Excel 2012 :: Bar Graphs With Two Different Axis
Jan 6, 2014
Excel 2012 user.
I am trying to create two vertical axis bar graphs with the Primary axis for period Q1 to Q4 and the secondary axis for FY. I have attached what I have done so far and have successfully converted all but one FY bar graph to secondary axis. Once I try to select the last one (dark gray bar called "2011 FY" on the very far right), the FY bars disappears.
My main purpose is to get both Q1-Q4 & FY on the same graph and the reason I plotted FY on the secondary axis is because I didn't want the FY $ scale to massively skew the entire graph.
Sample Report 06JAN14 - Bar graph with two axis.xlsx
View 5 Replies
ADVERTISEMENT
Jun 18, 2014
I have two graphs, graph 1 and graph 2.
The y-axis of graph 1 is set to Auto.
My question: is there anyway to get graph 2's y-axis to change to whatever graph 1's y-axis is automatically?
View 1 Replies
View Related
Apr 2, 2013
I am putting together a graph and my manager wants the companies with a zero value in the bar chart to stand out (0 = really good). The only thing I could think of was making the individual x-axis label's font turn green if value was zero. Is there any way to accomplish this? (Additional: This chart will be updated every month with new data so I do not want to change by hand every month).
View 4 Replies
View Related
Sep 16, 2012
Two graphs with different scale x-axis.
Graph No. 1 with smaller time frame, Daily.
Graph No. 2 with larger time frame, Weekly.
Objective: Add vertical line to mark the same times in both graphs.
Trouble is both graph already utilise the secondary axis. VBA is allowed.
View 6 Replies
View Related
Jul 15, 2014
If seen a couple of examples but for whatever reason it doesn't work on my sheet. (Excel 2010 32 bit) I don't understand how to highlight the entire column to see this particular value is not in this list. I have two lists, I want to see what data am I missing In list 2 that I have in list one. Basically all I am trying to do is see what values are not in the second list but are in the first list so I can later add them to the second list. (Also the 2nd list is longer than the first if that makes a difference.)
View 3 Replies
View Related
May 13, 2014
I've put together code to construct a chart
It all works fine but I've noticed an odd quirk which I can't explain nor can I seem to fix. Here's the (reduced) code :
Code:
Dim appExcel As Object ' Excel Application
Dim chtPareto As Object ' Chart
Set appExcel = CreateObject("Excel.Application")
Set chtPareto = appExcel.Charts.Add
With chtPareto
' Primary category axis
[code]....
The category (x) axis title should be horizontal, whereas the value (y) axis title should be rotated. Stepping through the code, when I .SetElement for the category axis title, it appears horizontal as planned. However, as soon as I .SetElement for the rotated value axis title, the category axis title also rotates.
View 3 Replies
View Related
Feb 8, 2009
Two questions:
1) How do make values on x-axis as words? E.g. apples, oranges, etc.
2) Is it possible to have the numbers on x-axis in descending order? If I can figure out 1), I can do this as well, but it would be nice to know if it is possible to have the numbers on x-axis in descending order.
View 8 Replies
View Related
Feb 12, 2014
i have attached a sheet where I have 4 graphs on one sheet. I prefer this to an overlay. I would like to add a 5th graph but it would make all the the graphs too small. Is there a way to make the graph background longer. For instance, extend the length of this so that I can put multiple graphs on it and then just scroll from top to bottom to review them? Also, how do I copy and paste these individual graphs into a newly created graph. copy/paste doesn't work on these?
Boiler.xls
View 1 Replies
View Related
Apr 3, 2012
I am currently working through data received from several experimental runs I have done for my masters studies (In chemical engineering). I need to create a chart for every experiment but coding the macro to do that has been near impossible. I have the file with the first graph drawn but I dont know how to post it.
I know it will be possible to draw every chart by hand but I am waiting on another 300+ data sets and then the amount becomes crazy.
View 4 Replies
View Related
May 6, 2014
I have an excel that gets updated monthly for reporting. The goal is to get the graphs to update automatically by linking them from excel into power point. This is relatively easy but what when I go to update the report for the next month the data for the old power point changes as well. Is there a way to prevent this?
View 1 Replies
View Related
Mar 22, 2013
Is it possible to subtract a year from a cell that has 2012/2013 in it? For example, if A1 says 2012/2013, how can I get 2011/2012 to display in A2?
View 3 Replies
View Related
Sep 5, 2012
I want to prepare a graph / chart for the column A and column B. Column A has headers and B has the data that I want to represent in the graphs. The real problem in this is that the two columns length is not fixed. For eg. for January Column A & B could have 5 rows of data but for February they could have 10 rows of data. I dont want to prepare the chart manually every month. I want that if we could apply any VBA coomands that could prepare the chart automatically irrespective of the rows count.
View 9 Replies
View Related
Apr 27, 2013
I am using Excel 2010 to create a simple chart. When I enter the information, highlight it and select a chart, the chart area appears blank. It doesn't matter what kind of chart I choose- it still appears blank. I've tried going into the Advanced options and indicating for All objects to be shown and that didn't work.
View 1 Replies
View Related
Jul 14, 2014
Plotting of bar and line graphs given an arrays of x and y values in VBA? I want to plot the rDateRange and rOEERange.
Code:
Dim rInitialDate As Range, rFinalDate As Range, rDateRange As Range, Calculation As Worksheet
With Worksheets("Calculation")
Set rInitialDate = .UsedRange.Find(What:=DateValue(InitialDate), After:=.Cells(1, 4), LookIn:=xlFormulas, LookAt:=xlWhole, SearchDirection:=xlNext, SearchFormat:=False)
[Code] .........
View 2 Replies
View Related
Jul 6, 2014
I've been trying to get a graph that looks like the image below for a while now and can't seem to get it to appear how I want. I am looking to duplicate it exactly, but the issue I'm having is getting the individual bars to be separate and appropriately spaced.
[URL] .....
View 7 Replies
View Related
Apr 14, 2014
I've been using a VBA code to look through my spreadsheet and find any graphs in any tab and move it to powerpoint. I have about 70 tabs with 7 graphs each.
I have is that the order of the graphs in the slidepack isn't in the same as found on each excel tab.I also tried renaming them (chart1-chart7) but problem still remains.
View 3 Replies
View Related
Jan 10, 2014
I have a perfectly working pivot table and I would like to make some graphs based on the report filter. My report filter has 4 categories, with each more than 10 sublevels.
When I make one pivot graph/chart, this goes fine, the data is ok, and I am happy. But one I make a second, and thus adjust the report filter, the first graphs changes according to the filter. I dont want that to happen
Ultimately I would like a powerpoint presentation with multiple charts, based on one table, with different report filter filters. Updated ONLY on the values, not the filter.
View 4 Replies
View Related
Mar 1, 2014
I have a spreadsheet with golfers handicaps, golfers names down the left in column A in rows 3-35. Row 2 has the event numbers titles 1 to 18 (18 events in a year). i need a graph that has the person as the vert axis and the horizontal axis needs to be the event numbers, so i can read down for the person and across to see how there handicaps change from each different event. i have attached the data below.
View 1 Replies
View Related
Apr 20, 2007
I have some numeric data that has to be put on a log chart. but there is no option for log charts. so i converted my data to log and then drew a chart but i am unable to edit the axis intervals and starting axis value. whenever i change the value it gets back to its default value,ie 1. can anyone tell me how to draw log chart or how to edit axis intervals and starting axis value?
View 6 Replies
View Related
Dec 10, 2012
I need to create a graph with a 2 x axis and a single y axis. For example:
Pressure ( PSIA) Solubility (mol %) Velocity (m/s)
200 0.024 1
300 0.036 1.2
400 0.041 1.8
I need the two x axis to be pressure and solubility and the y axis to be velocity, with the data being demonstrated by a single plot (I have only managed it with two plots which does not demonstrate solubility's relationship to pressure ).
For example at a pressure of 200 PSIA (lower x-axis) and solubility of 0.024 mol % (upper x-axis) velocity was found to be 1 m/s.
View 1 Replies
View Related
Mar 15, 2013
Excel chart that whenever I am defining than X axis value then excel chart will show 2 unit more than whatever is my maximum value.
View 3 Replies
View Related
May 12, 2013
I want to draw a chart in Excel, in X axis Dates and in Y axis some other data. The dates which fall Saturday and Sunday will show in RED colour. Other dates will show in default colour.
View 7 Replies
View Related
Mar 26, 2014
I am trying to reproduce a graph similar to this: [URL] ....
How to get the Y axis in the center and two distinct bar charts on either side.
Sample data can be found here: [URL] ....
View 1 Replies
View Related
Sep 27, 2006
how to incorporate another category and value axis to my existing chart.
1. I need to add a rank axis derived from my data column (C6-C15). This column should rank from highest to lowest and create a tie if any number is repeated. I have arranged the rank column in cells B38:L38 as they would appear. I would like this to appear on the top or bottom of the bar graphs.
2. Second I need to add the frequency of hits which = 3 derived from cell J1 This should appear on the chart were it is currently titled. This should create another bar graph colored green and labeled 3.
3. Lastly the numbers axis can remain the same as it appears on the chart or if it would be better to align as shown in cells B43:L43.
View 5 Replies
View Related
Jan 26, 2008
What is the best way to have both horizontal and vertical axis as value axis?
View 2 Replies
View Related
Sep 9, 2012
I'm trying to look up information in "pi" by entering a time that you want to look up say 1800 or 935 and have a cell that would enter it as todays date with that time so I can use it as a timestamp in "pi"
View 1 Replies
View Related
Dec 27, 2012
I have a simple reporting sheet where the data for orders place is in one sheet and on the other sheet is an imput box for 'date' and it filters through and presents a table of data and two graphs for the date chosen.
I give a daily report (contents of this sheet) but I also need to leave this sheet available for anyone to open and change to another date.
I want to copy the repor sheet into a new one and email but I want the graphs to remain, not go blank when anyone changes the original sheet.
Excel 2007 / Windows 7.
View 3 Replies
View Related
Apr 12, 2014
I'm having trouble getting the dates i want on the horizontal axis on a chart in Excel 2013. I want 12 dates along the axis starting at 01/01/2013 then each month until 1/12/13 however as you can see the dates are 01/01/1900.
View 10 Replies
View Related
May 21, 2014
I realize all the numeric data was originally not in percentage format (a simple division without being multiplied by 100). So when I set the vertical axis to percantage format, it does display it as a percentage but with the "%" sign. Is there any way I could get rid of the sign? It's not necessary as the axis has already been titled accordingly. I'd hate to redo all calculations, multiply by 100 and then create new charts only to get rid of the sign...
View 1 Replies
View Related
Aug 4, 2014
I have a set of data for hours of work. I want to make a simple Pie Chart: % of Hours worked overtime, and % of work not overtime.
The Data Looks something like this:
Name,Normal Hours Worked, Overtime Worked
David,8.0,3.2
Anne,8.0,1.3
Danny,7.0,0.0
Harry,8.0,3.0
Edward,8.0,2.3
So I want a pie chart that has 2 wedges.
~25% labeled as overtime worked
~75% labeled as normal hours worked
Whenever I put these values in the pivot table and use SUM, it is trying to sum based on # of hours matching, instead of by the column Name... so it gets divided into a bunch of different pie wedges.
View 2 Replies
View Related