Determine Days Based On Due Date

Sep 1, 2007

I am attempting to create a template to input specific dates. If a student submits an assignment on the due date, I have set up the spreadsheet to conditionally format whether the assignment was late or not. In addition, I have a column for when feedback is to be submitted and whether it was on time or not. My problem is this...

I cannot figure out a formula or a way to determine:
If the student submits the assignment late, when will the feedback be due? For example, if submitted one day late, the instructor has an extra day to submit feedback.Two days late is an extra two days to work on it etc..

View 4 Replies


ADVERTISEMENT

Determine A Specific Date Based On A Number Of Business Days?

Feb 11, 2010

I'm documenting the steps of a process with each step accounting for a specific amount of business days. How do I determine the specific business day based on the number of days it takes to complete a process? For example: Start date then 45 business days from that date the next step begins...then 3 business days from that date the following step begins and so on.

View 5 Replies View Related

Formula That Will Determine The Number Of Days That Fall In A Specific Month Based On A Date Range

Jul 31, 2009

I'm needing a formula that will determine the number of days that fall in a specific month based on a date range. For example, if I have a date range of 10/15/2009 to 01/13/2009, I need the formula to determine the number of days in each month within the range (October has 15 days in the date range; November has 30, December has 31, and January has 13.) I have a large spreadsheet that would be so much easier to manage with such a formula. Currently, my spreadsheet is setup as follows. I need the forumla automatically fill in the number of days under each month.

Stard Date End Date Oct-09 Nov-09 Jan-10 Feb-10
10/15/2009 01/13/2009

I'm using Excel 2007.

View 9 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Number Of Days To Add To Date Based On Weekday Of Date

Apr 23, 2008

I need to create a formula that states a delivery date when the order date is entered in an adjacent column. Items ordered on Monday, Tuesday and Wednesday will be delivered the Friday of the following week, eg. ordered 23rd April 2008, delivered on the 2nd of May 2008. Items ordered on Thursday or Friday will be delivered on a Friday 2 weeks later, eg. ordered on the 24th April, delivered on the 9th of May 2008

View 4 Replies View Related

Calculate End Date Using Start Date And Number Of Days Excluding Specific Days

Nov 22, 2013

I want to calculate the end date of my German courses. This is how it works:

A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.

Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.

Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.

The workday function on excel cannot do this and I do not have any programming skills to work with VBA.

Legend:
*LU = lesson units; 1 LU is 45 minutes

Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14

[Code] ...........

View 7 Replies View Related

Total Days In The Month Based On Date

Jul 4, 2008

is there a formula that will say how many days there are in a month ?

B9 contains the a refrence to the first day of the month eg 1/7/2008 I want the cell above it (B8) to return 31. If the date reference is 1/6/2008 I want (B8) to return 30.

I'm using it to pro rata by the number of days in a month.

View 9 Replies View Related

Add X Days To Date Based On Time In Another Cell

Apr 23, 2008

I have a date in col A and a time in col B. I'm trying to use an if function so that if time in Col B is greater than 15:30, the date in col A is returned plus one day. If time in col B is less than 15:30, date in col A returned with no change.

View 4 Replies View Related

Selecting Between Two Date Ranges (based On Days In Month)

Jul 8, 2014

I have a list of data that displays data by day, I want to select only the data for the for the current month and then the same day time frame for previous months in the data set.

E.g.

Today's date 08/07
Full days into month 7

Formula to sum data in columns B that only looks at dates 01/07-07/7

I will the adjust that formula for a January date that only pulls data for 01/01-01/07

Then repeat for Feb-June

View 3 Replies View Related

Userform VBA Which Will Determine Business Days

Feb 18, 2009

I have created a useform in VB which will determine business days. I need help in the coding part.

In my user form I have text box, I have a calender and I have two command buttons, 1 Calculate 2 exit. What i would like to achieve is when i type a number in the txtbox and press cmd button calculate the code will shade the the date in the calender so for example if I type in 10, then the code should shade 13/02/09 on the calender since 13/02/09 is the 10th business day.

View 9 Replies View Related

Determine Work Days Between 2 Dates

Mar 13, 2008

My workday function doesnt seem to be working correctly, it is including weekends.

My Spreadsheet is like this
A1= 01/01/2008 ( Date)
A2= 30
A3= =WORKDAY(A1+A2,0)

I am expecting the result to be 11/02/2008, but i am getting 31/01/2008.

View 3 Replies View Related

Change Cell Colour Based On Number Of Days Before Date?

Jan 17, 2014

creating a cell to show: no colour unless
date minus 90 days as amber
date minus 45 days as red

View 6 Replies View Related

Counting The Number Of Days Overdue Based On Date And Time?

Jun 17, 2014

I have the following:

A1 = Date item is due. (DD/MM/YY format)

A2 = Time the item was delivered (HH:MM:SS format)

B1 = Actual Date item was delivered.

B2 = Actual Time item was delivered.

I'd like C1 to count the number of days the item was late. - taking into account that 16:00:00 is the deadline on each date.

For example:

Due Date: 17/06/14 @ 16:00:00

Arrival Date: 17/06/14 @ 16:01:00

Days Late = 1

Due Date: 17/06/14 @ 16:00:00

Arrival Date: 18/06/14 @ 15:00:00

View 10 Replies View Related

Counting Number Of Days Overdue Based On Date And Time

Jun 17, 2014

I have the following:

A1 = Date item is due. (DD/MM/YY format)
A2 = Time the item was delivered (HH:MM:SS format)

B1 = Actual Date item was delivered.
B2 = Actual Time item was delivered.

I'd like C1 to count the number of days the item was late. - taking into account that 16:00:00 is the deadline on each date.

For example:

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 17/06/14 @ 16:01:00
Days Late = 1

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 18/06/14 @ 15:00:00
Days Late = 1

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 18/06/14 @ 16:01:00
Days Late = 2

View 3 Replies View Related

Date Function - Calculate Ratio Between Months Based On Working Days?

Jul 25, 2014

I have added 3 tables data .. also I had created a sample solution calc for emp1 and project1 ... I need to calculation the ratio between the months based on the working days and allocate the efforts accordingly.

View 2 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

How To Auto-Populate Date Range (working Days Only) From Start Date And End Date

May 25, 2014

I am now trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.

View 1 Replies View Related

Create Formula In Column B To Add 4 Days To Date Based Upon Column A

Apr 3, 2014

I have a form in which users will manually enter a date in Column A. I would like to create a formula in Column B which will add 4 days to the date based upon Column A. However, the 4 days should only be added to a select set of dates which I would like to specify. If the date is not found in this select set of dates, then the result in Column B should be the same date as Column A.

View 3 Replies View Related

Date Countdown: Results Of The Number Of Days Between Today And A Future Date

Apr 8, 2009

I am trying to get the results of the number of days between today and a future date. I am using ="cell containing futuredate"-today() and it gets me the correct number of days. The problem comes in when I have yet to populate the future dates. I am getting -39991 (numeric value between today and jan 01 01) and because I am also using conditional formatting this is even more of a problem. Is there a way get excel to display nothing if it is a negative number? or to give a specified resut if the number becomes negative such as Expired or something of that nature?

View 3 Replies View Related

Calculate The Number Of Days From A Date Entered Into Cell A1 To Today's Date

May 19, 2009

I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:

5/10/2009 to today is -9

5/22/2009 to today is 3

View 2 Replies View Related

Counting Days Positive Or Negative Between Date (inserted Value) To System Date?

Mar 19, 2012

how can i count the positive days to a inserted date value or the past days (negative value) to the system date (today).

View 5 Replies View Related

Macro To Alert If Today's Date Is Within 5 Days Of Expected Delivery Date

Sep 18, 2008

I have a worksheet that has a sent date and expected delivery date I need create a macro that will alert me if today's date is within 5 days of expected delivery date.

View 14 Replies View Related

Calculate Number Of Days Between Two Date Within A Current Month Including End Date

Apr 2, 2009

I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.

For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.

View 9 Replies View Related

How To Auto Populate Date Range (working Days Only) From Start And End Date

May 26, 2014

i am trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.

View 4 Replies View Related

Extract Character From Date Format & Number Of Days Between Date

Jan 17, 2010

I have two questions regarding date format and hope you can provide input.

1) say 01/01/2010 displays as Jan-10 and i need a new column to state it as JAN. What function should i use to achieve it?

2) i need to state the difference between first day and last day of the month. What function should i use to achieve it?

View 2 Replies View Related

If Date Cell Less Than Todays Date Calculate Difference In Days

May 13, 2008

I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"

View 7 Replies View Related

Formula For Date Minus Date = Number Of Days

Nov 15, 2008

I was wondering if anyone knows how I could enter a date in one cell, then another date in a second cell and in a third cell have it have it so it minuses the first date from the second and calculates the difference outputted in number of days.

Example: 04/31/08 - 04/01/08 = 30 (days)

View 2 Replies View Related

Determine Last Modified Date

Oct 1, 2008

I have a pivot table for which I load data from a .csv file. Is it possible to include a timestamp on when the .csv file was last loaded. If I do it above the actual pivot table, it just shows when the pivot table was refreshed, but not when the .csv file was last loaded.

View 4 Replies View Related

Determine Month Of Date

Oct 31, 2006

how to put this in

If the date in C3 = January 31 then do something.

I don't know how to put the date part in code.

View 5 Replies View Related

Determine Weekday Of Date

Sep 19, 2007

The code is ok until I hit a month with 4weeks in it and days left over.
The code puts a week total in place of a Sunday, but as some months end before a Sunday appears the code just builds a Month end total sheet.

What I need in this case is a Week total even if there is no Sunday before it builds the Month end Total.

I hope i'm being clear

Sub NewSheets()
Dim Dte As Date, Dy As Date
Dim i As Long, j As Long, Dys As Long
Dim CountWeek As Boolean
Dim Shts As Long...

View 3 Replies View Related