Find Next Working Day For Part Time Employees - Exclude Holidays / Weekends
May 16, 2014
My aim is to find the end working date for each task, as well as the next working date for the next task. The working days for this employee are only Monday (6hours), Wednesday (6 hours) and Friday (8hours).
D
E
F
G
H
Start Date
Duration
Completed Days
Remaining Days
End Date
4
5/05/14
3
=IF(TODAY()>=H4, E4,IF(TODAY()
View 3 Replies
ADVERTISEMENT
Apr 9, 2014
I'm using excel 2010 on a pc. I need to create a calender. So far I have been using the tutorial for the pop up calender. The result I'm looking for is to set up a specific time frame and have the calender provide the "due" date. I would like the due date to exclude weekends and holidays. Would I be able to do this with the pop up calender?
View 3 Replies
View Related
Aug 27, 2009
I have been asked to create a worksheet to calculate the percentage of the utilisation of a number of loan cars per month. Each of the cars may be used on each and every day of the week but the percentage utilisation is to be calculated on working days only. However it is essential to record the name of the driver of the car at weekends and holidays. Column A is populated with the dates of the month. Colum B is populated with the relative days of the week. In column C and subsequent columns I record the name of the driver of a particular car registration. Is there any way that I can count the number of drivers of each car on working days only and not weekends or bank holidays?
View 5 Replies
View Related
Mar 27, 2014
I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.
View 2 Replies
View Related
Feb 12, 2010
I've been reading up on Excel's date and time functions and can't really figure out the best way of doing this.
I have a total amount of time that a machine should take to finish a task. I'd like to enter a date and time into a cell (Start Date) and have another cell return the date and time that the machine should be done with the task excluding weekends, and holidays (End Date). This would be based on a certain number of "working hours" (hours in the workday minus break periods) that would be calculated in another cell.
View 9 Replies
View Related
Mar 16, 2009
I would like to find out if a job took more than 24 hour cycle time (eg. 6:00 am to 5:59:59 AM next day). data:
A1 = received date & time (format "m/d/yyyy h:mm")
B1 = completed date & time (format "m/d/yyyy h:mm")
my formula is '=if(B1-A1>"24:00"+0,"Yes","No"). The problem with the formula is that it doesnt exclude weekends nor public holidays. I couldnt formulate a solution using networkdays function......
View 3 Replies
View Related
Sep 21, 2009
I am trying to figure out how to take holidays and weekends out of my data.
View 9 Replies
View Related
Oct 6, 2007
I have a calender with days in the columns and months in the rows. However I have 3 rows for each month. I'm using text and values combinations in the cells to record data
Example First Sheet
Feb Rows, 11,12&13
Columns C,G Dates 1st to 5th
Therefore 1st of Feb has 3 cells to enter data, ie Basic Hours, Sickness, Holiday
Currently I'm defining a name range for each month, ie DFeb. Currently I'm recording each of the rows into columns in another sheet and the date in the row, by using a Hlookup on the date and a vlookup on the month
ie Second Sheet...............
View 5 Replies
View Related
Mar 21, 2013
I am generating a spreadsheet that focuses on a target opening date. There is about 12 other headings along the top all stating the different phases of construction, permitting, etc. I need to exclude weekends and holidays from most of these columns, and only exclude holidays from about 2 of the columns. I think I am to use the formula for NETWORKDAYS, but not sure how or where to incorporate it.
View 9 Replies
View Related
May 3, 2013
In a sheet, like the example, I have monthly shift schedules for employees. What I want is to count the total shifts for Saturday and Sunday, separately Night (N) and Morning (M)/Afternoon (A) shifts, as in columns with red.
ABCDEMNOPQRAGAHAIAJ1JUNE 20132DATE1234121314151617....
HOW MANY "N" HOW MANY "M" AND "A"3SATSUNMONTUEWEDTHUFRISATSUNMON....
AT SAT-SUNAT SAT-SUN4Employee1NNNNNMM--A205Employee2MMMM-NNNNN246
Employee3AAAAM--MMM067Employee4--MM-AANNM408............................................9EXAMPLE
View 6 Replies
View Related
Jun 25, 2008
Please see attached spreadsheet on what I am trying to achieve.
In the data tab I have my base data, which is dates across the top and names down the side. I have information in the middle such as 'H8' which means that the person was on holiday for 8 hours on that particular day, and 'S8' which means they were sick for 8 hours on that day.
I want a macro that will rearrange the information in the table and put it into the report format which is in the report sheet.
If you see the spreadsheet you will probably get a better idea of what I am trying to achieve.
View 5 Replies
View Related
Dec 14, 2005
I have a schedule of holiday dates through year 2010 off to the side in cells N8-S18 that a workable formula could refer to.
........C...................D..................... ......E.........
1......1............10/25/2005...........10/26/2005
2......2............10/27/2005...........10/29/2005
3......0............10/29/2005...........10/29/2005
4......3............10/29/2005...........11/01/2005
Column C is the duration of the project in days. Column D is the project start date. Column E is the project end date.
As example, in D4 I'm using the formula =IF(C3=0,E3+0,E3+1). I need to include something to make it ignore weekends & holidays.
I don't have much experience in multiple conditions - I tried some things & made a decent mess of it.
View 9 Replies
View Related
Apr 22, 2007
i have a cell with a date in it and cell with number of days in it
problem is i cant count weekends or holidays in the addistion
example b1 has 4/20/07 in it and c1 has 2 in it
i want to add c2 to b1 and compare to cell which could have a date in it or if not compare it to todays date
problem is i cant count weekends or holidays in the addition
so i would want to compare todays date to 4/24/07
if todays date is greater then the 2 cells added change color of cell
View 9 Replies
View Related
Oct 10, 2008
I have a report that starts with a desired date and generates dates backwards on when certain releases should come out. I would like the code to see the date, move it back a week, check to make sure it's not a weekend or holiday, then post it in the cell below. If it does happen to land on a weekend, it should then be the Friday before the weekend. If it is a holiday, it should be the date before the holiday, as long as it is not a Sunday (or another holiday).
Attached is the workbook that I'm using. I'm starting with the desired date 'B7' and using the Holidays in a seperate worksheet. I know that in the current example, nothing will land on the weekend, unless the holiday pushes it back to one.
View 4 Replies
View Related
Jun 21, 2006
I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.
View 2 Replies
View Related
Feb 26, 2014
Is there a way to autofill dates in excel to exclude weekends and bank holidays?
View 6 Replies
View Related
Dec 5, 2013
I am trying to run a macro to put in the Month, Day, Year on each tab but I want it to exclude holidays and weekends. I am not a techie or anything but I would like to know how to do this. I have tried various vb codes but they don't exclude the weekends/holidays.
View 3 Replies
View Related
Jan 17, 2010
I am trying to compare values from this week to last week with the exception that will overlook holidays. ie, from Monday to last Monday. But I am running into an issue if there is a holiday in the week as my formulas are looking for the value 5 days prior to the current day.
View 5 Replies
View Related
Apr 7, 2014
I am trying to create a schedule that includes weekdays only. Is there a formula or set-up step to do that?
Currently I have 3 columns:
Start date Action date Finish date
The Action date column has the formula: that cell (say C4) minus number of days that action requires (say 10), but when 10 days fall on a weekend, I need to change to the next work day instead.
View 14 Replies
View Related
Aug 12, 2013
I have a worksheet of each month, column for each day. If today is Monday, we want to enter data for the previous business day. In this case, it will be Friday. I would like to have Friday's date (entire column if possible) to be highlighted in white bold font with maroon fill-in. So, whoever needs to enter Friday's data would know right away when he/she opens up document which column to work on. It works Monday - Thursday but not for Friday.
8/1/20138/2/20138/5/2013
ThursdayFridayMonday
Total English-Speaking Staff646464
Vacation Scheduled (hours)45.5080.0056.00
Vacation Unscheduled (hours)24.500.000.00
Sick Leave Scheduled (hours)37.5035.0025.00
Sick Leave Unscheduled (hours)73.0069.2533.75
Training Scheduled (hours)45.000.000.00
Training Unscheduled (hours)0.000.000.00
Meeting Scheduled (hours)0.000.000.00
Meeting Unscheduled (hours)0.000.000.00
Other Scheduled (hours)45.0044.0044.00
Other Unscheduled (hours)0.000.000.00
Total Leave Hours English270.50228.25158.75
Staff Leave Equivalent33.8128.5319.84
Total English-Speaking Staff Available30.1935.4744.16
View 6 Replies
View Related
Dec 9, 2009
I have been trying to count dates in my spreadsheet. The dates are supposed to go back in time (what they do). But I want them to jump over the weekends' dates instead of landing on them.
What I have is Start Date, Req'd Qty, Days it takes to make, Date it is required to start production (which I have a problem with).
A
1 26-Nov [Thursday]
2 1500
3 5
4 'Problem' I used for this cell that formula: =if(A2>0,A1-A3,"") , as I don't want it to show anything if there is no requirements.
It comes back with 21-Nov which is Saturday when I want it to come back with 19-Nov (Thursday) as we only have 5 working days in a week.
View 4 Replies
View Related
Jul 25, 2014
find the difference between 2 dates in excel "date 1 - date 2"..... but I'm not quite sure as to how one would do it while excluding holidays!
View 8 Replies
View Related
Aug 4, 2014
I have below formula which gives me the due status.
[Code] ......
How can I modify the code so it excludes Saturday and Sunday.
View 7 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Oct 1, 2009
I'm using Excel to schedule employees shifts at my restaurant. Column A is their name, Column B is their start time, Column C is their end time. I'd like to be able to count the number of employees working during any given hour of the day to assure I've got enough staffing each hour. I'm thinking it will require a COUNTIF function but I can't figure out how to make it work. I've attached a sample sheet.
View 4 Replies
View Related
Jan 30, 2013
Need VBA macro to read and sum data from multiple worksheets
The “summary” worksheet contains list of all employees. I need to update the total number of hours for each employee by scanning all worksheets in the workbook as follows:
Once I click on a "update" button, I need to scan all worksheets (I have one worksheet for each week) which contains the total number of hours for employees by week. I need to calculate and add the total number of working hours for each employee then move to the next worksheet and so on ..
Once all worksheets are all scanned, the final total of working hours get posted in front of the employee name in the assigned field.. I need to do this for all employees. I also need a macro to create a new worksheet.. I attached an example with little description inside .. Labor Detail Job to Date-2.xlsx
View 5 Replies
View Related
Oct 28, 2009
From another thread I got this formula placed on B5:
=NETWORKDAYS(EOMONTH(B4,-1)+1,EOMONTH(B4,0),Holidays)
his generates the number of working days for that month (regardless of the date on B4) that exclude Holidays listed under the range "Holidays".
I also got this code (Credits to XXXX)
View 4 Replies
View Related
Oct 30, 2009
How should I calculate working hours between two dates? Say if start at 9/25/2009 7:26:13 PM and finish at 10/20/2009 9:46:13 AM, the function should return 245:20:00 because the working hours are from 8am to 11 PM (8 - 23), and there are weekends between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates.
View 9 Replies
View Related
Sep 7, 2007
I need a formula to add just the time to ' date and time', ignoring weekends.
eg:
Fri 24-Aug-07 10:52 is the date and time
28:48:00 is the time
If I add the time to 'date and time', result is coming as Sat 25-Aug-07 15:40
But it should come as Mon 27-Aug-07 15:40 (hence ignoring weekend)
View 9 Replies
View Related
Aug 6, 2012
I want to create a formula that works out the number of days between two dates but excludes weekends?
View 3 Replies
View Related