Filtering By Dates Not Working Correctly?
Jun 26, 2014
[Code] ....
In column F I have a list of dates (dd/mm/yyyy).
I can manually filter dates ok, but want to set it to part of code to use automation for a report.
The code when run, finds nothing, where it should. I tried using [CDate] also but also same result.
View 3 Replies
ADVERTISEMENT
May 1, 2013
I have a command button on my form that unloads it when i am finished. But i have to press it 20 times before it closes. The only line i have in the code is "UnLoad Me"
View 7 Replies
View Related
May 12, 2006
I'm try to get the pos. placing in a auto sorted table to remain in place
i.e. 1st next to the top position. 2nd next tothe next position and so on down. but it keeps getting it wrong! I've tried amending the macro serval times but it makes things worse! Sorry can't attach the file, too big for this forum!!!!
View 2 Replies
View Related
Jun 10, 2013
I have a list a time (HH:MM:SS) that i want to sum together to get the total number of minutes.
It works if I use simply add A2+A3+A4 etc, but not when I use sum(a2:a4).
There are over 2500 lines of data.
Sheet attached : times.xlsx
View 3 Replies
View Related
Apr 11, 2007
This vba code is supposed to move the cursor to the Cacluate1 command button when the user clicked on cell H6.
Private Sub Worksheet_SelectionChange(ByVal Target As Range)
If Target.Address = "$H$6" Then Calculate1.Activate
End Sub
The only changes that I have made is a change to a private sub worksheet_change(ByVal TArget as Range). Would these changes have anything to do with this no longer working?
View 9 Replies
View Related
Aug 22, 2012
I'm compiling a list of names on a separate tab from a column that only lists the names sporadically. Problem: In the formula, the IF provides a TRUE, the row function, and consequently, the INDEX function (when I hit F9) provides the correct "name" and row number, but when I hit return, it provides the text 4 cells beneath what it should.
=IF(ROWS(F$5:F5)
View 7 Replies
View Related
Mar 5, 2013
I have data that shows titles as 2-Feb, 2- Mar; which is really typed in as 2/5/2012 and 3/15/2012. My chart when graphed keeps showing the X-axis as 1-FEB and 1-MAR. How can I get the graph to show the x-axis titleas as 2-Feb and 2-Mar?
View 3 Replies
View Related
Jan 3, 2014
I've tried for some time now to create a chart where the x-axis make up for irregular dates. Making the line between 2 points longer if it's long time between them and short if it's short time between them.
I've finally understood line charts doesn't support that and I have to use scatter graph. It seems to work but the dates, the get all messed up. I type 2014-11-11 but the x-axis in the graph shows 2283-12-12 or something like that.
Got a notion that I might have to transform it to the date value manually first but I get #VALUE ERROR
i.e. 2014-11-11 in A1, then I type in A2 =DATEVALUE(A1).
How do I get a chart to work with irregular dates correctly?
View 4 Replies
View Related
Jun 2, 2014
I got a problem with displaying my dates correctly on the X-axis of my combined column - line graph. For some reason X-axis labels appear as consecutive numbers with regards to number of data points. Please see attached.
Also, why does the indent change as seen in this screenshot?
Last but not least, how can I prevent my secondary axis label from coinciding with the labels as seen here?
May_Daily_and_Total_Revs_by_date.xlsx‎
View 4 Replies
View Related
Aug 14, 2014
Screenshot (72).jpg
This is probably a really stupid question, but I can't for the life of me figure it out. I need to do some very basic filtering, but the dropdown box where you check off the things that you want to filter by is not defaulting to show checkboxes. This didn't seem like a big deal at first, but it's made it impossible to filter all but one things. For instance, to filter everything but values that are 0, I would have to manually click every single value in the dropdown box. Clicking "select all" is doing literally nothing. It's this way for all my excel documents. how to get the boxes back? I've included a screenshot of what comes up whenever I click on the manual filter button to show what is coming up.
View 12 Replies
View Related
Jan 31, 2014
I'm trying to write a macro that filters a table via textbox (criteria), specifying the column to filter through a combobox. I managed to get it to work with every format (date, text, etc.) except with numbers. I'm attaching the file so you can take a look at the code.
If I have a column containing numbers but the cells have text format and I reformat those cells to numbers (using points to separate thousands [I'm from Venezuela, we use dots, not commas]) the results aren't visible unless I modify each cell individually. How can I avoid this?
Lastly, I'm using a macro that I found online that sets invisible shapes on each cell of the header and asigns another macro to these shapes to sort by ascending or descending order in the column over which the shape is put. I made some changes to the macro that actually sorts the values and it works fine, but sometimes I have to resize the shape (on the left side) so that it's further inside the cell or else I'll get an error.
EDIT: It doesn't work with dates either!
EDIT2: I tried copying the table and the codes to a new workbook and now magically it works with numbers, but still not working for dates. Also I'm still having to resize the invisible shape (only in header of the first column ('C')) and the changes in format still aren't visible unless I modify each cell. I think this last issue has something to do with 'SortOneTime' macro or the 'Ordenar' macro because it happens after I run them.
Tabla General (Nueva) (Combobox).xlsm
View 1 Replies
View Related
Feb 15, 2009
If I give excel the advanced filter criteria <=2/15/2008 it seems to list all the dates prior to and on that date. Are there any pitfalls to this filtering technique (i.e. would any dates fall through the cracks)?
View 2 Replies
View Related
May 30, 2007
I have a three columns of data in A,B,& C.
In column A a From Date
In column B a To Date
In column C a 6 digit number
I would like some code to achieve the following in this order:
1) Find any duplicates of the 6 digit number in column C and then place them on the same row as the first.
I.E if the following three matches are somewhere in columns A, B and C:
A B C
08/07/2007 22/12/2007 731655
22/12/2007 29/12/2007 731655
29/12/2007 05/07/2008 731655
I want them to place on the same line in date order like:
08/07/2007 22/12/2007 731655 22/12/200729/12/2007 731655 29/12/2007 05/07/2008 731655 (this line would be on the line above)
2)After all the above has been done I would like the code to go through and looking for matches of dates between column B and A
For example if I had the below two dates somewhere in the list:
A B C
08/07/2007 04/08/2007 729955
04/08/2007 01/09/2007 729293
I would want the bottom one to be moved to the same line as the top like:
A B C D E F
08/07/2007 04/08/2007 729955 04/08/2007 01/09/2007 729293
If there are more than one match like below:
A B C
08/07/2007 04/08/2007 729955
04/08/2007 01/09/2007 729293
04/08/2007 01/10/2007 729273
I would like the following:
A B C D E F
08/07/2007 04/08/2007 729955 04/08/2007 01/09/2007 729293
04/08/2007 01/10/2007 729273
3) AFter this was completed I would like to look for date matches one day apart for example:
A B C
08/07/2007 04/08/2007 759955
05/08/2007 01/09/2007 759293
And then place the bottom set of date along side the top like:
A B C D E F
08/07/2007 04/08/2007 759955 05/08/2007 01/09/2007 759293
View 9 Replies
View Related
May 12, 2008
I have a simple excel sheet and two of the columns show a Due Date and a Received Date. All I want to do is highlight any cell in the Received Date column where the Received Date is greater than the Due Date. The spreadsheet shows Purchase Orders and shows when they were due to be received and when they actually were received. i'd like to be able to show all orders that were received past their due date.
View 9 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Mar 10, 2013
How can I use a pivot table or advanced filter or macros to view rows by
Only today’s date (1 row) ?Only this week ?Only last week ?Only last month ?Only last 12 months ?All dates ? That is, rows are headed by day. I select the rows that I view.
View 2 Replies
View Related
Sep 26, 2011
I'm trying to filter a list between two dates that are selected using drop down lists in Cells CZ1 and CZ2.
The first part of the code works ok ie it filters the list by column 28 as "Shipped" only.
The second part is causing me trouble.
The third part sorts the list by date order based on column 48 and this also works ok.
Code:
Sub FilterTransactionDates()
With Sheet1
.AutoFilterMode = False
.Range("A1:CU1").AutoFilter
.Range("A1:CU1").AutoFilter Field:=28, Criteria1:="Shipped"
.Range("A1:CU1").AutoFilter Field:=48, Criteria1:>=Range("CZ1").Value, Operator:= _
xlAnd, Criteria2:
View 5 Replies
View Related
May 28, 2014
I am using Excel 2010, and trying to count the number of times a certain name occurs within a specified date period. The date range start date is manually entered in F7, and the date range end date is manually entered in F8. I need to be able to choose different reporting periods. The answer to this question goes into F3.
I also want to know how many working days (Column D) it takes per name. A working day is Monday-Friday, less public holidays. In this period there have been public holidays from 24 December until 2 January (inclusive), 20 January, 6 February, 18 April, 21 April, and 25 April. I put these dates manually into the worksheet "Holidays".
For the number of times a certain name occurs I tried the COUNTIFS function but keep getting a "zero" value. I used the NETWORKINGDAYS function for the working days and have incorporated the holiday periods. That seems to work OK and I can live with the negative date values showing here.
The really tricky part for me - can I combine the COUNTIFS (assuming it works) and NETWORKINGDAYS functions into a single function to only count the working days of a specific name. As some names have yet to be completed (i.e. there is no data in Column C) how do I not count those? The answer to this question goes into F4.
There will be about 6 of these spreadsheets, and I intend to link all worksheet data into a "master" spreadsheet which automatically updates whenever it is opened. The separate spreadsheets are stored in a document management system rather than a network drive so I can't state a filepath.
View 7 Replies
View Related
Oct 22, 2008
This is for a VBA TextBox (Not Worksheet). I have two text boxes, both are going to have dates. Textbox1 a user will enter a date; example 10/22/08 or 10-22-08 or 10-22-2008 etc, TextBox2 will get that date and add seven days.
View 3 Replies
View Related
Nov 12, 2009
I have table which looks like this:
Name of School Time1 Time2 LoggedIN
2436 DAVIS JH 11/10/08 8:20 AM 11/10/08 8:30 AM 1 2436 DAVIS JH 11/10/08 8:30 AM 11/10/08 8:40 AM 1 2436 SVM JH 12/11/08 7:00 AM 12/11/08 7:10 AM 1 2436 DAVE JH 12/11/08 7:10 AM 12/11/08 7:20 AM 2 2436 CRAW H 12/11/08 7:20 AM 12/11/08 7:30 AM 2
Total Number of Columns = 4
First Column = School NAme
Second Column = Time 1
Third Column =Time2
Fourth Colum = Logged In
I want a 5th column where i can get the following result:
If time in 3rd column is betweeb 8am and 9 am and time in the 4th column is between 8Am and 9 Amthe thee corresponding row in the 5th coulmn should be 8AM-9AM
If time in 3rd column is betweeb 9am and 10 am and time in the 4th column is between 9AM and 10 Am the thee corresponding row in the 5th coulmn should be 9AM-10AM
Likewise for each hourly time slot of the day
The time columns are in the "DATE" Format!
The Purpose is finally to get the number of students logged in each hour of the day,and finally draw a usage hour graph by school and time !
View 9 Replies
View Related
Mar 3, 2008
I have a spreadsheet with various date fields and next to those time fields. I need to calculate the amount of working hours between the 2 lots of values
for example
Cell A has "22/02/2008"
Cell B has "16:44:00"
Cell J has "25/02/2008"
Cell K has "08:59:00"
The answer i'm looking for is 01:29:00. The working hours are Monday to Friday 07:30 - 16:00. This is what I have so far and it gives me the total hours between the 2 dates but not the working hours. =IF(J10-A10=0,K10-B10,((J10-A10)+(K10-B10))) (Formatted with [h]:mm:ss). I have tried using workingday() but can't get the desired result
View 5 Replies
View Related
Mar 18, 2014
I'm trying to calculate shift working hours without using dates.
The scenario is
Cell A1 = Start Time
Cell A2 = Start Time
Cell A3 = Break Time
Basically I want the output to calculate hours worked between:-
0000 and 0600 as a total in cell A4
0600 and 1800 as a total in cell A5
1800 and 0000 as a total in cell A6
Then if the value of A5 is greater than A3, subtract A3, but if the value of A5 is less than the value of A3, A5 should be zero and the remainder of the value of A3 subtracted from A4 (or A6) depending which has a value.
View 5 Replies
View Related
Oct 10, 2007
I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.
So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.
Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.
What formula should I use or if someone could create an example that would be really usefull :D
View 12 Replies
View Related
Jan 8, 2009
I have the output of my database in an excel file and one of the columns is the date of instalation (of a PC in this case) and I am trying to use the date of instalation to calculate the date of RENEWAL (we have a set life cycle for our machines and so we calculate in months when its due for an upgrade).
I think just a simple formula will work. I have attached an excel file with some example information.
In column B I have the computer type(this will determine how long of a life it has), In column D we have the instalation date which is the starting date (the start of its life cycle). Here are the variables.
HW/PC DESKTOP = 1/7/5
HW/PC DESKTOP CAD SP = 1/7/3
HW/LAPTOP = 1/7/3
HW/LAPTOP CAD SP = 1/7/3
HW/LAPTOP HIGH-END US = 1/7/3
HW/LAPTOP ULTRA-LIGHT FR = 1/7/3
And finally, in column F I would like to display the life cycle it has and then in column G have the exact date of renewal.
View 14 Replies
View Related
Jun 25, 2009
I know I have done this in the past, but now I am having trouble. I have dates in cells that I want to do the following:
First Scenario:
If the date is today, change the color of the text. I have:
Cell Value is equal to =TODAY()
that is working fine
Second Scenario:
If the date is anything within 4 days before today, I want that to change. I have:
Cell Value is Is Less than =Today()<4
that is not working
Third Scenario:
If the date has passed and less than 4 days before todays date, I want something to change. I have:
Cell Value is Less than =TODAY()-4
But that is not working.
View 2 Replies
View Related
Apr 30, 2013
I want a list of working dates for the year in excel. Wanted to have it so that there was some flexibility in the table too, but cannot get it to work 100%.
For some reason in the below example, in December, 26th shows up (despite being in the list of holidays) and the 29th (Sunday) shows up too.
[URL] .....
View 9 Replies
View Related
Jul 25, 2002
How should I calculate working hours between two dates? Say if start at 26 july at 15:00 and finish at 29 july at 10:00, the function should return 4 hours because the working hours are from 8am to 5pm (8 - 17), and there is a weekend between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates. And also, if have to add say 8 hours to a date, how should I calculate the result? Also this function should aware of the working hours and holidays, so it should ignore those times.
View 9 Replies
View Related
Apr 18, 2007
I need to work out the number of working days between 2 dates, where the working week is Monday to Thursday, ignoring all bank holidays etc.
View 2 Replies
View Related
May 5, 2009
I have a job tracker program that daddylonglegs helped me with a few days ago. I thought I would be able figure this out on my own but failed. I've attached the file to help show what I need. I know the final ship date of a project. Sometimes my projects need to go out for teflon coating.
I need Networkdays to give me a TO TEFLON date that is 5 days before the final ship date and factor in weekends and holidays.
View 2 Replies
View Related
Jun 4, 2009
I need a simply excel formula or macro which calculates the numbers of months i need to accrue for certain costs. The data I have includes the start month of the invoice, the end month of the invoice (i.e. showing how long the invoice is relevant for, quite often 1 year), and obviously the current month.
(eg. a 12 month invoice with a start date of Oct 08, end date Sep 09, current May 09 = 8 mths to accrue)
(eg2. a 12 month invoice with a start date of Apr 09, end date of Mar 10, current May 09 = 2 mths to accrue)
(eg3. a 12 month invoice with a start date of Jun 09, end date of May 10, current May 09 = 0 mths to accrue)
View 3 Replies
View Related