range that I specify.
View 8 Replies
View Related
Nov 7, 2006
auto calculate end dates on production plan ...
View 9 Replies
View Related
Jul 9, 2013
There should be a Login and Logout Button and a Start time end time button to record data to the next sheet in the workbook. Also it would be great if it includes a Break and EndBreak button so that the time taken in the breaks gets recorded in the next sheet in the Workbook.
Every Morning colleagues should click the LoginButton to start and click the logout button at the Day end to get the total production time recorded in the next sheet. (Total production time should be Total time taken minus breaks). We have a 9 hour shift.
View 6 Replies
View Related
Jun 3, 2013
I have a 5 major categories of products e.g. Ketchup, Hot sauce ,mayonnaise , pizza sauce etc.
Now each of these individual categories are further divided into number of of subcategories based upon the the sizes and brands.
I want to create a sheet (One sheet) where I have to record production of each product on daily basis.
Like for example if I am producing ketchup, I select ketchup from drop-down list,Now in next column I have to select production size from predefined sizes i.e subcategories. But it should also be from drop-down menu and it should only show me the subcategories of my selected product like ketchup .I think this has something to do with data validation but I am not sure how this model will work.
View 3 Replies
View Related
Jun 2, 2006
I have a very large spreadsheet where i have orders, product and line status listed. I neeed to find the line staus of each product in production against the order. I'm using an array sumif formula but since the spreadsheet reachs 10000 rows of information I dosn't alway calculate correctly.
ORDERPRODUCTSTATUS
ABCDAPPLEPICKED
ABCDORANGEON HOLD
ABCDPEACHSHORT
ABCDYAMSSTAGED
EFGHAPPLEPICKED
EFGHORANGEON HOLD
EFGHPEACHSHORT
EFGHYAMSSTAGED
Required Result
Order
ABCDAPPLEORANGEPEACHYAMS
PICKEDON HOLDSHORTSTAGED
View 5 Replies
View Related
Dec 5, 2006
I have a formula which compares a date entered into a cell (say A1), against the function NOW() and returns a number. The number is the number of days left to complete a job (if the date in A1 matches the NOW() exactly then it returns 5, meaning there are 5 days left to complete the job).
View 11 Replies
View Related
Mar 28, 2007
I have a sheet with several NETWORKDAYS functions. They normally work perfectly, but sometimes I get a #VALUE! error as if Excel was not recognizing the function.
I haven't been able to track what exactly triggers this error. It could be related to a some macros I run, but I'm sure they do not disable Analysis Toolpak at any point. Actually if I manually disable and re-enable the add-in, the error doesn't go away.
To get rid of this bug, I need to either open the spreadsheet on a different machine or close/repoen Excel (which only works sometimes). Strangely, if I retype one of the cells, sometimes Excel will recognize the function across the board.
View 9 Replies
View Related
Oct 16, 2008
I am using networkdays. as follows:
=NETWORKDAYS(I91,I90,I89)
The formula returns as 2 if it is between two consecutive days (Monday to Tuesday). I need to change the formula to the following:
If the days are the same, return as 1 day, if it is two consequtive days, return as 1 day and if 3 cosecutive days, return as 2 days and so on.
View 9 Replies
View Related
May 22, 2007
I have a pivot table listing stock prices from Jan to today. I would like to group them as networkdays.
I see the option to group as days and then select number of day=5. However when I view the data, the 5 day group does not mirror the calendar.
It is 5 days in a group, but it is not the 5 work days of the calendar. It might be the last 3 days and the next 2 days of the following week. I am trying to get the same week to stick together.
View 9 Replies
View Related
Oct 23, 2007
I have this formula for determining the numberof days in the current month, excluding today.
=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY())-1
Now I need to exclude the holidays.
I'd rather not add another named list or table so I thought I'd use an array constant but can't get it to work. This is what I added:
{=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY(),{DATE(2007,10,10);DATE(2007,10,11)})-1}
Okay, I used oct 10 and 11 as an example to insure the formula is working. But it doesn't work and I can't figure out why.
View 9 Replies
View Related
Apr 17, 2009
Networkdays on default takes saturday as a holiday. Is there a way I can undo this and have only sunday as a holiday while calculating net working days.
View 9 Replies
View Related
Jan 13, 2009
I can calculate the networkdays between two dates but how do I project a finishing date if I know the starting date, the holidays, and the duration of the task in working days? (Sample sheet attached, working in Excel 2003).
View 2 Replies
View Related
Feb 2, 2010
I have the formula Networkdays(A4,F4-1,L2:L10) and it works fine apart from if i enter the same date in cells A4 and F4 ie the work was processed on the same day the formula calculates a value of -2 when I would like it to be 0 Also if the cells are blank as the data has not been completed yet it comes up with a #NUM! error.
View 4 Replies
View Related
Dec 27, 2006
In order to use the networkdays() function in a workbook im working on i need to get the Analysis ToolPak add-in installed on my pc.
Will this workbook function correctly if opened on a pc that does not have that particular add-in on it?
View 9 Replies
View Related
Mar 26, 2007
I have three columns of data that pertain to this question:
1. Status (Open or Closed)
2. Assigned (names)
3. Date Opened (a date value)
I want a formula to calculate the AVERAGE NETWORKDAYS between Today() and the Date Opened where Status = Open and Assigned = .
I'm thinking it'll be a big, honking SUMPRODUCT formula but I can't figure it out. Honking is a ...'technical' term.
View 9 Replies
View Related
Jun 11, 2007
How would you adjust the network days formula so that Wednesday is considered a non-working day?
View 9 Replies
View Related
Mar 9, 2007
I am trying to apply a conditional format to a cell with a date entry (D5) if the date in D5 is more than 2 days previous to the date in A5 excluding weekends. I've tried variations of the following using conditional formatting
=NETWORKDAYS(A5,D5)>2
View 2 Replies
View Related
May 5, 2014
I want to make a little chart for easy reference that tells me due dates for projects, based on estimated completion times.
I'm already using NETWORKDAYS to find the amount of working days between today and a due date, but I want to flip the formula around, and I'm having trouble getting the syntax right.
For example, column A reads:
0
1
2
3
5
7
10
15
20
Estimated completion times for various projects.
So I want column B to read the date that this would render. A1, value 0, would always produce today's date for B1. B2 would always read one business day into the future, B3 would read as 2 business days into the future, B4 as 3 business days into the future. Does that make sense, and B5 as 5 bd into future.
View 2 Replies
View Related
Feb 27, 2014
I have formula for working days which excludes holidays :
[Code] .....
Code works but I have monthly worksheet and macro for adding days in month. This formula's end date is in AI2 cell, which corresponds to 31th day of the month. Problem is that I get #REF error across all sheet when I delete last day columns, in month which have less than 31 days.
I know that this is the cell reference error because cell AI2 is deleted, but is there any solution for changing networkdays formula or replace It with something else that will work same, with range maybe ?
For now I just hide columns, which is o.k., but I would rather delete columns...
View 7 Replies
View Related
May 1, 2009
I've attached a sample of what my problem is. I'm trying to keep track of critical ship dates using NETWORKDAYS. My formula works good until the 2 cells it's watching have no dates in them. This should be an easy fix but I can't figure it out. The formula reads =IF(ISBLANK(E3),NETWORKDAYS($A$2,F3,$A$17:$A$29),NETWORKDAYS($A$2,E5,$A$17:$A$29)). The cell range A2:A17 list the holidays for the year. Cell E3 is a ship date to teflon and F3 is a ship date of the completed job to the customer.
View 2 Replies
View Related