Working With Dates And Making Calculations

Jan 8, 2009

I have the output of my database in an excel file and one of the columns is the date of instalation (of a PC in this case) and I am trying to use the date of instalation to calculate the date of RENEWAL (we have a set life cycle for our machines and so we calculate in months when its due for an upgrade).

I think just a simple formula will work. I have attached an excel file with some example information.

In column B I have the computer type(this will determine how long of a life it has), In column D we have the instalation date which is the starting date (the start of its life cycle). Here are the variables.

HW/PC DESKTOP = 1/7/5
HW/PC DESKTOP CAD SP = 1/7/3
HW/LAPTOP = 1/7/3
HW/LAPTOP CAD SP = 1/7/3
HW/LAPTOP HIGH-END US = 1/7/3
HW/LAPTOP ULTRA-LIGHT FR = 1/7/3

And finally, in column F I would like to display the life cycle it has and then in column G have the exact date of renewal.

View 14 Replies


ADVERTISEMENT

Get The Milliseconds To Another Cell For Making Some Calculations

Oct 22, 2008

I set the time format to hh:mm:ss.000 to show also the milliseconds.
How can I get the milliseconds to another cell for making some calculations?

View 8 Replies View Related

Date Calculations :: Due And Adjusted Dates

Jan 17, 2008

i have a due date column and an adjusted due date column. a proof is allowed to be held 3 days, if it is held longer, the due date is adjusted. for every day over the allowed days that a proof is held, we are allowed 2 more days of production. i want to create a formula that will calculate how many EXTRA days the proof was held, multiply that by 2 and then add that many days to give us the adjusted due date. is there a way to do that?

View 10 Replies View Related

Count Working Days Between 2 Dates, But Return A Zero If The 2 Dates Are The Same Day

Jan 15, 2009

Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date

But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero

Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!

View 7 Replies View Related

Making Single Graph With Two Datasets That Have Individual Dates

Apr 3, 2014

I want to make a single graph from two data sets that have individual dates.

help!.xlsx

E.g.
Data set 1
1. January 2010 2. january 2010 ... 10. december 2010 etc
10 15 ... 10 etc

Data set 2
1. January 2010 ... 1. January 2015 etc
200 ... 200 etc

View 8 Replies View Related

Textbox (Working With Dates)

Oct 22, 2008

This is for a VBA TextBox (Not Worksheet). I have two text boxes, both are going to have dates. Textbox1 a user will enter a date; example 10/22/08 or 10-22-08 or 10-22-2008 etc, TextBox2 will get that date and add seven days.

View 3 Replies View Related

Working With Dates/Time

Nov 12, 2009

I have table which looks like this:

Name of School Time1 Time2 LoggedIN

2436 DAVIS JH 11/10/08 8:20 AM 11/10/08 8:30 AM 1 2436 DAVIS JH 11/10/08 8:30 AM 11/10/08 8:40 AM 1 2436 SVM JH 12/11/08 7:00 AM 12/11/08 7:10 AM 1 2436 DAVE JH 12/11/08 7:10 AM 12/11/08 7:20 AM 2 2436 CRAW H 12/11/08 7:20 AM 12/11/08 7:30 AM 2

Total Number of Columns = 4
First Column = School NAme
Second Column = Time 1
Third Column =Time2
Fourth Colum = Logged In

I want a 5th column where i can get the following result:

If time in 3rd column is betweeb 8am and 9 am and time in the 4th column is between 8Am and 9 Amthe thee corresponding row in the 5th coulmn should be 8AM-9AM
If time in 3rd column is betweeb 9am and 10 am and time in the 4th column is between 9AM and 10 Am the thee corresponding row in the 5th coulmn should be 9AM-10AM

Likewise for each hourly time slot of the day

The time columns are in the "DATE" Format!

The Purpose is finally to get the number of students logged in each hour of the day,and finally draw a usage hour graph by school and time !

View 9 Replies View Related

Working Hours Between 2 Dates

Mar 3, 2008

I have a spreadsheet with various date fields and next to those time fields. I need to calculate the amount of working hours between the 2 lots of values

for example

Cell A has "22/02/2008"
Cell B has "16:44:00"
Cell J has "25/02/2008"
Cell K has "08:59:00"

The answer i'm looking for is 01:29:00. The working hours are Monday to Friday 07:30 - 16:00. This is what I have so far and it gives me the total hours between the 2 dates but not the working hours. =IF(J10-A10=0,K10-B10,((J10-A10)+(K10-B10))) (Formatted with [h]:mm:ss). I have tried using workingday() but can't get the desired result

View 5 Replies View Related

Calculating Working Hours Without Using Dates

Mar 18, 2014

I'm trying to calculate shift working hours without using dates.

The scenario is

Cell A1 = Start Time
Cell A2 = Start Time
Cell A3 = Break Time

Basically I want the output to calculate hours worked between:-

0000 and 0600 as a total in cell A4
0600 and 1800 as a total in cell A5
1800 and 0000 as a total in cell A6

Then if the value of A5 is greater than A3, subtract A3, but if the value of A5 is less than the value of A3, A5 should be zero and the remainder of the value of A3 subtracted from A4 (or A6) depending which has a value.

View 5 Replies View Related

Number Of Working Days Between 2 Dates

Oct 10, 2007

I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.

So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.

Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.

What formula should I use or if someone could create an example that would be really usefull :D

View 12 Replies View Related

Working With Condtitional Formats And Dates

Jun 25, 2009

I know I have done this in the past, but now I am having trouble. I have dates in cells that I want to do the following:

First Scenario:
If the date is today, change the color of the text. I have:

Cell Value is equal to =TODAY()
that is working fine

Second Scenario:
If the date is anything within 4 days before today, I want that to change. I have:

Cell Value is Is Less than =Today()<4
that is not working

Third Scenario:
If the date has passed and less than 4 days before todays date, I want something to change. I have:

Cell Value is Less than =TODAY()-4
But that is not working.

View 2 Replies View Related

Filtering By Dates Not Working Correctly?

Jun 26, 2014

[Code] ....

In column F I have a list of dates (dd/mm/yyyy).

I can manually filter dates ok, but want to set it to part of code to use automation for a report.

The code when run, finds nothing, where it should. I tried using [CDate] also but also same result.

View 3 Replies View Related

List Of Working Dates For Year

Apr 30, 2013

I want a list of working dates for the year in excel. Wanted to have it so that there was some flexibility in the table too, but cannot get it to work 100%.

For some reason in the below example, in December, 26th shows up (despite being in the list of holidays) and the 29th (Sunday) shows up too.

[URL] .....

View 9 Replies View Related

Calculating Working Hours Between Two Dates

Jul 25, 2002

How should I calculate working hours between two dates? Say if start at 26 july at 15:00 and finish at 29 july at 10:00, the function should return 4 hours because the working hours are from 8am to 5pm (8 - 17), and there is a weekend between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates. And also, if have to add say 8 hours to a date, how should I calculate the result? Also this function should aware of the working hours and holidays, so it should ignore those times.

View 9 Replies View Related

Number Of Working Days Between Dates

Apr 18, 2007

I need to work out the number of working days between 2 dates, where the working week is Monday to Thursday, ignoring all bank holidays etc.

View 2 Replies View Related

Working Ship Dates Backwards With Networkdays

May 5, 2009

I have a job tracker program that daddylonglegs helped me with a few days ago. I thought I would be able figure this out on my own but failed. I've attached the file to help show what I need. I know the final ship date of a project. Sometimes my projects need to go out for teflon coating.

I need Networkdays to give me a TO TEFLON date that is 5 days before the final ship date and factor in weekends and holidays.

View 2 Replies View Related

Working Out Number Of Accrual Months Between Dates

Jun 4, 2009

I need a simply excel formula or macro which calculates the numbers of months i need to accrue for certain costs. The data I have includes the start month of the invoice, the end month of the invoice (i.e. showing how long the invoice is relevant for, quite often 1 year), and obviously the current month.

(eg. a 12 month invoice with a start date of Oct 08, end date Sep 09, current May 09 = 8 mths to accrue)
(eg2. a 12 month invoice with a start date of Apr 09, end date of Mar 10, current May 09 = 2 mths to accrue)
(eg3. a 12 month invoice with a start date of Jun 09, end date of May 10, current May 09 = 0 mths to accrue)

View 3 Replies View Related

Pull Forward The Dates By 3 Or 5 Working Days

Apr 15, 2009

I have a spreadsheet stating a date that my company will deliver a product by but due to a set of certain circumstances we need to pull forward the dates by 3 or 5 working days. Basically it needs to show the dates below but minus 3 days unless this includes non-working days (i.e. weekends)

01/01/10
02/01/10
03/01/10
04/01/10
05/01/10
06/01/10
07/01/10
08/01/10
09/01/10
10/01/10

View 3 Replies View Related

Calculate Working Hours Between 2 Dates Including Saturday?

Jun 17, 2008

I need to calculate the total WORK-hours (09:00-17:30) between two date/time-stamps;

Including Saturdays but excluding Sundays & Holidays.

I can get this working excluding Saturdays (formula below) using NETWORKDAYS however the call centre work six days a week Mon-Sat.

A1=dd/mm/yyyy/hh:mm
A2=dd/mm/yyyy/hh:mm [code]....

View 9 Replies View Related

Grouping Dates Not Working On Pivot Table - ERROR

May 28, 2014

I am trying to group some dates in a pivot table.

Unfortunately I receive an error saying it can't group the selection.

I have done "text to columns" and made the cells - (date values) and I have had no luck.

As I am at work I can't use the HTML genie because it won't install but I have uploaded a dummy file to my dropbox which available from here [URL] .......

I pull this data from an Oracle POWER PIVOT and always have trouble grouping the dates when they come from Power Pivot. Currently working as analyst so figuring this out would make life so much easier as I could group by months etc.

View 3 Replies View Related

Calculate Only Working Hours Between Two Dates Excluding Weekends

Oct 30, 2009

How should I calculate working hours between two dates? Say if start at 9/25/2009 7:26:13 PM and finish at 10/20/2009 9:46:13 AM, the function should return 245:20:00 because the working hours are from 8am to 11 PM (8 - 23), and there are weekends between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates.

View 9 Replies View Related

Calculate Working Hours Between 2 Dates Including Saturday

Jun 17, 2008

I need to calculate the total WORK-hours (09:00-17:30) between two
date/time-stamps;
Including Saturdays but excluding Sundays & Holidays.

I can get this working excluding Saturdays (formula below) using NETWORKDAYS however
the call centre work six days a week Mon-Sat.

A1=dd/mm/yyyy/hh:mm
A2=dd/mm/yyyy/hh:mm

DayEnd= 17:30:00
DayStart= 09:00:00
HolidayList= "Currently Blank"

=(NETWORKDAYS(A1,A2,HolidayList)-1)*(DayEnd-DayStart)+MOD(A2,1)-
MOD(A1,1)

View 6 Replies View Related

Formula For Working Out Number Of Days Between Dates Excluding Weekends?

Aug 6, 2012

I want to create a formula that works out the number of days between two dates but excludes weekends?

View 3 Replies View Related

Number Of Working Hours Between 2 Dates Including Start And Finish Times

Mar 22, 2007

I have 2 dates+ times.

1 the contract start date and time.

2 the contract end date and time.

Can I calculate the number of working hours between these two using a formula?
So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?

Example
Start 06-Mar-07 10:00
End 14-Mar-07 14:00

This is 2 part days and over a weekend.

View 9 Replies View Related

Difference Between Dates And Times In Days , Hours Mins ( Working Hours )

Mar 2, 2010

The below formulae allows me to see the difference between two dates and only returns the difference in working hours ie :
Difference between
02/02/2010 08:00 & 03/02/2010 08:00 is 16 Hours 0 Minutes

=(INT(A3)-INT(C6))+MAX(MOD(A3,1)-MAX(MOD(C6,1)))

The following displays it in the Hrs and Mins format

=TEXT(B15,"[h]")&" Hour"&IF(OR(TEXT(B15,"[h]")+0=0,TEXT(B15,"[h]")+0>1),"s "," ")&MINUTE(B15)&" Minute"&IF(MINUTE(B15)1,"s ",""))

View 9 Replies View Related

Macros That Were Working In Excel 2003 Are Not Working In 2007

Jan 25, 2010

I have a workbook in excel 2003 which I had been running the following macros (listed below). We recently upgraded to Excel 07, and neither are working. When I try to run them, the "debug" option highlights the following line in the sort macro "Range("A2:z" & lastcell).Sort key1:=.Columns(1)". This is driving me crazy, as the macros worked perfectly under the older version of Microsoft. Is there an issue with crossfunctionality between '03 and '07'.

Private Sub Worksheet_change(ByVal target As Excel.Range)
If target.Column = 1 Then
ThisRow = target.Row
startRow = 1
i = 1
Set ws = ActiveSheet
maxRow = Cells.SpecialCells(xlLastCell).Row
maxCol = Cells.SpecialCells(xlLastCell).Column
ActiveSheet.UsedRange.Interior.ColorIndex = xlNone
Do While i

View 9 Replies View Related

Time Calculations.?

Feb 9, 2010

if you look at attachment, in Cell J2, if cell I2 is greater than 2 minutes but less than two minutes, the I need the value of I2 in Cell J2 otherwise 0:00:00 then K2 between 3 & 4 Mins and so on.

View 5 Replies View Related

Certain Line Only Calculations

Jan 27, 2010

I am making a spreadsheet that tells us the following information about prints that we do:

View 6 Replies View Related

Turn Off Calculations

Feb 2, 2010

I have attached a sample file. All the data is inserted into this file via a text file, except one column "G". Someone in this forum was kind enough to help me in being able to include the city name 'G' to a parcel number 'A'. However, the page is constantly trying to complete 'Calculations' and won't let me do anything without first hitting 'Control Break'.

This is fine except that when I try to save the file into .txt, I don't have the option of 'Control Break' and I have to end up closing the file. As the 'real' file has over 100,000 rows, nothing happens very fast. I have tied changing the 'Calculation Options' but that doesn't seem to change anything.

View 7 Replies View Related

Set Range For Calculations Without VBA?

Jul 11, 2012

Is it possible to have an input box for a range of calculations and then in my formulas set the range to anchor + variable ?

Something roughly like:

Range = 20

Product( F13:F & Range_Variable_Cell_Value)

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved