I am looking for a formula that will tell me how many days in each month for which a given time span is active. For example the time span 1/1/2014-2/28/14. I want to know the time span is active for 31 days in January and 28 days in February. Another example: time span of 1/15/2014-2/28/2014. I want to know that the time span would be active for 16 days in January and 28 days in February. I am looking for a formula that will capture the amount of days in each month for which the time span covers. as I only know how to write a formula with multiple if statements that require a different formula for each given month, rather than one formula that applies to all months.
I am developing a report that tracks the efficiency of industrial sorters on an automated assembly line. The line runs around the clock in three shifts (1: 7:30am to 3:29pm, 2: 3:30pm to 11:29pm, and 3: 11:30pm to 7:29am), and collects certain performance indicators, such as units processed. I am trying to calculate the units processed during each shift on each day. For example, if a run ran from 2:30 pm to 4:30 pm, and processed 100 units, I would want 50 units credited to shift 2 and 50 units to shift 3 (we are assuming a steady rate of processing).
My data arrives from the machine with the following columns (each run is a separate row):
B|D|E|G|H Run #| Start Date| Start Time| Units Processed | End date | End Time
I have successfully used the start time to determine the starting shift with IF statements:
=IF(--E3<0.3125,3,(IF(--E3<0.6458,1,(IF(--E3<0.9792,2,3))))) and a similar formula to calculate the end shift. This works fine if the run only spans two shifts within the same day.
My problem is that some of the runs, run across more than one shift and even across days. For example, a run that ran from 10:30 pm on one day to 4:30 pm on the next, would overlap 5 shifts and two days. I need to be able to figure out the proportion of time spent on each shift, and use that to get the proportion of units processed during each shift on each day.
I am currently thinking of a convoluted series of nested IF statements (and generating lots of columns to the right of my data for each potential shift within a run), but this seems inelegant and cumbersome. Is there a more logical way to approach this? Even more specifically, is there a function that can pair my start/end dates and times with a set of shift start/end times and calculate the elapsed time for each shift within a run? Something with MATCH or VLOOKUP maybe?
I've got daily water level data that spans around one hundred years. I am looking for monthly average water level data, but rather than using the whole month, I'd like to average the first two days and the last two days. I want to have a single value for each month in the 100 years of data.
If the data was smaller I could do this by hand, however having 100 years worth of data = 1200 months = so many days...
It's tough since months don't have a set number of days, and then leap years and it all gets so complicated. I've never really had a problem where date was a criteria to pull values from, and I don't know how to work with this. The internet suggest the Averageif function which I have dabbled with, but no dice.
I'm looking for a formula that will calculate the difference in times between specific times while working with a 24 hr clock. Please see details below:
E3 provides the start time of 4:00 H3 provides an end time of 15:30
If an employee works betwen the hours of 0:00 (midnight) to 5:59, this is considered DIFF hours and is therefore the number I am seaking. So for the data noted above, the total DIFF hours worked is 2 hours.
How would you calculate the amount of days of a billing period for a consulting engagement by quarter when the engagement could span multiple quarters, be within a quarter or not be in a quarter at all? Project based billing
I want to calculate the end date of my German courses. This is how it works:
A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.
Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.
Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.
The workday function on excel cannot do this and I do not have any programming skills to work with VBA.
I can’t figure out why this formula is not working. I am trying to alter it a little, but I still think it should work. Here is what I am trying to do. I am looking to calculate the time difference between two work projects, but exclude time when the office is closed. So someone starts a project at 2pm and finish 10am the next day it will show a result of 4 hours because the office closes at 5.
Here is the formula. It is the time formula from cpearson.com ...
I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'
I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.
I need to create a spreadsheet that will calculate the difference between two dates and show the result in days. The complicated part is that weekends (Sat and Sun) need to be ignored and any time after 4:30 pm needs to be treated as the next business day. I have been trying to look at similar questions in forum and use the WORKDAYS function with little success.
Example:
A1- 14/08/09 4:40 p.m. B1- 17/08/09 9:10 a.m.
I need the answer (B1-A1) to show up as 0. But if the time in A1 was changed to 4:20 p.m. than the answer should be 1 day.
Excel 2010 - I need to create a graph that shows a week's use of a sportsground showing what sports were played, on which days and between which times. I thought I could show the times on the vertical axis, days on the horizontal axis and then the sports played in those times, however I'm unsure as to how to get the graph to recognise the times.
I've attached an example of some data and how I'd like to see it, I'm just not sure how I can do this using the chart set up!
I have a few thousand rows of this. The X's could be placed in any column. I need to go through this data and determine the maximum days between X's for each row. I can't think of how to do something like this with either an equation or with VBA.
I can't get it to line up in the table above. But basically, there could be an X in Sunday and on Wednesday in one row. The next, could be every day of the week, the next could be any other combination. There could be 7 X's, 1 X, 3 X's, whatever.
This is for employee time sheet and schedule. I have multiple employees work a specific shift on various days. I need the calculate the hours worked each day and then have them totaled at the end of the period. Here is and example:
Employee Monday Tuesday Wednesday Thursday Friday Saturday Sunday Total Hours Total Cost John Smith 10-5 12-6 9-2 5-10:30 3-8:30
How do I get it to calculate the difference in the same cell, convert it to hours, add up all the results and place it in the totals columns then calculate those totals by their pay rate to get my Labor cost?
I need to calculate turn around time between two sets of data reflecting both a starting date and time and obviously an ending date and time. This should reflect work hours meaning a day that starts at 08:00 and end at 16:30.
That would be a start and would be great if someone can show me how to calculate this.
But obviously people don't work on Sundays and only work from 08:00 to 12:00 on Saturdays... Can't even imagine how one would take this into account.
I seem to have the worst luck when it comes to getting dates and times to calculate together. My logic just seems to go straight out the window.
What I am trying to do, the end result, is get a Time Worked (duration) that I have spent on a ticket, and a Total Time, the time a ticket was opened, to the time it was closed.
I guess we can try to do this one step at a time.
The first thing that I would like to know is if there is a way to calculate Date/Time in a MM/DD/YYYY, H:MM format?
IE: Ticket Opened ...................Ticket Closed 5/16/2008 2:54 PM..............5/19/2008 10:47 AM Total Time in Days / Hours / Minutes
Right now I have the Date and Time split into separate cells, simply because I couldnt figure out a way to subtract the combined date and time.
The formula determine what was been completed on the previous work day. If it fell on a weekend or a holiday specified in another table, it would consider it the following weekday's work. However, the needs of management have changed and they would now like to see anything completed on a weekend or holiday push back to the previous weekday and I'm not exactly sure how to modify this formula to do that.
As an example, work was completed over Good Friday. Yesterday (Monday) when we ran the report, none of those showed up in our list of completed items until today (Tuesday). They would have liked those numbers to be included on Monday's report to get an accurate picture of work that was completed.
I have attached some sample data. Everything completed on the 18th, 19th is counted as 1 day behind but we would like 18th and 19th to be shown as 2 days behind, just like April 17. That way, if we ran the report today and set the filter to 1 (for column C), those items would not show up, but they would have shown up on yesterday's report.
I’ve tried formulas for this but nothing is working, and was wondering if there was some vba that would do the job
Please find attached a sample sheet of where I’m up to.
I’m trying to calculate when someone goes sick to see whether they are entitled to company sick pay (CSP) Statutory sick pay (SSP) and most people will have waiting days (W D) before qualifying for CSP.
A6:A735 have set dates for two years D6:D735 have the sick days an employee has taken B6:B735 Matches the sick date to the date in column A
G2 has how many days entitlement for CSP H2 has how many waiting days (W D) before CSP can start
In Column C i need CSP, SSP, or W D next to the number 1
And if someone only has 1 day sick they would not qualify for any of the above and I just need “S” in column C.
From the below example, I would need to know the difference between date & time of Received and Resolved in number of days. Meaning - time difference should also be calculated in days
CELL ACELL BCELL CCELL DCELL E - REQUIRED OUTPUTReceived DateReceived TimeResolved DateResolved TimeTurn Around Time - IN DAYS20-Jan-122:43:00 PM23-Jan-124:50:00 PMDifference between Resolved date & time and Received date & time
I have a huge two column spreadsheet. The first column is a list of times in the format: dd-mm-yy hh:mm:ss and the second column is a status of either START or STOP
Every time there is a START, I want it to count the difference between that time, and the next STOP time, and display the results in column C
Sometimes there will be multiple START's in a row or multiple STOP's in a row, but I am only interested when the status actually changes from the first START to the first STOP. It then resets until there is another START.
How to calculate overlapping times. I have found a few formulas on here I have tried to reproduce with no luck. This thread is similar to my issue.(How to calculate the amount of overlapping time) I need a non VBA format.
I need to know what times are overlapping; I need to see when two people are working active cases at the same time and how much time is overlapping. This is a huge spreadsheet with several rows of data. At this moment I am dong it all manually.
Here is a sample of what is looks like. As you can see the first line is overlapping with the second line by 8 minutes into the next case.
I have problem to calculate the time which is more than 23:00:00hrs in a file. I need to compare the benchmark time and the difference of time(start time and end time) and show pass/fail depending on benchmark set time. For few of the times which is more than 23:00:00 hrs the format is taking different(example: for 49:15:48, it is showing 02/01/1900 01:15:48 in formaula bar) for which i am not able to use formula and know pass/fail.
I am working on an employee weekly schedule and would like to be able to calculate the amount of hours an employee is scheduled each day. For example; if you worked from 7am to 4pm, I want to have a formula that can determine that (7am to 4pm= 9 hours) then sum the total amount of hours for all employees scheduled that day.
Mon Tue Wed Thrs Fri Sat Sun Total Employee 1 7-4 7-4 8-5 off 2-10 5-10 off 40 Employee 2 8-5 11-8 off 7-4 1-8 off 8-5 43
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
I want to calculate the TAT between multiple date: For example: I have a request I received on 1/2/2014 and I sent to Abhi on 1/2/2014(Same day) and I got a reply on 1/3/2014 from Abhi. I forwarded the same request on 1/3/2014 to Prasad and got a reply on 1/5/2014. And I closed the request on 1/5/2014. How do I calculate TAT on this ? I want the Tat to be shown as 3 days because I just took three days on the request to complete that is 1/2/2014, 1/3/2014 and 1/5/2014..