Number Of Days Per Year
Apr 24, 2007
If I have a year in a cell, say 2006, and in another cell I need a formula to tell me how many days are in that year. Just to try and calculate deliveries of things far into the future, so need to account for leap years.
View 9 Replies
ADVERTISEMENT
Jun 10, 2014
I need a formula that will calculate the number of days (ex from 10/1/08-1/1/12) and will differentiate between leap year and a regular year. I am trying to calculate interest between 2 dates and leap year is calculated on a different interest rate. Right now I have it set up so I have to manually type in the leap years in a separate field instead of being able to just you point a to point b.
View 2 Replies
View Related
Oct 11, 2009
i have the year in cell A1 (Just The Year)
what i was looking for is a formula that will list all the days of the week..
IE if i pick Monday form a drop down list than it would like all the mondays for all twelve (12) Months
so Jan Column would say
5
12
19
26
31
and so on for each month than if i picked a different day it would do the same
Using Microsoft Excel 2003 On Windows Xp Home Edition
View 9 Replies
View Related
Aug 3, 2006
What I am trying to to is calculate the number of Years, Months, Weeks, and Days from one date to another. So far I can calculate years and months accuretly but I'm having trouble with the days and can't seem to figure out how to do the weeks.
I'm using the formula: =DATEDIF(B1,B2,"y")&" Year(s), "&MOD(DATEDIF(B1,B2,"m"),12)&" Month(s), and "&(MOD(DATEDIF(B1,B2,"d"),365))&" day(s)"
B1 is the current days date
B2 is the entered date
What I am getting when I enter the date 9/14/09 with the current date (8/3/06) is 3 years, 1 month and 43 days. when it shoud only be 3 years 1 month and 11 days. Any date I enter the days are not right. I can't seem to figure out what I am doing wrong. Also I'd like to get the weeks to come up also. Such as Start date 8/3/06 Entered date 10/19/09. What I want to see: 3 year(s), 2 month(s), 2 week(s), 2 day(s).
View 3 Replies
View Related
Jan 22, 2008
I want to be able to count the number of days in a specific year between two dates.
Suggested formula input: DaysInYear(Date1,Date2,Year)
Examples:
DaysInYear(3/3/2005,3/3/2006,2006) should return 62 (31 in Jan, 28 in Feb and 3 in Mar.)
DaysInYear(3/3/2005,3/3/2007,2006) should return 365
View 4 Replies
View Related
Mar 14, 2014
I am making process TAT(Turn Around Time) which required following information. In Excel 2007.
1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays
2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays
Note : Any weekend (off days) dates listed in holidays should not effect the query.
View 9 Replies
View Related
Feb 23, 2008
Last week I posted a question related to formatting a cell to return a Day of the Week versus a numerical representation IE "Wed" instead of 02/20/2008 12:00AM. The solution provided worked for me:
1) Format cell to DDD MM/DD/YYYY HR:MN. Cell range (A1:A500)
2) Format destination cell with DDD. Cell range (B1:B500)
3) Destination cell (B1) = to original cell A1
4) B1 displayed data as "Wed"
However, the issue I still have is; I wanted to create a pivot table summarizing a year activity by Day of Week (in other words 7 entries for the year) and the pivot table still recognized all the MM/DD/YYYY. I ended up with a table displaying every day of the year instead of a yearly summary by Day of Week. Is there some way to strip out all the other numerical data from the new column I created to run a pivot table by Day of the Week for a whole years activity?
View 2 Replies
View Related
Nov 22, 2013
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
Legend:
*LU = lesson units; 1 LU is 45 minutes
Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14
[Code] ...........
View 7 Replies
View Related
Mar 22, 2014
How to create a spreadsheet with what I think will be a very simple formula?
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 7 or less days but more than 1, put a 2 in cell C2.
If date in B2 - date in A2 is 30 or less days but more than 7, put a 3 in cell C2.
If date in B2 - date in A2 is 90 or less days but more than 30, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
OR
Another, maybe simpler, way of saying it is:
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2.
If date in B2 - date in A2 is 2-7 days, put a 2 in cell C2.
If date in B2 - date in A2 is 8-30 days, put a 3 in cell C2.
If date in B2 - date in A2 is 31-90 days, put a 4 in cell C2.
If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
View 9 Replies
View Related
Jan 29, 2010
how can I get day number in the year?
View 9 Replies
View Related
Jul 31, 2013
I am trying to auto generate a calendar based on two drop down menus - Month and Year.
Once the month and year is selected I want to import all work orders onto the calendar based first on the "Labor Name" found in the list of work tab, then assign each work order for that labor name to the respective date on the calendar for the month.
August PM Schedule Demo.xlsx
View 2 Replies
View Related
Dec 19, 2008
I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.
View 4 Replies
View Related
Jun 11, 2014
how can convert number data to Month and year?
I have data is 27.03.2014 and would like to change this value is Mar-2014.
which formula should be work?
View 9 Replies
View Related
May 4, 2006
I can retrieve the weeknum of any particular date using =WEEKNUM(x) or =TRUNC(((x-DATE(YEAR(x),1,0))+6)/7)
But I'm looking for a UDF to output the tax year week number where the tax year always starts on 6th April. The std weeknum for 6th of april pretty much varies around week 13 but as it varies I don't ever get a strictly true result by deducting 13 from WEEKNUM().
View 4 Replies
View Related
Feb 1, 2012
I need to automatically calculate the number of months a deal runs through 2012 dependant on the start and end date.
I have attached a basic spreadsheet. Column C shows the results I would like the formula to calculate.
View 1 Replies
View Related
Oct 9, 2007
I've done a search on here to find out how to convert a date to a week number & found this: - =WEEKNUM(A1) which works fine, But I also want the result to display the year.
So 08/10/07 becomes WK40-07
I can't see how to do it!
View 5 Replies
View Related
Jan 9, 2008
My finacial year starts on the 1st of October of each year and ends 30th of September each year.
My week is from Monday to Saturday - though for calculation ease: lets say that my week is from Monday to Sunday.
I need to calculate the week numbers of a date based on the above two criteria.
I understand that I need to ascertain the day of the start date first i.e: did 01/10/07 fall on Monday, Tuesday etc. - In fact it was Monday!
so for my year 07/08:Week 1 was 01/10/07 to 07/10/07Week 2 was 08/10/07 to 14/10/07ETCSo in the attached worksheet - what formula can I use to populate column D - by using the data in column E?
I.e. All I want to do, is input date into E and B, C, D will be calculated automatically. It would be great of excel could populate A - aswell ;-)
View 11 Replies
View Related
Jul 27, 2013
I need to calculate the number of quarters difference between two quarter and year values. So I have The following:
Begin Quarter
Begin Year
End Quarter
End Year
3
2005
2
2011
4
2008
2
2013
So I need calculate how many quarters have passed since the begin quarter and the end quarter.
View 1 Replies
View Related
May 19, 2014
I am trying to calculate the number of months in a specific year between two dates.
For example.
Start date 01/06/2012
End Date 01/02/2013
Number of months in 2012 = 6
Number of months in 2013 = 2
How can I write a formula to give me the answer of 6 & 2 from the start and finish dates?
View 10 Replies
View Related
Jul 9, 2014
I am trying to fill a table of the last 12 values for the purposes of creating dynamic charts. I remember last time i used named ranges, offsets etc etc but been too long to remember how.
Ive attached a worksheet to explain it better.
I should probably mention, I want to be able to change cells C1 and C2 to update the values. Everything else wil be rather static.
Attached File : Test.xlsx
View 5 Replies
View Related
Jan 22, 2013
I'm having a data only pull week number and year. We are using Fiscal calendar starting in July. For example, A1 = Week number and A2= Year. How to set up a formula to retrieve a date for this? If A1 = 2 , A2 = 2013, the date will be 07/14/2012. I want the date pull of on Saturday every week.
View 6 Replies
View Related
Jan 12, 2008
I have a "start date" and an "end date". Is there any way to tell how many months are included in 2007 from those two dates using a formula? For instance, from 01-Feb-04 to 01-Feb-07, there is 1 month in 2007 (January). And likewise, 01-Jan-05 to 01-Jan-08 there is 12 months in 2007.
As noted, I have the start and end dates. I don't have the "how many months in 2007".
Start Date End Date How many months in 2007
01-Feb-0401-Feb-07 1
01-Jan-0301-Jan-06 0
01-Apr-0401-Apr-07 3
01-Feb-0301-Feb-06 0
01-Mar-0401-Mar-07 2
01-Feb-0401-Feb-07 1
01-Dec-0401-Dec-07 11
01-Jan-05 01-Jan-08 12
View 9 Replies
View Related
Nov 7, 2009
I am needing to create a formula that will calculate the number of paychecks and the dates for the calendar year. There is some employees that are paid bi-weekly and some bi-monthly.
For Example:
A1-Employee, A2-Hire Date, A3-Pay Frequency, A4-Number of Paychecks
Based on the hire date and pay frequency it will calculate the number of paychecks in A4.
Is this something that can be calculate with excel or would it need to be done manually.
View 9 Replies
View Related
Jan 28, 2009
I have a table with 2 date columns, and I need to subtract one date from another to give me the number of days the job has taken, but this also needs to exclude the weekends. There is no hours involved.
I.e.
Start Date Finish Date Days Taken
22/Jan/2009 27/Jan/2009 4
Is there a formula that i can use to work out the days taken.
there is multiple rows of information, the above is an example.
View 7 Replies
View Related
Sep 25, 2009
I would like to find the average number of days events take from start to finish.
My data is in 3 columns:
EventName StartDate EndDate
I have a ton of EventNames, each of which have a StartDate. But I want to calculate the average days to complete only for those EventNames that have EndDates.
So, if a cell in the column EndDate is greater than zero, then take that cell, subtract it from the corresponding cell in the StartDate column; Add all of them together and divide by the count of those rows in the EndDate column that have a value.
How do I put this in excel terms? ....
View 3 Replies
View Related
May 24, 2007
I have a start date (say 01/04/07) and I need to add a number of days to it to get the start of the next financial period. Unfortunately, I need to ignore a small list of dates (bank holidays, etc).
View 9 Replies
View Related
Jun 12, 2007
If I was to say have a date in cell A1, is there a formula which would tell me how many days from that date left in the financial year?
I was thinking an IF statement, but I know thats way off course! And it could get quite messy.
This is what I would like it to do:
Cell A1 - 30/10/2007
Formula - Finds the number of days between 30/10/2007 and the remainder of the financial year, which for me ends on 30/06/2007
Should give me the answer of "x" amount of days.
View 9 Replies
View Related
Jul 6, 2007
1/1/2007
1/1/2007
1/2/2007
1/2/2007
1/2/2007
1/30/2007
1/30/2007
1/31/2007
1/31/2007
1/31/2007
1/31/2007
2/1/2007
2/2/2007
2/2/2007
2/2/2007
2/28/2007
2/28/2007
2/28/2007
2/28/2007
2/28/2007
This list goes on with every workday of the month repeat several times, with no day have any set number of entries. Also each new month is just tacked on to the previous list. All of this is in column A but there are many other columns of data with these dates. I just didn't see the need to replicate that here.
What I need is to be able to count the number of unique days per each month but I do not want to have to specify a range for the month of January, then another range for February, etc. I just want to be able to list the column A4:A1200 and have the formula select just the unique days for January. Then in another cell modify the formula for unique days in February and so on.
View 9 Replies
View Related
Nov 3, 2008
If I had two dates in two separate cells , so E2 is the 01/10/08 and F2 is 06/10/08 and I want to work out that their is a difference of five days what would the sum be? Also is there anyway I could factor into that sum what is pure working days as opposed to weekends?
View 9 Replies
View Related
Nov 10, 2008
I am trying to set up a function to derive a number of days between 2 dates.
Within the table I have an on hire date, and off hire date, and an optional suspend hire date range in 2 other columns - ie. there are 4 columns with dates in.
On hire is in column B; offhire in C; suspend hire in G and recommence hire in H. The optional suspend hire date range will always fall within the main hire date range.
Column I calculates the number of days for the suspend hire period.
My key cut off date is in cell C4.
There are 3 different scenarios I need the function to cover.
1 - if the cut-off date (in C4) is later than recommence hire, calculate the number of days from hire start to cut-off date, less suspend hire period days.
2 - if the cut-off date (in C4) falls within the suspend hire period, calculate the number of days from the hire start to the begining of the suspend hire period.
3 - if the cut-off date (in C4) falls before the suspend hire period, calculate the number of days from the hire start to the cut-off date.
This is the fuction I have written:-
=IF($C$4>H10*($C$4-B10-I10),
IF(AND($C$4>G10,$C$4
View 9 Replies
View Related