I have the output of my database in an excel file and one of the columns is the date of instalation (of a PC in this case) and I am trying to use the date of instalation to calculate the date of RENEWAL (we have a set life cycle for our machines and so we calculate in months when its due for an upgrade).
I think just a simple formula will work. I have attached an excel file with some example information.
In column B I have the computer type(this will determine how long of a life it has), In column D we have the instalation date which is the starting date (the start of its life cycle). Here are the variables.
i have a due date column and an adjusted due date column. a proof is allowed to be held 3 days, if it is held longer, the due date is adjusted. for every day over the allowed days that a proof is held, we are allowed 2 more days of production. i want to create a formula that will calculate how many EXTRA days the proof was held, multiply that by 2 and then add that many days to give us the adjusted due date. is there a way to do that?
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
This is for a VBA TextBox (Not Worksheet). I have two text boxes, both are going to have dates. Textbox1 a user will enter a date; example 10/22/08 or 10-22-08 or 10-22-2008 etc, TextBox2 will get that date and add seven days.
2436 DAVIS JH 11/10/08 8:20 AM 11/10/08 8:30 AM 1 2436 DAVIS JH 11/10/08 8:30 AM 11/10/08 8:40 AM 1 2436 SVM JH 12/11/08 7:00 AM 12/11/08 7:10 AM 1 2436 DAVE JH 12/11/08 7:10 AM 12/11/08 7:20 AM 2 2436 CRAW H 12/11/08 7:20 AM 12/11/08 7:30 AM 2
Total Number of Columns = 4 First Column = School NAme Second Column = Time 1 Third Column =Time2 Fourth Colum = Logged In
I want a 5th column where i can get the following result:
If time in 3rd column is betweeb 8am and 9 am and time in the 4th column is between 8Am and 9 Amthe thee corresponding row in the 5th coulmn should be 8AM-9AM If time in 3rd column is betweeb 9am and 10 am and time in the 4th column is between 9AM and 10 Am the thee corresponding row in the 5th coulmn should be 9AM-10AM
Likewise for each hourly time slot of the day
The time columns are in the "DATE" Format!
The Purpose is finally to get the number of students logged in each hour of the day,and finally draw a usage hour graph by school and time !
I have a spreadsheet with various date fields and next to those time fields. I need to calculate the amount of working hours between the 2 lots of values
for example
Cell A has "22/02/2008" Cell B has "16:44:00" Cell J has "25/02/2008" Cell K has "08:59:00"
The answer i'm looking for is 01:29:00. The working hours are Monday to Friday 07:30 - 16:00. This is what I have so far and it gives me the total hours between the 2 dates but not the working hours. =IF(J10-A10=0,K10-B10,((J10-A10)+(K10-B10))) (Formatted with [h]:mm:ss). I have tried using workingday() but can't get the desired result
I'm trying to calculate shift working hours without using dates.
The scenario is
Cell A1 = Start Time Cell A2 = Start Time Cell A3 = Break Time
Basically I want the output to calculate hours worked between:-
0000 and 0600 as a total in cell A4 0600 and 1800 as a total in cell A5 1800 and 0000 as a total in cell A6
Then if the value of A5 is greater than A3, subtract A3, but if the value of A5 is less than the value of A3, A5 should be zero and the remainder of the value of A3 subtracted from A4 (or A6) depending which has a value.
I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.
So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.
Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.
What formula should I use or if someone could create an example that would be really usefull :D
I want a list of working dates for the year in excel. Wanted to have it so that there was some flexibility in the table too, but cannot get it to work 100%.
For some reason in the below example, in December, 26th shows up (despite being in the list of holidays) and the 29th (Sunday) shows up too.
How should I calculate working hours between two dates? Say if start at 26 july at 15:00 and finish at 29 july at 10:00, the function should return 4 hours because the working hours are from 8am to 5pm (8 - 17), and there is a weekend between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates. And also, if have to add say 8 hours to a date, how should I calculate the result? Also this function should aware of the working hours and holidays, so it should ignore those times.
I have a job tracker program that daddylonglegs helped me with a few days ago. I thought I would be able figure this out on my own but failed. I've attached the file to help show what I need. I know the final ship date of a project. Sometimes my projects need to go out for teflon coating.
I need Networkdays to give me a TO TEFLON date that is 5 days before the final ship date and factor in weekends and holidays.
I need a simply excel formula or macro which calculates the numbers of months i need to accrue for certain costs. The data I have includes the start month of the invoice, the end month of the invoice (i.e. showing how long the invoice is relevant for, quite often 1 year), and obviously the current month.
(eg. a 12 month invoice with a start date of Oct 08, end date Sep 09, current May 09 = 8 mths to accrue) (eg2. a 12 month invoice with a start date of Apr 09, end date of Mar 10, current May 09 = 2 mths to accrue) (eg3. a 12 month invoice with a start date of Jun 09, end date of May 10, current May 09 = 0 mths to accrue)
I have a spreadsheet stating a date that my company will deliver a product by but due to a set of certain circumstances we need to pull forward the dates by 3 or 5 working days. Basically it needs to show the dates below but minus 3 days unless this includes non-working days (i.e. weekends)
Unfortunately I receive an error saying it can't group the selection.
I have done "text to columns" and made the cells - (date values) and I have had no luck.
As I am at work I can't use the HTML genie because it won't install but I have uploaded a dummy file to my dropbox which available from here [URL] .......
I pull this data from an Oracle POWER PIVOT and always have trouble grouping the dates when they come from Power Pivot. Currently working as analyst so figuring this out would make life so much easier as I could group by months etc.
How should I calculate working hours between two dates? Say if start at 9/25/2009 7:26:13 PM and finish at 10/20/2009 9:46:13 AM, the function should return 245:20:00 because the working hours are from 8am to 11 PM (8 - 23), and there are weekends between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates.
Can I calculate the number of working hours between these two using a formula? So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?
The below formulae allows me to see the difference between two dates and only returns the difference in working hours ie : Difference between 02/02/2010 08:00 & 03/02/2010 08:00 is 16 Hours 0 Minutes
=(INT(A3)-INT(C6))+MAX(MOD(A3,1)-MAX(MOD(C6,1)))
The following displays it in the Hrs and Mins format
I have a workbook in excel 2003 which I had been running the following macros (listed below). We recently upgraded to Excel 07, and neither are working. When I try to run them, the "debug" option highlights the following line in the sort macro "Range("A2:z" & lastcell).Sort key1:=.Columns(1)". This is driving me crazy, as the macros worked perfectly under the older version of Microsoft. Is there an issue with crossfunctionality between '03 and '07'.
Private Sub Worksheet_change(ByVal target As Excel.Range) If target.Column = 1 Then ThisRow = target.Row startRow = 1 i = 1 Set ws = ActiveSheet maxRow = Cells.SpecialCells(xlLastCell).Row maxCol = Cells.SpecialCells(xlLastCell).Column ActiveSheet.UsedRange.Interior.ColorIndex = xlNone Do While i
if you look at attachment, in Cell J2, if cell I2 is greater than 2 minutes but less than two minutes, the I need the value of I2 in Cell J2 otherwise 0:00:00 then K2 between 3 & 4 Mins and so on.
I have attached a sample file. All the data is inserted into this file via a text file, except one column "G". Someone in this forum was kind enough to help me in being able to include the city name 'G' to a parcel number 'A'. However, the page is constantly trying to complete 'Calculations' and won't let me do anything without first hitting 'Control Break'.
This is fine except that when I try to save the file into .txt, I don't have the option of 'Control Break' and I have to end up closing the file. As the 'real' file has over 100,000 rows, nothing happens very fast. I have tied changing the 'Calculation Options' but that doesn't seem to change anything.