How To Calculate Work Hours From Only A Start And Finish Date And Time

Feb 28, 2013

I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.

View 1 Replies


ADVERTISEMENT

Calculate Start Date From Finish Date Minus 14 Working Hours

May 7, 2014

I needs a formula (not VBA) to calculate the required start date.

I have to do a job of 14 working hours and this job must be finished on 05-may-2014 13:00

My working week is from monday u/i friday and every day I work from 08:00-16:00

At what time do I have to start the job to get it done in time.

The formula should give this result: 01-may-2014 15:00

View 3 Replies View Related

Mark The Hours On A Start And Finish Time

Mar 25, 2014

I am working on an excel spreadsheet for work and I have to show a chart that shows the time of day a space is in use. Right now I am having to mark all of these by hand which takes me forever because I have a couple thousand lines of information.

I need to mark the hours in use based off the start and finish time.

For Example:
1) If the start time was 7:00 and the end time was 10:45 then the markers would only mark 7am and 10am
2) If the start time was 7:15 and the end time was 10:00 then the markers would only mark 7am and 9am
3) If the start time was 7:30 and the end time was 10:30 then the markers would only mark 7am and 10am
4) If the start time was 7:45 and the end time was 10:15 then the markers would only mark 8am and 9am

I was given the formula and it works to count the whole hour but now I need the formula tweaked and I don't know how...I need the formula to account for quarterly hours...and I don't know how to fix it.

Attached is an example of the spreadsheet of what I currently have and of what I need. Book1.xlsx

View 2 Replies View Related

Subtract Start Time From Finish Time Return Hours Worked As Number

May 5, 2006

I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!

For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50

Start time: 12:30
Finish time: 23:00
Hours worked: 10.50

View 9 Replies View Related

Calculate Time Elapsed Between Start And Finish Dates

Dec 13, 2013

test.xlsx

I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?

View 1 Replies View Related

Calculate Hours If Both The Start And End Time Are In The Same Cell

Feb 27, 2010

Is it possible to calculate hours if both the start and end time are in the same cell. Unfortunatly the developers of our scheduling program developed it so when you export the schedule to excel it shows Greg in A1 and 3:00pm-9:00pm in A2. I would like to have excel calculate the 6 hours so I can use it to auto generate another spread sheet I am making.

View 10 Replies View Related

Number Of Working Hours Between 2 Dates Including Start And Finish Times

Mar 22, 2007

I have 2 dates+ times.

1 the contract start date and time.

2 the contract end date and time.

Can I calculate the number of working hours between these two using a formula?
So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?

Example
Start 06-Mar-07 10:00
End 14-Mar-07 14:00

This is 2 part days and over a weekend.

View 9 Replies View Related

Get Start And Finish Time For Breaks / Lunch?

Apr 15, 2014

I am trying to get the start time and finish time for breaks.

I have 4 columns Name, status, start, finish. In the name column there are multiple names, under status there 6 different status's. and under the time columns there are in and out times dependant on status. I am trying to us index match match. I have tried vlookup and hlookup as a nested function. I keep getting errors.

NameStatus MessageStart TimeFinish Time
Cameron WilliamsTech All & Billing12:31:4812:31:52
=index(starttime,match(name,namefield(match,"on lunch",starttime)))

[Code]......

View 1 Replies View Related

Calculate Hours Between Date And Time Within Business Hours?

Apr 4, 2013

find a formula that will calculate the hours between the two below values but only take in to consideration the business hours (from 9 to 17) and exclude any weekends?

08/03/2013 13:32:00
02/04/2013 09:32:50

View 4 Replies View Related

Subtract The Time Finish & Time Start

Sep 25, 2009

I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.

View 2 Replies View Related

Return Start And Finish Date?

May 25, 2014

I am trying to return start and finish date of events depending on when resources are allocated.

View 4 Replies View Related

Formula For Date And Time Difference Using 8am-5pm Work Hours

Oct 22, 2008

I need to enter a formula that calculates the time a report is received from the time it was recorded in our database. therefore, it needs to exclude non working hours. here are the fields:

A1 2008/10/10 16:30
B1 2008/10/11 09:30
C1 8:00
D1 17:00

A1 = report received
B1 = reported recorded in db
C1 = work day start time
D1 work day end time

Where the answer should = 2 hours.

I am not an experienced excel user and so far the only formula I have now is: =TEXT(B1-A1, "d:hh:mm")

And how do I account for weekends?

View 9 Replies View Related

Calculate Start / Stop Time And Also Include Date

Mar 13, 2014

I have a small project at work where I am being asked to put a simple spread sheet that will calculate a start/stop time - and also include the date. For example:

Start time 5pm, date: 3/13. The spread sheet to auto calculate what the stop time and date will be if a specific amount of hours is to be calculated. For example in this case, 12 hours. From calculating in my head that would be 5am the following day. However, how can I get this in excel to work and therefore all i would have to do is enter the start time and date, + 12 hrs, and excel would calculate the time/date after the additional 12 hrs.

View 3 Replies View Related

Calculate Date/time Format Over 24 Hours

Nov 22, 2006

I need to calculate the difference between two cells that are formated like this: 11/10/2006 13:00. Simple subtract only works when the date hasn't changed (the subtract formula seems to focus on the time and ignore the date).

I found a formula that will work, but the results are in regular numbers, I need the hh:mm format and if I change the format of the result column, the time displayed is wrong.

The formula is=((B2-A2)*1440)/60)

If my result is 122.6 in regular numbers, when I convert to hh:mm I get 14:00.

Is there a better way to do this? Also, is there a way to eliminate weekend & holiday hours from the calculation? This is not as important as getting the results to calculate correctly in the hh:mm format.

View 9 Replies View Related

Calculate Number Of Hours Between Two Date/time Combinations

Jan 21, 2010

I am trying to find a way to calculate the number of hours between date/times found in separate rows. The attached data set will help to envision what I am talking about.

For each couple of rows, I need to find a way to calculate the number of hours elapsed from row 1 to row 2. In the first example, to calculate the number of hours between 12/2/2009 8:56:51 and 12/4/2009 6:35:27.

View 2 Replies View Related

Calculate Future Dates From Start Date With Varying Time Period/cycle

Sep 11, 2009

I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.

For example:

I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.

I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.

I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).

View 14 Replies View Related

Employee A Date Line Of Time Of When Pieces Should Be Finish

May 29, 2014

1-The employee takes 13 minutes to build each piece

2-The employee starts at 7:15 am

3-The employee goes to lunch from 12:15 pm to 1:00 pm

4-I need to give the employee a date line of time of when pieces should be finished. Taking into account the time he/she takes lunch.

View 2 Replies View Related

Calculate Hours Worked Based On 2 Start/End Times

Feb 14, 2008

It's been several years sine I had to look at calculating amount of time worked.
Can you please look at this old spreadsheet of mine and verify that the formula is correct?

It appears to be ok to me, but I don't want any errors when it comes to paying my employees

Formula: ...

View 4 Replies View Related

Calculate Each Employee Work Hours

Apr 11, 2013

Just like if I put the employee's number and work time for each day,

The excel will accumulate the hours automatically somewhere in the sheet. (I don't want the total hour cover each day's work time)

Is there anyway I can do it?

View 5 Replies View Related

Calculate Employees Work Hours For Overtime?

Apr 15, 2014

I have to calculate employees work hours for overtime.

in the timesheets:

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 13:00 <----- total for cell D2,D3, and D4 is more than 40

A B C D E
1 ID Date Code Hours PayMethod
2 A123 4/14/14 TRN 20:00 Regular
3 A123 4/14/14 TTT 15:00 Regular
4 A123 4/14/14 TRN 5:00 Regular <----- to make 40
5 A123 4/14/14 TRT 8:00 Overtime <----- 13-5=8, so i have to write down 8 here for overtime

How can I do this?

I want to make a command button for macro to perform this.

View 2 Replies View Related

Automatic Finish Date & Time With Lunch Break And Bank Holidays

Feb 13, 2010

I would like a solution for the automatic calculation of the end date and end time for project tasks. I have already spent hours on the issue, thanks for any help on this.

The parameters are:
A1 = Start time 08:00
B1 = End Time 17:00
A2 = break lunch 12:00
B2 = back from lunch 13:00

Task parameters

A5 = start date 01/03/10 (entered manually)
B5 = start time 10:00 (entered manually)
C5 = duration 02:00 (hrs entered manually)
D5 = "end date" >>> (to be calculated exluding breaks and holidays)
E5 = "end time" >>> (to be calculated exluding breaks and holidays)

the next line should be filled in automaitically according to the hours needed and the previous end date & time

A6 = "start date" >>> (after line 5: to be calculated exluding breaks and holidays)
B6 = "start time" (after line 5: to be calculated exluding breaks and holidays)
C6 = duration 14:00 (entered manually)
D6 = "end date" >>> (to be calculated exluding breaks and holidays)
E6 = "end time" >>> (to be calculated exluding breaks and holidays)

and so on for every new line down.

View 9 Replies View Related

Calculating Hours With Midnight As A Start Time

Oct 1, 2009

I’m working on a timesheet and I need to separate the hours worked that are before 6 am from all the others. For example if someone works 1:00 am to 8:00 am I need a cell to populated with 5 representing the hours worked before 6 am. The formula below works fine except when the start time is 12:00 am. I am also having trouble if the start time is before midnight like in a 11pm to 5 am shift.

=(IF(AND(S3<=$AG$97,S3>=$AG$73),(($AG$97-S3))*24,0))

S3 is the start time

AG97 is 6:00 am

AG73 is 12:00 am

View 4 Replies View Related

Calculating Start / End Time Between Night Shifts 24 Hours?

Dec 26, 2013

We have a person who work in 24/7 support. One person work passive 24 hour, but it 24 hours are divided in to next shifts: normal 06-18, over hours 18-22, night hours 22-06.So if we have some one who is supporting client say from 17h till 23h, we have next results:

Name Start time End Time 06:00 - 18:00 18:00 - 22:00 22:00 - 06:00

John 17:00 23:00 1:00 4:00 1:00

Is it possible to in time range enter formula who subtracted end time from start time, but taking into account 24 hours?

View 9 Replies View Related

Calculate Difference Between Dates In Work Hours With Lunch Period

Mar 8, 2013

I need also to calculate difference between dates(dd-mm-aaaa hh:mm) in workhours ( hh:mm):

The work period is 9-18 with lunch interval 13-14 The startdate and end date could be out of the work hours and i can't include the extra hours. I can have several days (workdays) at the difference, but i should maintain the format hh:mm.

Ex1:
Startdate 05-03-2013 18:34 ( date to calculation should be 05-03-2013 18:00)
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )
will be equal to:
Startdate 06-03-2013 8:34 ( date to calculation sould be 06-03-2013 9:00 )
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )

Ex2:
Startdate 06-03-2013 12:01
End date 06-03-2013 14:28
Time Difference 01:29

View 3 Replies View Related

Using Userform To Calculate Time To Sheet From Start Time?

Jun 19, 2014

I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?

View 2 Replies View Related

Start/Stop Timer For Hours Worked To Include Break Time

Oct 15, 2007

I have a timesheet where user updates start and end time for various tasks.

I have placed a time capture button in the excel sheet (which is simply a macro saying =now() function)

The user clicks it before starting and after finishing the task. The start and end times are captured in adjacent cells.

If the user starts the work, and goes on a lunch break say for 20 min, comes back finishes the task and captures end time, the time difference will not consider break time which is non productive.

How can I incorporate something like 'pause' option so that before he goes for lunch he can temporarily pause the time.

View 9 Replies View Related

Calculating Time To Track Work Hours

Jul 24, 2009

I can't figure out how to do a proper formula for calculating time. For instance I have one column that says "Time In", the next is "Time Out" and the other is "Lunch Time". My calculation needs to be this:

Find the total hours between the Time In and Time Out and then Minus the lunch time to get total hours worked for the day. The only way I can get this to work is using 24 Hour time format. Is there another way?

View 3 Replies View Related

Calculating Start And Finish Times For A Process

Feb 22, 2010

I have a number of processes that I would like to calculate the finish times of.

For example, Process A may take 18 hours to complete, Process B may take 28 hours to complete and Process C may take 125 hours to complete etc

However these processes only run during certain times, i.e. 9am to 5pm.

Ideally I would like to setup a spreadsheet that when given the start time and process time calculates the (date and) time the process will finish.

I can get it to work on a 24 hour day but I've been tearing my hair out trying to take out the none-working part of the day (the 5pm to 9am).

View 9 Replies View Related

Providing A Start And Finish Cell Into A Range

Jan 23, 2007

I need to create a range of cells in Column A. I know the first cell, A2. The final occupied cell will vary. Once I have the range object I would like to step through and analyse each cell in turn using a For/Each loop.

The code I have so far is:

Public all_structures As Range 'Range required for for/each loop Column
Public last_structure As Range 'Last cell in Column
Public molcell As Range 'Current cell in range

' Establish range of cells in Column A

Set last_structure = Range("A2").End(xlDown)
Set all_structures = Range(Range("A2"), Range(last_structure)) ***

' Loop through each structure in turn
For Each molcell In all_structures

Loop code In here

Next molcell

When I run I get an error message of "Run-time error '1004': Method 'Range' of object '_Global' failed". It does not like the line marked ***.

View 3 Replies View Related

Operational Model - Shift Start Time Plus Amount Of Hours Worked In One Cell.

Feb 19, 2009

Is it possible that a cell contains both numeric and alphanumeric data and to do calculations on that?
For example: if a cell conatain the value "10a" or "8.5b" etc. Would it be possible to have a column that gives me the hours worked (the numeric value in the cell) and a line that gives me the amount of people that are working on shift "a" (the alphanumeric value in the cell).

Is this at all possible? Or does that require VBA/Macros and stuff (in which case this is posted in the wrong part of the forum )

View 5 Replies View Related