Make A Stand-alone Of Project?
Mar 30, 2009
I'm not close to done yet, but when it's complete I want to distribute the project to people that might not have Excel 2003 or 2007. So, can I package an Excel file with UserForms into a stand-alone tool?
View 2 Replies
ADVERTISEMENT
Feb 5, 2007
way to do this but i have a sheet that is into 5 - 6 thous rows, in one of the columns (names) i sort it by names and then order it by subtotal for certain values.
What i need to know, is there anyway i can take just the subtotal values out and put onto another spreadsheet without copying and pasting it all as there are lots of subtotals and this would help alot as the other info is not nec. just the subtotal'd info. either that or is there anyway i can highlight the subtotal'd row info in yellow/bold text anything like that that would make it stand out without having to do it manually?
View 12 Replies
View Related
Aug 4, 2014
I have a table of projects with 1) duration in year, 2) time window (number of years of our planning cycle), and 3) start year of the project. I want to generate a list of project parts of all projects where they may take place. This will serve as an input to an optimization program.
So a project of 2-year duration should have 2 parts over any year within the time window. I am including the "impossible" ones for my developer to tag them as "0" when we run it through his code.
View 5 Replies
View Related
Sep 5, 2013
My task is to consolidate 4 Excel Project Lists (Workbooks) to a Master Workbook. The Project Lists has a different structure and almost different content. The relevant information is always on Sheet1 but it has completely different ranges. The only constant is the Project Number, which should be used to sort the information. Every Project should be listed only once with all the existing information.
I found a code written by Ron de Bruin which has already some components that I want to have in my VBA but I think there are still a lot of necessary adjustments to do.
Code:
Sub MergeSelectedWorkbooks()
Dim SummarySheet As Worksheet
Dim FolderPath As String
Dim SelectedFiles() As Variant
Dim NRow As Long
Dim FileName As String
Dim NFile As Long
Dim WorkBk As Workbook
[code]....
The Master Project List should has the headers in Row1 and the information listed below. The Macro should automatically places the correct information to the correct column. Some of the information are in 2 or more of the lists but they should be listed only once in the Master List.
Project Number
Project Description
...
1111E.000000001
[code]....
I guess a problem is that the structures of the Lists are quite different so there must be a kind of sorting process.
In the end I want to have an Excel File with the Macro and a Command Button and by clicking the Macro creates a new Workbook with the Master List.
It would be better if there is a variable range instead of a defined. Like the Macro searches the last row and starts at this row and column.
View 4 Replies
View Related
Jul 30, 2013
I am trying to get excel to open a MS Project file and then run a project macro on it.
What is happen is that when I run my code it works, and then excels VBA window freezes up and the run arrow goes away, and if I try to open project I just get a chiming noise and it won't open.
For now I have to select the MS Project file from a directory, but in the future I would like it to go through the folder and open all of the file in the folder
EXCEL CODE
Sub ImportMSProject()
Dim FileToOpen
Dim mpApp As MSProject.Application
Dim prjmacro As Object
'Identify the File to Open - START
FileToOpen = Application.GetOpenFilename("Microsoft Project Files (*.mpp), *.mpp")
If FileToOpen = False Then
Exit Sub
End If
'Identify the File to Open - END
[code].....
View 9 Replies
View Related
Aug 15, 2006
I am finishing up a program using excel that does a lot of nice things, and seems to be working. I want it to be used by anyone, even if they do not have Excel. I want it to be *my* program completely, w/o Excel being a part of it anymore. Is there a way to compile an excel file and turn it into an EXE file so there is no need for an excel program to run it?
View 5 Replies
View Related
Apr 27, 2007
I have tried to record macro to protect VBAProject / lock project for viewing. But can not success by that way.
View 9 Replies
View Related
Oct 12, 2013
I have a list of employees that can be assigned to tasks, the list is large enough that I cannot remember who is assigned to what.
All the employees assigned major tasks are automatically filtered out but these are employees with administrative tasks that should only be assigned as a last resort. I would like to assign the employees with administrative tasks a gray, italic, strike-out or some other font to indicate that they are different.
I assume this is done during the Add Item process...
View 2 Replies
View Related
Aug 28, 2007
I need to write a couple of functions. Firstly I want to do a count on column B (project $) depending on the criteria on column A (project description). For example a total count of all values in col B if project description is "P" or "A". [I can do sumif functions but this is a countif and I cannot get this right].
View 4 Replies
View Related
Jun 3, 2006
I would like to do is develop a stand alone program in Visual Basic ( not in Excel VBA) to update the price file in our Portfolio system automatically using the downloaded Excel format file csv extention file from the BigCharts. But before that, I need to export the *.pri file from our Portfolio system in to Excel which still saves as *.pri extention. Then once it updates, I import the updated *.pri file back in our Portfolio program. I understand that the Excel VBA code can be incorporated in Visual Basic code provided there is an object declaration for Excel file (In this case eventhough the both files are in Excel format, they don't have xls extention). how to use external files and Excel VBA code in Visual Basic?
Below is the code that I currently have in Visual Basic. What I'm trying to accomplish is using the ticker (eg. msft) as a keyword search to look up in the price file. If found , the price of that ticker from the test.csv file will be copied in to the price file which is test.pri. I haven't ran it yet.
Sub UpdatePrice(BigChartPath As String, BigChartName As String, AxysPricePath As String, AxysPriceName As String)
'Below are Excel VBA codes
'Uses the test.csv to look up tickers in test.pri and update the price in it
Dim PriceFile As Workbook, BigChartFile As Workbook
Dim PriceFileSheet As Worksheet, BigChartSheet As Worksheet
Dim MaxRows As Long
Dim PriceFileRow As Long
Dim BigChartRow As Long
Dim BigChartFound As Boolean
Call CheckBookOpen(BigChartPath & BigChartName)
Call CheckBookOpen(AxysPricePath & AxysPriceName)
Set BigChartFile = Workbooks(BigChartName) 'Big Chart website imported CSV file saved as test.csv...............
View 5 Replies
View Related
Jan 24, 2014
I have a spreadsheet on sheet 1 with a list of customers and their information. So on column A I have the customer number (i.e. k968, e37, p528,...), on column B i have the customer's name, on column C the street's name, on Column D the house number, on column E the zip code and finally the city on column F.
Right now there are around 600 customers in this list.
I have made a userform with a combobox in which I want to select an existing customer (pulled from the spreadsheet). On the same userform I have textboxes (customer number, name, street, number, zip, city). When I select a customer in the combobox, I want this customer's info to show up in the textboxes. I want to be able to change the info and hit Next to store the changes in the spreadsheet. When I do not select a customer from the combobox, I want to add new info in the textboxes and hit Next to store this info as a new customer. The userform also has a delete button. Then I select a customer in the combobox, this customer (and it's info) should be deleted from the spreadsheet when i hit Delete. So the spreadsheet is variable in length.
View 5 Replies
View Related
Jun 29, 2009
I need to figure a way to make to cells with dates equal each other if the
day,month and year are the same but are placed into a cell at different times during the day. "Making Date Now () = (06/29/09) In another cell". Therefore, A1= Now() and E11 = 06/29/09
View 2 Replies
View Related
Jun 30, 2007
I am looking for a forum or where I can find advice on using VBA with MS Project.
View 2 Replies
View Related
Feb 12, 2009
I'm trying to protect my project so that others can't unhide a sheet I have tagged as veryhidden within VB.
I followed these steps:
1. Select project in the projects window
2. choose Tools
3. Project Properties
4. Protection tab
5. checked lock porject for viewing
6. entered passwords twice
7. clicked ok and saved
On another file this has worked perfectly as I wanted it to.
However on another very large file with multiple VB projects it is not "taking" on the project I need it to.
I can open the file, the VB project and change the setting on any sheet I need to without entering a password.
View 14 Replies
View Related
Mar 9, 2009
Add Project to 'database' I recorded my marco.
View 3 Replies
View Related
May 7, 2008
I have a macro in a workbook (WB1) that opens another workbook (WB2). After performing several other macros through user invocation with buttons, I close WB2 with the following statement:
Windows("WB2.xls").Activate
ActiveWorkbook.Close (False)
While the WB2 workbook closes okay, the WB2 project is still open in the VB editor. Does anybody know why this code isn't closing the project in the VBE?
The WB1 process can occur multiple times while Excel is open and each time a separate occurrence of the WB2 project is left open in VBE.
View 9 Replies
View Related
Nov 28, 2007
how to start and name a new project in Excel VBA. Will someone explain how to?
View 3 Replies
View Related
Apr 11, 2014
Shee1 , sheet2 raw data from system extract.
I need the supplies of each code to fall into boxes sup1 sup2 and so.
While I also need when they were supplied created below the qty supplies table.
View 14 Replies
View Related
Oct 5, 2009
Is there a place on the net where I can work on, or take part of real Excel
project ( for training purpose ). If not, do you think that is possible to make such a place were people can learn and practice excel working on simulation of a real Excel projects??????
View 4 Replies
View Related
Jan 26, 2010
I have created a spreadsheet in Excel where it gives me a report of how many hours my employees do per week and it seperate them in different categories.
What I would like to do is find a way to match the cell's description with the amount of total hours that were spend on certain project.
So here is the scenario.
In my department there 6 employees that are assigned to work on certain projects in daily basis. These projects are called CRs and to identify them I've added a number after them.
So we will have CR0001, CR0002, ect. These are unique projects.More that one employee that could woork at the same project as well on other sections but I am only interested on the projects.
To help you understand what I am trying to do I will give you an example.
John is working on project CR0005, CR0006, CR0001. He has been working on them three projects for the last week.
Here is the summary of the hours:
- 5 hours on CR0005
- 10 hours on CR0006
- 5 hours on CR0001
This information is inputed in Excel spreadsheet Week 1 .....
View 12 Replies
View Related
Sep 5, 2013
I have attached a sheet with a sample of how my spreadsheet will look. This might involve a number of steps. I have actuals, forecast, and prior year information (for rolling months) for a number of line items. To the right, I calculate a variance (in total and %). What I want to do is create a list to the right (not sure how to format it) that populates the 10 items from the left with the most variance (units, not %). I would like it to populate the line item from the right as well as the number of units for the variance (columns F and H). Lastly, and I'm not sure if this possible, I might want to just select the items that are greyed out. That is, I would want the line items with the most variance but just from the greyed out lines. If this is not possible without a macro, I don't want to do it.
View 2 Replies
View Related
Oct 22, 2008
I've done the following steps so far:
Tools
VBAFormatProperties
Checked the "Lock Project from Viewing"
Applied a password
and clicked Ok
View 3 Replies
View Related
Nov 19, 2008
is if I F8 through the code it works fine. But when I run the code through the button on the spread sheet. It stops at the Format comand. And says "Can't Find Project or Library." Has anyone ran into this issue or know how to solve it.....
View 2 Replies
View Related
Mar 24, 2009
I'm a noob to programming in XL, and am teaching myself through a project for manipulating vectors. One thing that has me stumped is that when I open the file in which I'm working, I get a "This action will reset your project..." message.
View 7 Replies
View Related
Mar 31, 2009
Is there a way to protect a VBE project using a macro instead of going to the properties and manually typing in a password? I'm using a macro that emails just one worksheet in my workbook (creates a new temp file, emails, and deletes it) but when the new file gets to the recipient the VBE project is unlocked.
I found a way to protect the worksheet before saving the temp file, so the worksheet is protected as it should be, but the project explorer window is completely open. Then anybody can see the passwords I'm using to protect the sheet in the first place. So I need to somehow re-protect the project before it saves and emails.
View 4 Replies
View Related
Feb 13, 2010
I am getting a complie error that I did not get when the code was written. Earlier versions of the same workbook still work fine without error. I hope thie workbook is not corrupted.
The error happens with the None command in this code for a button in a user form.
View 6 Replies
View Related
Oct 21, 2011
If i have a table full on excel data, date, names etc, and I have a userform where someone has filled all that in. On that particular userform I was wondering if their's a way I can get it to write each column over to a sample MS project document.
To save me having to manually change it over?
so on clicking a button, what ever's in sheet1 say it writes out out to specific ms project strips, e.g. start date(excel) written out to data(project)
View 8 Replies
View Related
Dec 7, 2006
I am looking at the code in a MODULE, I can use "F8" to step through it.
But if I have no module just the main project code I cannot find a way to step through it.
View 9 Replies
View Related
Dec 15, 2002
I have written a program in VBA. When I run this program on other computer VB showes "Can't find project or library" error and all of the the common function like "Str" and "Left" and... are not known by BVA. I think I know the reason I have a missing references in my program.
first , can I check it before runing the program by a macro?
second, How can I solve the error?
View 9 Replies
View Related
Jul 7, 2009
As of a few weeks ago the project explorer in VBA on my laptop has started retaining the information on all files/projects opened during the current Excel session so closing a file in Excel does not remove it from the VBA editor.
Furthermore if a file has been opened several times during an Excel session, it appears several times in the project explorer and editing the “dormant” versions does not impact the currently open copy of the file so the whole thing can get quite confusing and result in changes to not being saved.
View 9 Replies
View Related