Stacked Column Chart With Rate Line
Nov 9, 2006
Here's a sample of a chart that I want; However, I want the bar chart to be a stack chart as I have multiple "Failure modes" per month that I want to show the number(or count) of failures per month. Then I want the line chart to remain the Complaint Rate for that month.
I just can't seem to figure it out.
This chart pulls from a data set that looks something like this: ....
View 9 Replies
ADVERTISEMENT
Feb 15, 2012
I am trying to overlay a line chart on top of a stacked column chart. The stacked column chart is a chart where the x axis is dates and the y axis is amount. The line chart is a projected amount that I will reach in few years; the x axis is the date while the y axis is an amount. I can get a chart that has a line and stacked columns, but ever time, the dates get messed up. The line has an extremely wide date range while the columns only have about a month of data.
View 9 Replies
View Related
Apr 24, 2014
I am trying to create a 100% stacked column which has a superimposed line chart over the top of it.
Basically % of yes and no for two separate datasets, but which share the same characteristics. The x-axis is months of the year.
CSP Yes
CSPNo
All Yes
All No
Apr-13
6
19
[code]....
I can create 2 separate charts. One for the yes/no of one set as a 100% stacked column. I then use 'no fill' on the No column to stop this from being seen.
I can create a 100% line chart for the second data type, and 'no fill' the 100% line that appears.
However, I can't merge the two charts to show the Yes % for one dataset as bars and the Yes % of the other as a line.
I am using Excel 2010 on XP.
View 2 Replies
View Related
Aug 14, 2014
I am plotting a line chart wherein the X-axis is based on % and Y-axis is based on $. I have 5 scenarios wherein they have different ranges. I want to have the X-axis plotted up to 100%. How to get the X-axis stacked at 100%. See attached file.
View 1 Replies
View Related
May 28, 2007
I would like to make a graph in Excel, where I present both a stacked column and a line with two different axes. Including a clustered column and a line in the same graph with two different axes is easy, as this combination can be found in the custom types selection in the chart wizard. However, there is no such alternative as a stacked column and a line with two different axes. Is combining the two manually possible?
View 2 Replies
View Related
Apr 30, 2014
I have a stacked column chart that I need to show an average on, that is on a second axis and shown as a line rather than a column.
I have tried moving it to a secondary axis but then it keeps changing the graph to show only the average.
this is just one of about 25 graphs I am having to do like this.
stacked 2 axis.xlsx
View 2 Replies
View Related
Oct 22, 2006
i have a chart made but it will only read numbers what i looking for it to do is read cells filled. beacuse none of the cells will have numbers in them. example column I,J,K,L will have a letters in them. starting on row 2 on down till the end. what i'm looking for is if I2 has a letter in it it will read as one for the chart. and will ignore the other columns if K7 has a letter it will read as one and ignore the rest of the columns. this will go on till the end of the sheet. and all rows with nothing in them will be ignored. is this posable?
i think it is bacisly giving a value to a letter and having the chart inturpat that value as 1 and then adding them up. if posable i just thought of maybe the letter could be turned into a date to give an ongoing graph for the info. maybe thats the wisest thing to do to show what each day looks like. hmm i have to play around with it. just typing this out i think i figured a way to do it.
View 8 Replies
View Related
Oct 23, 2007
I have a spreadsheet where I have some data. The data is divided into two parts we have part A that is a figure and then I have a A total which is a figure which part A cannot exceed and then what I would like to do is to create a Stacked Column Chart where I have an A total column where the maximum amount is the total A and where I would like to show how much A has utilized the A total.
View 5 Replies
View Related
Jul 30, 2014
I have created a Power Pivot Chart with Stacked Column chart. Made one axis as Secondary Axis and the axis is Clustered Column, but it is overlapped with Stacked bars.
Is there any easy way to solve this issue, apart from creating 2 dummy columns and making it work.
View 3 Replies
View Related
May 16, 2012
I am trying to chart this -
Code:
20112010
Net ($)Units Net ($)UnitsFFS** $ 808,227 61,370 $ 909,989 56,518 FFS
J-Code $ - 0 $ - 0 MCO*** $ 64,027 5,359 $ 26,691 1,614 MCO
J-Code $ - 0 $ - 0 SPAP/SCHIP $ 72,728 4,612 $ 110,592 6,490
Image can be viewed here - [URL] ...........
But I want units to appear on the secondary axis so its not so small.
View 3 Replies
View Related
Jun 28, 2008
Would like to add totals to stacked column chart in Excel 2007.
I have followed same steps listed here [url] but cannot position data labels above column.
Excel only gives me the options Center, Inside End, and Inside Base.
I also tried setting label position with VBA:
For Each co In ChartObjects
For Each s In co.Chart.SeriesCollection
If s. Name = "Totals" Then
For Each dl In s.DataLabels
dl.Position = xlLabelPositionOutsideEnd
Next dl
End If
Next s
Next co
Also tried the following without luck:
dl.Position = xlLabelPositionAbove
For each VBA example I get following error:
Run-time error '-2147467259 (80004005)':
Automation error
Unspecified error
It seems like Microsoft has removed this positioning option for stacked column charts because it works fine for normal column charts. Anyone find a way to do this otherwise?
View 9 Replies
View Related
Apr 3, 2012
Is it possible to put in Trend Lines when creating a stacked column chart?
I've tried in Excel 2003 and 2010 but it doesn't appear that it is possible.
View 3 Replies
View Related
May 22, 2006
If the user adds 3 new lines, to the data table, – the Series Value Ranges should increase by 3 lines – AUTOMATICALLY(!) to avoid the user to full-around with the chart. It should take care of the 4 Series Ranges and also of the Range for the X-Axis Category Labels. As far as I recall, the way to accomplish it, is by NAMING the ranges with COUNTA etcc BUT, here – the last row is an empty rowc
View 2 Replies
View Related
Feb 13, 2014
From a chart in Excel I need to automatically calculate what the annual percentage growth rate is of a trend line. How to automate this in Excel? I've attached a sample so you can see what I'm trying to accomplish.
View 6 Replies
View Related
Sep 15, 2014
In the attached file I have the data which shows me the market size in value, my market share in value & I did a calculation to get the percentage. What I need is a chart that shows me the market size in column graph, my market share in line graph and I want the percentages to be showing also.
View 3 Replies
View Related
Sep 20, 2006
how to create a stacked bar & line graph together.
I know by default, I can choose to have a stacked bar, OR a line graph, OR a basic bar & line graph.
But I need to take a step further and have a stacked bar WITH a line graph.
options in which I could combine the above graphs?
View 4 Replies
View Related
Jul 15, 2014
i have a stacked bar chart, similar to this: [URL] What i need is a trend line, similar to this: [URL] that shows the average of the bottom bar to date.
View 14 Replies
View Related
Mar 24, 2009
We are trying to create a stacked bar graph with an average line. Each time we try to add in the average data to the graph it adds it to the stacked bar. The stacked bar should represent the inpatient & outpatient cases at a hospital for the current year (months showing across the as columns). The line should represent the previous 2-yr average total. Anyone have an idea how to add a line to the stacked bar graph? It has us stumped.
View 3 Replies
View Related
Mar 15, 2012
I need to show a chart with new and return visits 2 years side by side. I also need to show a budget line and 2 seperate utilization lines. How to show this.
View 1 Replies
View Related
Feb 14, 2014
I have a two bar chart (red and blue) I'm trying to turn into a stacked chart. It has total cars and broken cars. There are a 100 total cars (10 broken). But when I stack them, it shows 110 total cars (it's adding instead of merging them). Once stacked, there should still be 100 total cars....but the tip of it should be red to show what amount is broken. It's adding the two together but it shouldn't....the number of broken cars is still part of the total.
View 1 Replies
View Related
May 22, 2006
I am trying to define a chart of TWO Stacked Bars. (it will be a little difficult for me, with my bad English, to explain but I'm sure you will understand. My target is a chart as shown in the embedded picture. Take a look at sheet1:
This is a 75% completed chart. I managed to present the first 2 stacked bars. (light & dark green). Then I added a blank column ("D") and declared it as a "bar" on the 2nd. Y Axis. (This "D" series has now two values, of 5, which must be "Zeroed" when the chart is finished).
I managed to add the first part of the 2nd. Stacked bars. (Orange) I played a little with the Width and Overlap and got the result shown in Sheet1. (When The "two fives" will change into 0 - the two orange bars will start from the X-Axis (Zero "Y" level)/ So far so good.
What I need now is to add the last Series (F2:F9) to be put ON TOP of the Orange Bar but without success. If you'll take a look at Sheet2 you will see what I came up with. I DO NOT want them to be inside each other. I want them as in the embedded picture (side by side). In addition I would love to present the Labels: Newspaper, Internet, Relevant, Non-Relv. Inside the chart (if possible)
View 2 Replies
View Related
Jul 13, 2006
I am trying to define a chart of TWO Stacked Bars. (it will be a little difficult for me, with my bad English, to explain but I'm sure you will understand. My target is a chart as shown in the embedded picture. Take a look at sheet1:
This is a 75% completed chart.
I managed to present the first 2 stacked bars. (light & dark green).
Then I added a blank column ("D") and declared it as a "bar" on the 2nd. Y Axis.
(This "D" series has now two values, of 5, which must be "Zeroed" when the chart is finished).
I managed to add the first part of the 2nd. Stacked bars. (Orange)
I played a little with the Width and Overlap and got the result shown in Sheet1.
(When The "two fives" will change into 0 - the two orange bars will start from the X-Axis (Zero "Y" level)/ So far so good.
What I need now is to add the last Series (F2:F9) to be put ON TOP of the Orange Bar but without success. If you'll take a look at Sheet2 you will see what I came up with. I DO NOT want them to be inside each other. I want them as in the embedded picture (side by side). In addition I would love to present the Labels:
Newspaper, Internet, Relevant, Non-Relv. Inside the chart (if possible)
View 2 Replies
View Related
Apr 10, 2014
I have a data series plotted as columns. Then I want a horizontal line at $5,000 to appear all the way across the chart. It appears from the 1st to the last data point, but there is blank space before the first point and after the last point. I would like the red line to extend into this blank space before and after, so that it is going across the entire chart.
I tried playing around with different axis settings and no luck.
View 2 Replies
View Related
Jun 9, 2014
I would like to be able to add a line (a trend line) to a clustered column chart. The attached jpg (picture copied from Excel Charts - Easy Excel Tutorial) shows the general structure, with the red (poorly) hand drawn lines representing what I want to add to the chart.
If using Excel's Trend line functionality is not an option, I have already calculated the trend points adequately, so have the data to add as an additional series or combine with an existing series. (using Excel 2010)
View 3 Replies
View Related
Feb 15, 2007
Im plotting data on a Line-Column 2 Axes Chart which works really well with 4 data series (2 column, 2 Line) but when adding a fifth data series, the fourth disappears from view. I can see its still there cos I can display the values but I cant get the line to appear. The values for the 5th series are also similar to other series values so its not like the chart cant display it....are there limits to the number of series on such a chart?
View 9 Replies
View Related
Oct 28, 2013
Code:
ActiveSheet.Shapes.AddChart.Select
ActiveChart.ChartType = xlAreaStacked
I created a simple stacked area type in vba. Is it possible and how to have this stacked area to get values from combobox and textbox?
View 3 Replies
View Related
Apr 28, 2006
I am trying to develop a dynamic stacked bar chart, I have a consistent number of columns defining the x axis and a variable number of rows defining the y axis (the stacked data). Is it possible to generate a dynamic stacked chart. I have tried using dynamic named ranges but I can't get it to work for a stacked chart.
View 7 Replies
View Related
Oct 9, 2007
I would like to display 50 sequences, S_1 ..S_50, with stacked bars. Every sequence can contain 5 different events, E_1 .. E_5, in a random order. Every event has a certain duration, t. Lets say the first two sequences are as follows (duration time is in brackets)
S_1:
E_3(200), E_1(150), E_2(300), E_4(500), E_5(300)
S_2:
E_1(200), E_4(150), E_1(300), E_5(500), E_2(300), E_2(300)
...
How do I get Excel to display all Sequences in one graph as a function of time, with the bar-stack-color displaying the kind of event. So if E_3 would be red and E_1 blue we would see
S_1:
red, blue ...
S_2:
blue, ...
View 5 Replies
View Related
Jan 10, 2012
Using the table, draw a stacked chart that has both the project name (A, B etc) and Month on the x-axis (below all the projects). the stacked chart should contain the count for cat1, cat2, cat3 and cat 4 for each project (in different but consistent numbers for each month).
I need this for a presentation today,
OctoberNovemberDecemberProject Cat. 1 Cat. 2Cat. 3Cat. 4Cat. 1 Cat. 2Cat. 3Cat. 4Cat. 1 Cat. 2Cat. 3Cat. 4A
00236111110001B
C
D
E
F
0012230182600425G
H
I
02114001602210J
K
L
View 2 Replies
View Related
Jul 8, 2009
I need to create a chart showing a timeline from 0 hours to 100 hours. In this timeline, there has to be 8 seperate segments - ie, phase 1, phase 2, phase 3, phase 4, phase 5, phase 6, phase 7, phase 8. Each phase takes a certain amount of hours (the number of hours of each phase is irrelevant for now!).
how to format this data and then how to display such a chart? I need the timeline along the X axis.
View 9 Replies
View Related