Calculate Only Working Hours Between Two Dates Excluding Weekends
Oct 30, 2009
How should I calculate working hours between two dates? Say if start at 9/25/2009 7:26:13 PM and finish at 10/20/2009 9:46:13 AM, the function should return 245:20:00 because the working hours are from 8am to 11 PM (8 - 23), and there are weekends between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates.
View 9 Replies
ADVERTISEMENT
Jun 2, 2014
I have a worksheet where I capture the date and time of each new entry in column A.
In the next column, it's counting up the number of hours since that entry was made. However, it's including Saturdays and Sundays in this count and I was wondering if there's a formula to calculate the number of hours excluding Saturdays and Sundays? I know that network days would count the number of working days from one date to the next, but really need hours. Is this possible?
View 3 Replies
View Related
Aug 6, 2012
I want to create a formula that works out the number of days between two dates but excludes weekends?
View 3 Replies
View Related
Apr 29, 2006
I am looking for formula to calculate the dates between two days (excluding the weekends)
I am working in Saudi Arabia and the weekend days over here are thursday and Friday.
View 9 Replies
View Related
Jun 8, 2008
I wanted to calculate the difference between dates, excluding the weekends. After much thought i used =NETWORKDAYS(A1,B1)+IF(NETWORKDAYS(A1,A1)+ NETWORKDAYS(B1,B1)=2,-SIGN(NETWORKDAYS(A1,B1)),0) that seemed to be working fine. However, I had a problem today with this formula when my start day was saturday (24/05/08) and the last day was monday (26/05/08). What i want is that when i take the difference between these two days, i should get zero as answer as we are not including the weekends in calculation so the start date should ideally be the first weekday which is Monday. However, the formula is giving me 1 as an answer.
This formula works fine if i select 27/05/08 as last date in which case i get 2 as an answer which is right. In gist, what i am looking for is a formula which will give me the difference between two dates and exclude the weekends from the calculation. The last date can't be a weekend, but the start date can. Hence, whenever the start date is a weekend, the formula should take monday as a start day.
View 9 Replies
View Related
Jun 17, 2008
I need to calculate the total WORK-hours (09:00-17:30) between two date/time-stamps;
Including Saturdays but excluding Sundays & Holidays.
I can get this working excluding Saturdays (formula below) using NETWORKDAYS however the call centre work six days a week Mon-Sat.
A1=dd/mm/yyyy/hh:mm
A2=dd/mm/yyyy/hh:mm [code]....
View 9 Replies
View Related
Jun 17, 2008
I need to calculate the total WORK-hours (09:00-17:30) between two
date/time-stamps;
Including Saturdays but excluding Sundays & Holidays.
I can get this working excluding Saturdays (formula below) using NETWORKDAYS however
the call centre work six days a week Mon-Sat.
A1=dd/mm/yyyy/hh:mm
A2=dd/mm/yyyy/hh:mm
DayEnd= 17:30:00
DayStart= 09:00:00
HolidayList= "Currently Blank"
=(NETWORKDAYS(A1,A2,HolidayList)-1)*(DayEnd-DayStart)+MOD(A2,1)-
MOD(A1,1)
View 6 Replies
View Related
May 22, 2008
how to find the number of days between 2 Dates excluding weekends and holidays using vba. I m using excel 2003. All I know is to figure out todays date using the keyword 'Date'.
Also, this is my second post and I have tried to comply with the rules regarding the title, but if it is still inappropriate and does not meet 'stating the problem' criteria,
View 3 Replies
View Related
Aug 25, 2007
I am using the same structure to update another column, under the same sub:
If Target.Column = 5 Then '
Select Case Range("d69").Value
Case "CB1W"
ActiveCell.Value = DateAdd("ww", 1, Now())
Case "CB2W"
ActiveCell.Value = DateAdd("ww", 2, Now())
Case "CB3W"
ActiveCell.Value = DateAdd("d", 21, Now())
Case "CB4W"
ActiveCell.Value = DateAdd("d", 28, Now())
Case "CB5W"
ActiveCell.Value = DateAdd("d", 35, Now())
Case "NI"
ActiveCell.Value = ""
Case Else
ActiveCell.Value = ""
End Select
I would like to apply the code to the whole column but if I change Select Case Range("d69").Value to Select Case Range("d2:1000").Value I get a Type Mismatch Error (13) - (on Case "CB1W" ) - column d cells are data validation drop down boxes that get their value form a named ranged :Lead_Status. The column is also formatted as Text. (I applied the code to d69 because I have data already in the other cells which I don't want altered till I have the code working)
I would also greatly appreciate your advice on how to incorporate the WEEKDAY function to exclude weekends for the DateAdd function.
View 9 Replies
View Related
Feb 15, 2008
I am trying to calculate downtime for a Service Level Agreement.
The data that I have is the start date/time and the resolved date/time for an incident.
The data are in the format - 1/1/2008 03:32 AM. The incidents may occur at any time but downtime is calculated only business hours and excludes weekends. I may be required to exclude holidays but that is not a hard requirement right now. What I must be able to specify are the working hours.
As example(s)
- if an incident is generated on 1/2/2008 4:00 PM and resolved at 1/3/2008 11:00 AM then the downtime is 4 hours.
- if an incident is generated on 1/12/2008 4:00 PM (which is a Sat) and resolved at 1/14/2008 11:00 AM (which is Monday) then the downtime is 3 hours.
The above assumes working hours are 8:00 AM through 5:00 PM.
I have tried using the NETWORKDAYS and WORKDAY functions with little success.
View 9 Replies
View Related
Feb 26, 2014
Is there a way to autofill dates in excel to exclude weekends and bank holidays?
View 6 Replies
View Related
Dec 5, 2013
I am trying to run a macro to put in the Month, Day, Year on each tab but I want it to exclude holidays and weekends. I am not a techie or anything but I would like to know how to do this. I have tried various vb codes but they don't exclude the weekends/holidays.
View 3 Replies
View Related
Nov 11, 2009
to calculate how long a ticket is open in our system before being resolved. I don't want to count weekends, and if the ticket is 'suspended', I don't want to count that either. There is also the factor that the ticket 'un-suspend' date may be later than the ticket 'closed' date. Which is the bit that's throwing me.
So, I have the following fields
Ticket Open, Ticket Closed, Ticket Suspended Date, Ticket Unsuspended Date
A sample ticket might be (using above fields)
02/11/09 09/11/09 04/11/09 30/11/09
That 'should' equal two days (16 hours) as the Unsuspend date falls after the close date so it was suspended from the 4th until closure.
Now I want to know, in hours (8 hour day) how long that ticket took to resolve (i.e close), remembering you can't count the time it was suspended, or any time that fell over a weekend. Also not all tickets are suspended.
View 13 Replies
View Related
Mar 2, 2010
The below formulae allows me to see the difference between two dates and only returns the difference in working hours ie :
Difference between
02/02/2010 08:00 & 03/02/2010 08:00 is 16 Hours 0 Minutes
=(INT(A3)-INT(C6))+MAX(MOD(A3,1)-MAX(MOD(C6,1)))
The following displays it in the Hrs and Mins format
=TEXT(B15,"[h]")&" Hour"&IF(OR(TEXT(B15,"[h]")+0=0,TEXT(B15,"[h]")+0>1),"s "," ")&MINUTE(B15)&" Minute"&IF(MINUTE(B15)1,"s ",""))
View 9 Replies
View Related
Dec 29, 2013
I'm having difficulty to calculate hours between 2 or 3 days exclude non working hours.
Attached is the example of start date with time & end date with time.
The situation is like "when the case log in till the case assist in working hours." so i will get the hours from case log to case assist.
Testing.xlsx
View 8 Replies
View Related
Feb 9, 2009
If I have the start date (say February 01, 2009) and the job will take 100 working days, when will it finish if there is no work done over weekends? I assume you can use networkdays somehow but the final logic escapes me
View 2 Replies
View Related
Feb 2, 2008
I am attempting to get the formula in Column "E" (see attached excel file) to work based off the individual reps 'days off / holidays' (Columns K:P (or more as needed) that they might have. the formula I am using (which works fine) is:
=IF(C2=D2,0, SUMPRODUCT((WEEKDAY(ROW(INDIRECT(C2&":"&D2)),2)={2,3,4,5,6,7})*(COUNTIF($K$2:$S$2,ROW(INDIRECT(C2&":"&D2)))=0)))
My issue comes up when I am coping this formula for say 100+ rows. When I copy the formula to all of the rows, the (COUNTIF($K$2:$S$2) becomes static and does not realize that the row (ie. Row 26 Rep C) has different days off than Rep A. I can manually change the reference for the countif to specify the correct row to their own days but that becomes tedious very quickly. I was wondering if anyone has come across a way to make the countif work based off of that the name in Column B matches the name in Column G then looks 'to the right' and uses the 'days off' that are listed for the corresponding Rep. I have tried a few different ideas but nothing has worked so far.
View 2 Replies
View Related
Nov 25, 2009
i had a sheet with the employee name,Working Place, Designation,Starting Time & Ending Time of each employee working in a Department. I want to track the no of hours each employee worked in the Format 1 Hr: 45 Mins .
i tried to get the result by substracting the ending time from starting time and then formatted the cells using the TIME FORMAT from the FORMAT Menu>Format Cells > TIME. But i m not getting the required result. I want a vba code or formula for extracting the no of Hrs & Mins the employee worked using the above formula.
View 14 Replies
View Related
Oct 31, 2009
I am currently using Excel 2007 and I am trying to find a good working formula for Normal Hours worked:
I have the following code for Total Hours, Time and a Half and Double Time hours but I can't seem to get the right formula for working up to 8 hours.
Whereas C11 = Total hours added for the day.
=MOD(SUMPRODUCT(C8:C10-C7:C9),1) =Total Hours Worked
=Normal work hours between 0 to 8 hour work day.
=MIN("04:00",MAX(0,C11-"08:00")) =Time and a Half hours over 8 hours worked.
=MAX(0,C11-"12:00") =Double Time hours over 12 hours worked
View 9 Replies
View Related
Mar 3, 2008
I have a spreadsheet with various date fields and next to those time fields. I need to calculate the amount of working hours between the 2 lots of values
for example
Cell A has "22/02/2008"
Cell B has "16:44:00"
Cell J has "25/02/2008"
Cell K has "08:59:00"
The answer i'm looking for is 01:29:00. The working hours are Monday to Friday 07:30 - 16:00. This is what I have so far and it gives me the total hours between the 2 dates but not the working hours. =IF(J10-A10=0,K10-B10,((J10-A10)+(K10-B10))) (Formatted with [h]:mm:ss). I have tried using workingday() but can't get the desired result
View 5 Replies
View Related
Mar 18, 2014
I'm trying to calculate shift working hours without using dates.
The scenario is
Cell A1 = Start Time
Cell A2 = Start Time
Cell A3 = Break Time
Basically I want the output to calculate hours worked between:-
0000 and 0600 as a total in cell A4
0600 and 1800 as a total in cell A5
1800 and 0000 as a total in cell A6
Then if the value of A5 is greater than A3, subtract A3, but if the value of A5 is less than the value of A3, A5 should be zero and the remainder of the value of A3 subtracted from A4 (or A6) depending which has a value.
View 5 Replies
View Related
Jul 25, 2002
How should I calculate working hours between two dates? Say if start at 26 july at 15:00 and finish at 29 july at 10:00, the function should return 4 hours because the working hours are from 8am to 5pm (8 - 17), and there is a weekend between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates. And also, if have to add say 8 hours to a date, how should I calculate the result? Also this function should aware of the working hours and holidays, so it should ignore those times.
View 9 Replies
View Related
Jan 1, 2010
I would like to calculate the total hours between two dates using a unique formula and without inserting new columns. I have attached an example of the data I'm working with.
View 4 Replies
View Related
Mar 21, 2013
I am generating a spreadsheet that focuses on a target opening date. There is about 12 other headings along the top all stating the different phases of construction, permitting, etc. I need to exclude weekends and holidays from most of these columns, and only exclude holidays from about 2 of the columns. I think I am to use the formula for NETWORKDAYS, but not sure how or where to incorporate it.
View 9 Replies
View Related
Apr 18, 2007
How to calculate the hours between two dynamic dates.
Rules 1: It has to calculate only office hours (Let's say 9 AM to 5 PM)
Rules 2: The starting time may fall before 9 AM, then we have to do calculation from 9 AM on the same day. (Let's say start date with time 17/04/07 7:00:00 AM, then we have to consider the date with time from 17/04/07 9:00:00 AM for the calculation)
Rules 3:The starting time may fall After 5 PM, then we have to do calculation from 9 AM on the next day. (Let's say start date with time 17/04/07 8:00:00 PM, then we have to consider the date with time from 18/04/07 9:00:00 AM for the calculation)
Rules 4: It has to exclude the Saturday and Sunday
View 4 Replies
View Related
Mar 22, 2007
I have 2 dates+ times.
1 the contract start date and time.
2 the contract end date and time.
Can I calculate the number of working hours between these two using a formula?
So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?
Example
Start 06-Mar-07 10:00
End 14-Mar-07 14:00
This is 2 part days and over a weekend.
View 9 Replies
View Related
Jul 16, 2013
I'm trying to have a two week rolling dates, starting on the Monday and continuing until the following Friday, this is fine if static but when the start date is then Tuesday, Wednesday etc the week then includes either the Saturday or Sunday.
From using =TODAY(), how do I populate the next ten working days without including the weekends?
View 2 Replies
View Related
Apr 9, 2007
I currently have a formula like this:
e87-7+choose(weekday(e87-7),1,0,0,0,0,0,2
this formula is used because I was adding or subtracting a certain number of days from one date to figure out when a certain event would occur next. When the date fell on a weekend, I wanted to make sure that it rolled over to the next closest weekday.
HOWEVER, what I also want this formula to do is exclude weekends in the counting of the days. So basically, I want to exclude weekends completely from my formula.
example, Printing always occurs 4 days after the p.r. meeting. the p.r. meeting is in e87. so e87 + 4 = the printing date. but I dont want those 4 days to include weekends in the count AND I dont want the final date to fall on a weekend either.
View 9 Replies
View Related
Oct 17, 2006
I have a spreadsheet with bloomberg's auto feed, so in col A&B, the price will be updated everyday. I would like to calculate the Month-to- Date in Col C
e.g. MTD for today's closing = (today's closing price - last month end price)/last month end price
how can I constructure a formular in col C which will calculate the MTD automatically when a new price is added to the top everyday.
View 3 Replies
View Related
Sep 13, 2007
I want to get the list of days which are only weekdays ( excluding sat, sun but includes holidays during weekdays) I have tried WORKDAY function but it is not exactly i want coz it excludes holidays during weekdays as well.
View 5 Replies
View Related