Auto Calculate End Dates On Production Plan

Nov 7, 2006

auto calculate end dates on production plan ...

View 9 Replies


ADVERTISEMENT

Hlookup (look At The Dates In Row 2 On The Tab Marked “Cap Plan”)

Nov 17, 2009

inputting a formula that will look at the dates in row 2 on the tab marked “Cap Plan” on the sample sheet and then go to tab “Monthly Mode” and match the date and then take the percentages for each work type on that tab and put them in the percentage columns in the tab “Cap Plan” for the correct date. This document will be a rolling 52 week one so a simple = formula will not work.

View 2 Replies View Related

Auto Fill Dates: The Sheet To List The Dates In A Column For Each Month Automatically

Jun 17, 2007

I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.

View 6 Replies View Related

Auto Populate Calendar Days Based On Month / Year And Auto Insert Work Based On Dates / Name

Jul 31, 2013

I am trying to auto generate a calendar based on two drop down menus - Month and Year.

Once the month and year is selected I want to import all work orders onto the calendar based first on the "Labor Name" found in the list of work tab, then assign each work order for that labor name to the respective date on the calendar for the month.

August PM Schedule Demo.xlsx

View 2 Replies View Related

Auto-Merge Dates In 3 Columns And Then Auto-sort Merged Columns

Jan 10, 2012

I have dates values in 3 columns.

A1 - Header - "Holidays in XXXX'
B1 - Header - "Holidays in YYYY'
C1 - Header - "Leaves by YOU"

A2:B11 have static dates consisting of 10 dates in each column.
C2:C11 - the user may enter any date at any point of time.

I would like to auto-merge the dates in all the 3 columns (A2:C11) in a single column say D2:D31 and then the system should auto-sort the column based on dates in any one order. So as soon as the user enters a value in say cell C2, all the 10+10+1 dates should get sorted.

Also the constraint here is a user may not apply all 10 leaves at in a year. So many of the cells may have blank values.

View 1 Replies View Related

Employee Retirement Plan

Oct 27, 2007

how to use formula in the monthly contribution field to calculate 7% of pay (salary)

Lenght of Total pay Monthly contribution cummulative
Service retirement value
3.6 $528.94

Please one more thing. How do i use FV Function, monthly contribution, and the lenght of service field to to determine the current value of the employees retirement palan.

View 10 Replies View Related

Actual Vs. Plan In Pivot Table

Mar 23, 2007

I've attached a simplified worksheet which tracks the calls of a team of salespeople along with a pivot table showing their results for Jan-Mar. I've also included a summary of their planned calls for the period. Ideally what I'd like to do is have the pivot table show actual calls, planned calls and variance for each salesperson and each month as seen on A37-J42.

View 6 Replies View Related

Disabling Auto Calculate For Others?

Jan 22, 2009

I'm working on a workbook that has alot of calculations in it, on a pretty slow PC (Work-related), so auto-calculate is casuing crashing, so what I've done with this sheet is disabled auto-calculate and added a macro to calculate each sheet indiviually instead, which avoids the crashing (The last sheet still takes a minute and a half to process but thats ok I guess).

My worry is, when this workbook does the rounds, peoples excel will already have autocalculate on, and will crash it themselves. Is there anyway I can ensure that the sheet turns atuocalculate on or, failing that, does anyone have any ideas on how to help the issue?

View 8 Replies View Related

Auto Calculate Not Working

Jul 27, 2006

I import a file and paste as CSV. I believe everything is considered text
then, but there are numbers as well. The worksheet has over 4000 lines. I
try to concantenate two cells (ie. a2 and b2). I use the function, but the
result shows the formula. What I want is the new value or the string of
words. I have checked my options and the auto calculate is turned on. I
even try the various F9 keys.

View 12 Replies View Related

Auto Calculate Cells?

Nov 9, 2011

Every time i open my workbook it recalculates and takes ages

is there anything i can press to halt the recalculations so i can go in and change the formulas that are making it take so long.

View 3 Replies View Related

Auto-calculate Last Day For A Month

Nov 28, 2006

I'm working on a Calendar. One where all the user does is input the year, and the rest of the Calendar fills itself out, as to the days.

Leap year is causing a small problem. There may be an easier way to do this (actually, I'm sure there is, but anyway), is there a way for a cell to automatically figure the last day of the month?

IE: I put "2007" in a field. Another cell auto matically reads as "28" (last day of Feb for this year). Subsequently, when I enter "2008", the same field reads "29".

The rest I think I got ok, but everytime I get a leap year, it shoves all my formulas down a cell, thanks to the extra day, and they're all off by one (February calendar showing last day as "01" from March, and "29" as the first day for March, from Feb).

View 9 Replies View Related

VBA Turn Off Auto-calculate

Apr 19, 2007

What line of code would I need to used to turn off the auto-calc upon opening a workbook?

View 9 Replies View Related

File For Deliberations On Proper Entry Date Into A Retirement Plan

Dec 31, 2008

I work on an Excel file to determine property date of entry. While I have not completely worked out all of the bugs or the permutations or problems that may come up, I do feel that I have discerned an important part of the problem. The sheet where I set up my formulas and functions has the name 410a elig and coverage and should have a green tab.

To explain my reasoning; in this hypothetical situation, a company's plan has two dates of entry, January 1st and July 1st. An employee enters the plan on which of these two days follows closest or coincides with his or her attainment of 1,000 hours of service during the twelve months forming his or her initial eligibly computation period. If an employee starts work from January 2, 2005 to July 1, 2005, then that employee would enter the plan (provided he or she worked 1,000 hours during the initial eligibility computation period) on July 1st, 2006. If that employee started work from July 2, 2005 to December 31st 2005, then that person would enter the plan on January 1st, 2007.............

Some of the abbreviations or acronyms spelled out:
OYFDOH=One Year From Date of Hire; for now, the issue of leap years I will set aside
Month Function
Month=Month Function
JJ: January or July

OYFDOH MON JJ Year
8/7/2006 8 1 2007
1/2/2006 1 7 2006
6/1/2006 6 7 2006
3/1/2006 3 7 2006
8/1/2005 8 1 2006
6/1/2006 6 7 2006

View 5 Replies View Related

Auto Calculate Profit By Part #

May 21, 2007

I have attached a chart I'm working on. Each item is assigned a part number and it automatically takes away from the inventory each time an item is sold. I was wondering if the bottom half could work with the top to determine profit.

Example:

Customer purchases Part # 3 (C15) Quantity 1 (D15) for $450 (E15). Is there any way to set it up so whatever part number they enter...it subtracts their sold price from the cost (C5 through C11) to show the profit in (F15).

View 13 Replies View Related

Auto Calculate The Sart And End Of Each Month

Dec 9, 2008

I have a workbook where I would like to enter the date of the starting month when the workbook is being used, and I want it to calculate in the next cell across the ending of that month.

View 4 Replies View Related

Re-enable Auto-calculate Upon Exit

May 15, 2007

I have some VBA that disables AutoCalculate on certain sheets of my workbook. I am looking for a method to re-enable auto-calculate upon exiting / closing the workbook, so that my users dont get stuck with auto-calculate being off for other workbooks.

View 2 Replies View Related

Networkdays In Production Schedule

Jul 2, 2009

I have attahced an example of what I need to do. I need to project due dates for each of our 8 departments based on a ship date of the final product. Each of the 8 dept. have a number of operations (ops) and given number of hours for each op. These alocated hours change on every job plus I have 2 outside operations that may or maynot be added to the mix. I don't have a clue on where to even start with this formula.

View 2 Replies View Related

To Design A Production Spreadsheet

Dec 17, 2009

I am going to attempt to design a production spreadsheet which does the following:

1.Orders are put on one page of the spreadsheet (Order Tab) The order is put on listing, Customer, Sizes, Qty etc

2.The user is then able to select an order and if possible I would like a pop up calendar to appear in which the user can then select a production date.

3.One the production date has been selected I want it to open up a new tab if one doesn’t already exist and then cut the information from the order tab and then paste it into the production day.

I have provided a spreadsheet of what I want to achieve but I am unsure if this is possible.

View 14 Replies View Related

Function For Last Year Of Production

Feb 11, 2009

I have two rows with years and production like below:

2009 2010 2011 2012 2013 2014
4 4 4 4 0 0

I want to find last year with production which is 2012. Do any of you know about any function I can use for this?

View 6 Replies View Related

MRP / Bill Of Materials Vs. Production

Nov 20, 2007

I am trying to do parts forecasting.

My customer makes 6 different widgets, all of which use a different number of the same parts (tabA ~ tabZ)
For example, model A has the following:
1 x tabA
2 x tabB
0 x tabC
4 x tabD.

I have a matrix which shows how many of the different parts are in each model. The part number goes down the rows and the model being produced goes across the columns. So this goes from A10:G:21

Now, I have to do a forecast for the next year and I trying to figure out the best way to do it and have each months totals of each part. My forecast has the model numbers going down the rows and the months going across the columns. This is from A1:G7

The way I used to do it is have a line for every part and manually multiply the monthly total by each models per unit and it ends up being a formula that gets longer and longer.

January needs for tabA are (B2*B11)+(B$3*C11)+(B$4*D11) ...
February needs for tabB are (B2*B12)+(B3*C12)+(B4*D12)...

When they have 20 distinct models it gets difficult. Also, there may be mid-season changes to the bill of materials that make it difficult to change.

View 9 Replies View Related

Production Days In A Week

Sep 10, 2008

I have a production schedule with start and finish dates for each project. To the right of this I have a matrix with "week starting" dates. What I am looking for is a formula that will indicate how many days in each week the project will take. Below are the cells filled in correctly. However, I did this manually. Any idea of a formula? I'm pretty new to this.

WEEK STARTINGSTARTFINISHUNITS PER DAY9/1/089/8/089/15/089/22/089/29/089/10/089/24/0813.4503530

View 9 Replies View Related

Tick Box On Worksheet To Turn Auto Calculate On/off

Feb 26, 2009

i can place a tick box on a worksheet that will turn auto calc on/off? The same exact as going through the tools menu but for a lazy person?

View 2 Replies View Related

Auto Calculate End Date Of Previous Month

Jan 28, 2009

I have a cell in which I will input the last day of a month (e.g., 1/31/09, 2/28/09, etc.) In another cell, I want Excel to show the last day of the previous month. Is there a formula to calculate this automatically?

I enter in Cell 1: 1/31/09
Excel calculates in Cell 2: 12/28/08

I enter in Cell 1: 2/28/09
Excel calculates in Cell 2: 1/31/09

View 2 Replies View Related

Auto Calculate Total Monthly Cost

Jan 26, 2014

I am trying to keep a running total of cost, here is what I am doing

A B C D E F G H I

Date Books Pencils tax Month Books Pencils Tax Total
1/2/2014 11.50 2.50 .76 January 35.85 13.50 3.44 52.79
1/5/2014 14.50 3.85 .83 February 10.95 1.50 .68 13.13
1/6/2014 9.85 7.15 1.85
2/6/2014 10.95 1.50 .68

I only used Jan and Feb as an example. So as you see on the right side I will have all 12 months for the year and I just want all the totals for each month to auto calculate. I will have between 15 and 30 entries each month.

View 5 Replies View Related

How To Auto Fill Dates

Jun 25, 2013

I want to have colums A2 to A32 filled with dates automatically on selecting month from A1 dropwown(validation list).. how can that be done

View 2 Replies View Related

Adding Additional Goals And Objectives In Treatment Plan Using Form Control Button

Feb 25, 2014

Instead of having the goals and objectives already in the form I would like to have buttons that would allow my clinicians to add as many goals and objectives as they'd like to the attached treatment plan. I'd like them to be able to click a delete button as well when they review the plan and need to delete a goal that's been met. When my team clicks into the second worksheet they would see rows 10-16 (below). They would then type a STG 1 and an Obj A. They then would click the Add Obj button and add as many objectives that they needed. Then when they clicked the add goal button a blank copy of rows 10-16 (including the Add Obj button) would pasted one row down and would update to read STG 2. Neither of these buttons would appear when the document printed.

Here is a screen scrape of what I'd like the attached form to look like before goals and objectives are added.

add goal.jpg

The original form is saved in an .xltm format but I saved it in an .xlsm format so I could upload it here.

HCT ITP (2-25-14) Abbr.xlsm

I found a thread on this forum that came close to answering my question but my attempts to pull out the coding that I needed was unsuccessful. Here's a link to the thread: [URL] ........

View 14 Replies View Related

Production Schedule And Supply Ordering?

Jun 7, 2013

I need to make a spreadsheet on excel which shows the production schedule of a product over 4 days.

Then I need to make a supply ordering sheet which shows how much supplies are needed to do the above task and how much each item in the supply list will cost and when the items would need to be ordered.

View 4 Replies View Related

Using Select Case To Manage Production

May 21, 2014

I'm trying to use a Select Case to log production time-tables.

I've tried a couple angles - one being Select Case.

Every time I run the Macro I get the default ERROR "Wrong Model Entered...."

[Code] .....

I'm thinking the problem lies within

[Code] .....

but I'm not certain.

View 1 Replies View Related

Match Production To Open Orders

Aug 13, 2012

I work for a manufacturing plant where we manufacture one product which is then sold under different names.

The product is made from the same material.

I am looking for a way to match up production to the orders and then subtract the produced quantity from the orders.

Tab 1 - Orders: Column 1 has the items (A1, A2 and A3 are all produced from A), Column 2 has the date when the order has to ship and Column 3 has the ordered volume.

Tab 2 - Production: Column 1 has the raw material, Column 2 has the production date and Column 3 has the amount manufactured.

Tab -1: Orders

Item
Ship Date
Ordered Qty, KG

A-1
8/22/2012
16

[Code] ..........

Tab -2: Production

Item
Production Date
Quantity

A
8/13/2012
140

[Code] ........

View 4 Replies View Related

Table Named Production In Access

Jul 31, 2008

if I want to look up a table named production in Access.

table:
Name: bob,jason,robbert,christy
Dept: bins,cars,cars,sewing

now if i wanted to be able to look up jason then have it populate which Dept he worked in, in cell A1 in my excel spread sheet what code could I use. Just want to look up one area in my access data table then show it in A1 one item at a time.

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved